ML023050180

From kanterella
Jump to navigation Jump to search
Attachment 14, Entergy Actions for TMI Tube Sever Concerns for ANO-1
ML023050180
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/30/2002
From: Sharon Bennett
Entergy Operations
To: Alexion T
Office of Nuclear Reactor Regulation
Shared Package
ML023050214 List:
References
Download: ML023050180 (3)


Text

i-'acie 1 iý'mas Alexion-ANO-1 Thomas Actions for TMI SG Tube Sever Conce rn Alexion - ANO-1 Actions for TMI SG Tube Sever Concern Paae 1 From: "BENNETT, STEVE A" <SBENNE2@entergy.com>

To: "T'om Alexion'" <twa@nrc.gov>

Date: 9/30/02 10:14AM

Subject:

ANO-1 Actions for TMI SG Tube Sever Concern Tom, See attached notes for Call tomorrow Attachment 14

Entergy Actions for TMI Tube Sever Concerns for ANO-1 ANO-1 Scope of Potential Concern

"* ANO-1 did not install Westinghouse or B &W 1-600 mechanical rolled plugs during the 1980's. Instead, ANO-1 used either welded, ribbed or explosive plugs

"* The first rolled plug was installed in the ANO-1 OTSG's in 1992 which was Alloy-690 material.

"* Review of past outage eddy current data revealed no wear indications have ever been detected at the tubesheet face

"* ANO worked with Framatome, based on the criteria presented at the Feb. 1.

2002 meeting with the NRC, to determine the susceptible plugged tube list

"* List included:

UTS plugs removed and replaced at a later date, UTS plugs installed could have leaked and another type of plug was placed in the tube to seal the water in the tube, 1-690 plugs installed was rerolled/retorqued at a later date to possibly seal in water

"* A total of 12 tubes were determined to be susceptible to possible tube swelling Entergy Planned Actions During 1R17 Outage

"* ANO has no plans to remove any plugs during 1R1 7

" All susceptible tubes have been evaluated and a total of 63 neighboring tubes will be plugged. 4 stabilizers will be installed in the upper span due to the industry operating experience events

"* Some tubes will be plugged as an extra "buffer zone" downstream of plugged tubes

"* Eddy Current Analysis will be performed on all tubes surrounding susceptible tubes to ensure no wear is seen on tubes prior to plugging/stabilizing

[c.\WINDOVWS\TEM P\GW}O00091.TM P Page Page 11 1

! C:\WINDOWS\TEMP\GW}0000l .TMP Mail Envelope Properties (3D9850F3.BC3 : 10: 15299)

Subject:

ANO-1 Actions for TMI SG Tube Sever Concern Creation Date: 9/30/02 9:27AM From: "BENNETT, STEVE A" <SBENNE2@entergy.com>

Created By: SBENNE2@enterev.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion)

Post Office Route owf4_po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 45 09/30/02 09:27AM TMI Tube Sever Notes.doc 20480 Mime.822 29508 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard