MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol ML22259A1222022-09-0808 September 2022 ANO Service Water KM Version ML21354A7552021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports 2CAN011502, Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections2015-01-12012 January 2015 Response to Request for Additional Information Concerning the Spring 2014 Steam Generator Inspections ML13133A1382013-05-10010 May 2013 One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube Plugging and Proximity Calls ML13133A1362013-05-10010 May 2013 One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube to Plug and Proximity Calls ML12241A2962012-08-28028 August 2012 RAI for the Request to Use of Alternate ASME Code Case N-770-1 Baseline Examination, Request for Alternative ANO2-ISI-007 ML1019004182010-06-28028 June 2010 Quick View Chart 0CAN061001, Annual 10 CFR 50.46 Report for Calendar Year 2009 Emergency Core Cooling System Evaluation Changes2010-06-0303 June 2010 Annual 10 CFR 50.46 Report for Calendar Year 2009 Emergency Core Cooling System Evaluation Changes 2CAN070807, Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests2008-07-31031 July 2008 Transmittal of Request for Alternative ANO2-PT-001 Visual Examination of Extended Reactor Coolant Pressure Boundary Piping During System Leakage Tests 1CAN070801, Transmittal of Analysis of Proposed Technical Specification Change Sodium Hydroxide Tank Concentration2008-07-30030 July 2008 Transmittal of Analysis of Proposed Technical Specification Change Sodium Hydroxide Tank Concentration ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0710002572007-03-26026 March 2007 Attachment 5 - HI-2063601, Holtec Licensing Report for ANO Unit 2 Partial Rerack, (non-propriety) ML0519603252005-07-15015 July 2005 Attachment 3 - Recommendation and Action Item Cross Reference Table 2005-025 ML0427205342004-09-28028 September 2004 Tables to ANO-2 Amendment on Administrative Controls (Amendment No. 255) ML0426101132004-09-13013 September 2004 Plant Engineering Branch Open Items Interim Safety Basis (URI 2002003-01) ML0414101322004-04-27027 April 2004 E-mail Dated 04/27/04 ANO 1 Slides for NRC Conference Call on 04/27/04 ML0406407512004-02-20020 February 2004 Attachment 3: List of Components in Fire Zones 98J and 99M ML0406407502004-02-20020 February 2004 Equip/Cable/Reel#/Cable Type/Po#/Insulation/Material/Type ML0230501762002-09-17017 September 2002 Attachment 13, ANO-1, Units 1 and 2, Table B-1, Minimum Staffing Requirements ML0230501692002-09-16016 September 2002 Attachment 12, ANO-1, Units 1 and 2, Table B-1, Minimum Staffing Requirements 2024-01-17
[Table view] |
Text
, ',
-J
'Si TABLE B-I
-J MINIMUM STAFFING REQUIREMENTS (Including Capability for Additional Staffing)
MAJOR FUNCTIONAL POSITION/TITLE or EXPERTISE ON-SHIFT' AVAILABLE3 AVAILABLE3 AREA U-i U-2 IN 60 N4N IN 90 MIN 4
Plant Operations Shift Manager (SRO) 1 Control Room Supervisor (SRO) 2 Control Room Operators 2 2 Auxiliary Operators 2 2 I
Shift Technical Advisor (Shift Engineer)7 1 I
Waste Control Operator (Radwaste)
Emergency Direction and 14 14 2 Control (Emer. Coord.)
Notification/ 2 Communicator Communication Control RoomITSC/EOF Communications 2 Personnel Radiological Accident Dose Assessment Supervisor mI 1 Nuclear Chemists 110 1 Assessment and Support of Operational Accident (Offsite Dose Projections) 1 1 Assessment, and Protective Health Physics Technician' 1 1 Actions (in plant) (In-Plant Surveys)
Health Physics Technician - - I I -4 m
aJ (Onsite Out-of-Plant Surveys)
Health Physics Technicians 32 32 2 2 (Protective Actions-In Plant)
(0 2 Health Physics Technicians 2 S..
(Offsite Surveys)
Chemistry/Radiochemistry Nuclear Chemistsi' I I I Iii
'Si
C:,
7U I
TABLE B-I (Continued)
GROUP POSITION/TITLE ON-SHIFT AVAILABLE1 AVAILABLE3 U-1 U-2 IN 60 MIN IN 90 MIN 32 32 Repair and Corrective Electrical Maintenance Actions I&C Technician 16 32 32 Mechanic 2 Plant System Engineering Core/Thermal Hydraulics 1 Electrical Engineer 1 1
Mechanical Engineer Firefighting Unit 1 SAR, Sec. 9.8 Local Support Unit 2 SAR, App. 9A (30 Minute Response)
Rescue Operations and 22 Local Support First-Aid (30 Minute Response)
Site Access Control and Security Personnel All per Security Plan Personnel Accountability
-I 0
U, 0
0 a,
a, "3
-4 "e
TABLE B-I (Continued)
These ERO positions may be vacant for not more than two hours, in order to provide for unexpected absences, provided immediate action is taken to rill the required position.
2 May be provided by shift personnel assigned other functions.
3 Once notified, emergency responders are to report to their assigned facility as soon as possible and without delay.
4 The Shift Manager initially assumes the responsibility for Emergency Direction and Control, then is relieved by the TSC Director or EOF Director.
3 Electrical Maintenance personnel.
6 I&C Maintenance personnel.
7 The duties of the Shift Technical Advisor are performed by the Shift Engineer of the affected unit.
8 The duties of the Communicator are performed by the Shift Engineer of the unaffected unit.
9 STA duties encompass the Core/Thermal Hydraulics function.
10 There are two Nuclear Chemists on shift qualified to perform offsite dose projections and chemistry/radiochemistry functions for either unit.
"1Health Physics Technicians are qualified to perform Protective Actions In-Plant and In-Plant Surveys.