MONTHYEARML16260A0602016-09-14014 September 2016 Submittal of Flooding Hazard Re-evaluation Report, Required Response for Near-Term Task Force Recommendation 2.1 Project stage: Other ML16315A2652016-11-14014 November 2016 Nuclear Regulatory Commission Plan for the Audit of Entergy Operations, Inc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Arkansas Nuclear One, Units 1 and 2 Project stage: Other ML16327A4942016-12-0202 December 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (CAC Nos. MF8379 and MF8380) Project stage: Other ML16327A5302016-12-0202 December 2016 Enclosure 1 - Mitigating Strategies Flood Hazard Information Tables for Interim Staff Response (Redacted Version) Project stage: Other ML17230A2612017-08-29029 August 2017 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation Project stage: Acceptance Review 2016-12-02
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21354A7632021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 ML21354A7592021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 ML21354A7602021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 ML21354A7612021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 ML21354A7462021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 ML21354A7572021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 ML21354A7492021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 ML21354A7562021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 ML21026A2602021-02-0808 February 2021 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-034 ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions ML20135G7202020-05-14014 May 2020 Final ASP Analysis - ANO 1 (LER 313-93-003) ML19009A3222019-01-0808 January 2019 NRC-2017-000688 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed (Arkansas Nuclear One, Units 1 and 2, FHRR - Released Set) ML18228A5012018-08-15015 August 2018 NEI 99-02 FAQ 18-04 ANO Uswc Rev 1 W/Proposed NRC Response ML18232A2332018-06-20020 June 2018 FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018 ML18002A2362018-01-0303 January 2018 Public Notice of Application for Exigent Amendment, Request for Allowance to Exclude Exercise of Control Element Assembly 4 Related to Surveillance Requirement 4.1.3.1.2 for Remainder of Cycle 26 ML18008A2972018-01-0303 January 2018 ANO Timeline for Remaining Key Milestones CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML16327A5302016-12-0202 December 2016 Enclosure 1 - Mitigating Strategies Flood Hazard Information Tables for Interim Staff Response (Redacted Version) ML16285A3312016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-09 ML16285A3262016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-03 ML16225A5402016-08-12012 August 2016 U.S. Nuclear Regulatory Commission Staff Review of Resolutions of Arkansas Nuclear One Internal Events and Fire PRA Facts and Observations (F&Os) ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14329A4112014-08-15015 August 2014 U.S. Nuclear Regulatory Commission, Record of Review, Arkansas Nuclear One Unit 2 (ANO-2), LAR Attachment V- Table V-1 Internal Events PRA Facts and Observations (F&Os) ML14219A4312014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 12 of 27 ML14220A1662014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 27 of 27 ML14220A1642014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 26 of 27 ML14220A1632014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 23 of 27 ML14220A1622014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 25 of 27 ML14220A1612014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 24 of 27 ML14220A0952014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 22 of 27 ML14220A0942014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 21 of 27 ML14220A0932014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 20 of 27 ML14220A0922014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 19 of 27 ML14219A4352014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 18 of 27 ML14219A4342014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 17 of 27 ML14219A4332014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 13 of 27 ML14219A4242014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 15 of 27 ML14219A4302014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 11 of 27 ML14219A4282014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 10 of 27 ML14219A4272014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B, (Records Being Released in Their Entirety), Part 9 of 27 ML14219A4262014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 8 of 27 ML14219A4252014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 16 of 27 ML14218A4882014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety) ML14218A4972014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group C (Records Being Released in Part) ML14218A6052014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 4 of 27 ML14218A6062014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 1 of 27 ML14218A6072014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 2 of 27 2022-02-16
[Table view] |
Text
Arkansas Nuclear One, Units 1 & 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation Not included Not included Not included FHRR Table 4-1 in DB in DB in DB Streams and Rivers PMF on Arkansas River 358.0 ft, 10.0 ft 368.0 ft, FHRR Table 4-1 NGVD29 NGVD29
[REDACTED] [REDACTED] [REDACTED] [REDACTED] [REDACTED]
Failure of Dams and Onsite Water Control/Storage Structures Not included Not included Not included FHRR Table 4-1 in DB in DB in DB Storm Surge Not included Not included Not included FHRR Table 4-1 in DB in DB in DB Seiche Not included Not included Not included FHRR Table 4-1 in DB in DB in DB Tsunami Not included Not included Not included FHRR Table 4-1 in DB in DB in DB Ice-Induced Flooding Not included Not included Not included FHRR Table 4-1 in DB in DB in DB
Arkansas Nuclear One, Units 1 & 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Channel Migrations/Diversions Not included Not included Not included FHRR Table 4-1 in DB in DB in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot.
Arkansas Nuclear One, Units 1 & 2 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation North Train Bay Door 354.4 ft, Minimal 354.4 ft, FHRR Table 4-2 NGVD29 NGVD29 South Train Bay Door 354.4 ft, Minimal 354.4 ft, FHRR Table 4-2 NGVD29 NGVD29 Between Warehouse and 355.0 ft, Minimal 355.0 ft, FHRR Table 4-2 Reactor Building Unit 2 NGVD29 NGVD29 West of Maintenance Building 353.7 ft, Minimal 353.7 ft, FHRR Table 4-2 NGVD29 NGVD29 North of Turbine Building Unit 2 353.7 ft, Minimal 353.7 ft, FHRR Table 4-2 NGVD29 NGVD29 South of Turbine Building Unit 2 355.1 ft, Minimal 355.1 ft, FHRR Table 4-2 NGVD29 NGVD29 South of Central Support Building 354.0 ft, Minimal 354.0 ft, FHRR Table 4-2 NGVD29 NGVD29 North of Central Support Building 357.7 ft, Minimal 357.7 ft, FHRR Table 4-2 NGVD29 NGVD29 Northeast of Turbine Building 354.4 ft, Minimal 354.4 ft, FHRR Table 4-2 Unit 2 NGVD29 NGVD29 Transformer Yard 354.4 ft, Minimal 354.4 ft, FHRR Table 4-2 NGVD29 NGVD29 East of Turbine Building Unit 1 354.3 ft, Minimal 354.3 ft, FHRR Table 4-2 NGVD29 NGVD29
Arkansas Nuclear One, Units 1 & 2 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Northwest of Intake Structure 354.1 ft, Minimal 354.1 ft, FHRR Table 4-2 NGVD29 NGVD29 North of Intake Structure 354.2 ft, Minimal 354.2 ft, FHRR Table 4-2 NGVD29 NGVD29 North of ISFSI 356.3 ft, