(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:- No Document Type Applies
MONTHYEARML24227A5212024-08-12012 August 2024 Inservice Inspection Request for Information ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21354A7632021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 ML21354A7592021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 ML21354A7602021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 ML21354A7612021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 ML21354A7462021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 ML21354A7572021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 ML21354A7492021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 ML21354A7562021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 ML21026A2602021-02-0808 February 2021 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-034 ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions ML20135G7202020-05-14014 May 2020 Final ASP Analysis - ANO 1 (LER 313-93-003) ML19009A3222019-01-0808 January 2019 NRC-2017-000688 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed (Arkansas Nuclear One, Units 1 and 2, FHRR - Released Set) ML18228A5012018-08-15015 August 2018 NEI 99-02 FAQ 18-04 ANO Uswc Rev 1 W/Proposed NRC Response ML18232A2332018-06-20020 June 2018 FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018 ML18002A2362018-01-0303 January 2018 Public Notice of Application for Exigent Amendment, Request for Allowance to Exclude Exercise of Control Element Assembly 4 Related to Surveillance Requirement 4.1.3.1.2 for Remainder of Cycle 26 ML18008A2972018-01-0303 January 2018 ANO Timeline for Remaining Key Milestones CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML16327A5302016-12-0202 December 2016 Enclosure 1 - Mitigating Strategies Flood Hazard Information Tables for Interim Staff Response (Redacted Version) ML16285A3312016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-09 ML16285A3262016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-03 ML16225A5402016-08-12012 August 2016 U.S. Nuclear Regulatory Commission Staff Review of Resolutions of Arkansas Nuclear One Internal Events and Fire PRA Facts and Observations (F&Os) ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14329A4112014-08-15015 August 2014 U.S. Nuclear Regulatory Commission, Record of Review, Arkansas Nuclear One Unit 2 (ANO-2), LAR Attachment V- Table V-1 Internal Events PRA Facts and Observations (F&Os) ML14219A4302014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 11 of 27 ML14220A1662014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 27 of 27 ML14220A1642014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 26 of 27 ML14220A1632014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 23 of 27 ML14220A1622014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 25 of 27 ML14220A1612014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 24 of 27 ML14220A0952014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 22 of 27 ML14220A0942014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 21 of 27 ML14220A0932014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 20 of 27 ML14220A0922014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 19 of 27 ML14219A4352014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 18 of 27 ML14219A4342014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 17 of 27 ML14219A4332014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 13 of 27 ML14219A4312014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 12 of 27 ML14219A4232014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 14 of 27 ML14219A4282014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 10 of 27 ML14219A4272014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B, (Records Being Released in Their Entirety), Part 9 of 27 ML14219A4262014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 8 of 27 ML14219A4252014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 16 of 27 ML14219A4242014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 15 of 27 ML14218A4882014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety) ML14218A4972014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group C (Records Being Released in Part) ML14218A6052014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 4 of 27 2024-08-12
