ML023050189

From kanterella
Jump to navigation Jump to search
Attachment 16, ANO-1, 1R17 Steam Generator Status Report
ML023050189
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/17/2002
From:
Entergy Operations, Framatome ANP
To:
Office of Nuclear Reactor Regulation
Shared Package
ML023050214 List:
References
Download: ML023050189 (1)


Text

1R17 Steam Generator Status Report 1 /17/D2 3 04 AM A

FRAMATOME ANP Test Type Leg Probe Extent Planned Acquired Resolved Planned Acquired Resolved Bobbin Coll Exam Non-Sleeved Tubes COLD S51UL UTEL"fE 13738 1734 1374 14229 14225 1422.

Non-Sle&ved Tubes HOT Sl1UL LTEUTE 448 448 417 487 Tubes vd31" Sleeves COLD 51OUL LSELTE 54 54 121 121 Tubes w/80" Sleeves COLD SIOUL LSELTE 376 275 359 35!

Total Bobbin Exams 14812 14610 14'10 15176 15172 151172 Sleeve Bobbin Exam 3 1600 Seves HOT 400UL USELUE 54 54 121 121 0 1600 Sleeves HOT 40CUL USELSE 371 375 359 3W3 Total Sleeve Bobbin Exams 430 430 480 480 Sleeve #Potnt Exam 31",leeves - Upper Rolls HOT 400PP USEU*R 11 11 23 23 31"Seeves* Lower Rols HOT 400PP ACRLSE 11 11 23 23 8Sleeves -Upper Rolls HOT 400PP USEUSR 166 165 129 129 8"Sleeves-LowerfRos HOT 400PP MSRLSE 156 156 123 129 Total Sleeve +Polnt Exams 334 334 304 304 Lower Tubesheet Crevice

  • Polnt Examination Lotr Tubesheet Crevice COLD 52OPP LTSLTS 583 583 290 290 Lower Tubesheel COLD 52OPP LTSLTS 34 34 Total Lower Tubesheet Crevice,ePolrt Examlnstons t

617 117 290 290 Upper Roll #Point Examination Upper Roll Tmnaltion HOT 520PP UTEUTE 12074 12073 12072 13482 13448 13448 Re-Roll Transition HOT 52OPP UTEUTE 2104 2101 2101 1244 1244 Deep Re-Roll Transition HOT 520PP UTELITE 4

4 Total Upper Roll *Point Examinations 14182 14178 14177 1496 14.992 1452 Selected ÷Point Examinations Denied Locations 08S-UTE HOT/COLD 520PP Various 122 122 62 62 SSA MRPC Exam HOT 52CPP Various 11 I1 1

I Total Selected 4Polnt Exams 133 133 63

3 Special Intleres.t (Dlagnostc)

MRPC Tubes Various 6"*6 68 417 487 IndIcation$s Vaenom 758 758 548 S4 Post Re-Roll Eddy Current Bobbin HOT 51OUL I5SUTE 188 123 123 164 76 75 4POInl HOT 52OPP UTEUR1 188 17 1

122 154 76 71 Plug Visual Examination 20% MW Ribbed Plugs HOT 9

20% Welded Plugs HOT 36 1

isil_

100% Weshinghouse Rbbed I

Plugs COLD 84 7

100% B&W E..vxploe PIu:s COLD 4

2 20% Welded Plu.s COLD 11 7

"nwaftmi Dlsnbution. Entergy-R. Henry. R Jones.OCC Frsmatoma-ANP - G.Argelaids. B Covfl, M. Boudreaux, Fads Track, Data Ntanagemrnl 2 -d 6 e21:60 20 LI "O0 SEn l er OTSG A OTSG B