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML24190A1452024-07-0808 July 2024 Public Meeting Slides for Arkansas Nuclear One 2023 Annual Assessment, Pope County Quorum Court 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol ML22259A1222022-09-0808 September 2022 ANO Service Water KM Version ML21354A7552021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports 2CAN011502, Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections2015-01-12012 January 2015 Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections ML13133A1382013-05-10010 May 2013 One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube Plugging and Proximity Calls ML13133A1362013-05-10010 May 2013 One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube to Plug and Proximity Calls ML12241A2962012-08-28028 August 2012 RAI for the Request to Use of Alternate ASME Code Case N-770-1 Baseline Examination, Request for Alternative ANO2-ISI-007 ML1019004182010-06-28028 June 2010 Quick View Chart 0CAN061001, Annual 10 CFR 50.46 Report for Calendar Year 2009 Emergency Core Cooling System Evaluation Changes2010-06-0303 June 2010 Annual 10 CFR 50.46 Report for Calendar Year 2009 Emergency Core Cooling System Evaluation Changes 2CAN070807, Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests2008-07-31031 July 2008 Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests 1CAN070801, Transmittal of Analysis of Proposed Technical Specification Change Sodium Hydroxide Tank Concentration2008-07-30030 July 2008 Transmittal of Analysis of Proposed Technical Specification Change Sodium Hydroxide Tank Concentration ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0710002572007-03-26026 March 2007 Attachment 5 - HI-2063601, Holtec Licensing Report for ANO Unit 2 Partial Rerack, (non-propriety) ML0519603252005-07-15015 July 2005 Attachment 3 - Recommendation and Action Item Cross Reference Table 2005-025 ML0427205342004-09-28028 September 2004 Tables to ANO-2 Amendment on Administrative Controls (Amendment No. 255) ML0426101132004-09-13013 September 2004 Plant Engineering Branch Open Items Interim Safety Basis (URI 2002003-01) ML0414101322004-04-27027 April 2004 E-mail Dated 04/27/04 ANO 1 Slides for NRC Conference Call on 04/27/04 ML0406407512004-02-20020 February 2004 Attachment 3: List of Components in Fire Zones 98J and 99M ML0406407502004-02-20020 February 2004 Equip/Cable/Reel#/Cable Type/Po#/Insulation/Material/Type ML0230501762002-09-17017 September 2002 Attachment 13, ANO-1, Units 1 and 2, Table B-1, Minimum Staffing Requirements ML0230501692002-09-16016 September 2002 Attachment 12, ANO-1, Units 1 and 2, Table B-1, Minimum Staffing Requirements 2024-07-08
[Table view] |
Text
'p C-,
TABLE B-i MINIMUM STAFFING REQUIREMENTS (Including Capability for Additional Staffing)
MAJOR FUNCTIONAL POSITION/TITLE or EXPERTISE ON-SHfFT' AVAILABLE' AVAILABLE3 AREA U-I U-2 IN 60 MIN IN 90MIN Plant Operations Shift Manager (SRO) 4 1 I Control Room Supervisor (SRO) 2 2 Control Room Operators 2 2 Auxiliary Operators 2 2 7 I Shift Technical Advisor (Shift Engineer) 1 Waste Control Operator (Radwaste) 1 1 2 Emergency Direction and 14 1 2 Control (Emer. Coord.)
is is Notification/ Communicator Communicationý Control Room/TSC/EOF Communications 2 Personnel Radiological Accident Dose Assessment Supervisor 110 1t0 Assessment and Support of Nuclear Chemists 1 I
Operational Accident (Offsite Dose Projections)
Assessment, and Protective Health Physics Technician l i1 I Actions (in plant) (In-Plant Surveys)
Health Physics Technician I 1 -4 (4
(Onsite Out-of-Plant Surveys)
(4 Health Physics Technicians 32 32 2 2 C-) (Protective Actions-In Plant)
Health Physics Technicians 2 2 CD (Offsite Surveys)
(4
-n m
'p.', Chemistry/R~adiochemistry Nuclear Chemistsio I I I
I TABLE B-1 (Continued)
GROUP POSITIONtTI'LE ON-SI-HIFT AVAILABLE' AVAILABLE3 U-1 U-2 IN 60MIN EN 90 MIN Repair and Corrective Electrical Maintenance 32 32 15 Actions I&C Technician 16 32 32 Mechanic 2 19 19 Plant System Engineering Core/Thermal Hydraulics I Electrical Engineer I Mechanical Engineer 1 Fkefighting Unit 1 SAP, Sec. 9.8 Local Support Unit 2 SAR, App. 9A (30 Minute Response)
Rescue Operations and 22 Local Support First-Aid (30 Minute Response)
Site Access Control and Security Personnel All per Security Plan Personnel Accountability C
C U
'These ERO positions may be vacant for not more than two hours, in order to provide for unexpected absences, provided immediate action is taken to fill the required position.
2 May be provided by shift personnel assigned other functions.
3 Once notified, emergency responders are to report to their assigned facility ag soon as possible and without delay.
' The Shift Manager initially assumes the responsibility for Emergency Direction and Control, then is relieved by the TSC Director or EOF Director.
SElectrical Maintenance personnel.
6 l&C Maintenance personnel.
"7The duties of the Shift Technical Advisor are performed by the Shift Engineer of the affected unit.
- The duties of the Communicator are performed by the Shift Engineer ofthe unaffected unit.
9 STA duties encompass the Core/Thermal Hydraulics function.
10 There are two Nuclear Chemists on shift qualified to perform offsite dose projections and chemistry/radiochemistry functions for either unit.
"11 Shift Health Physics Technicians are qualified to perform Protective Actions In-Plant and In-Plant Surveys.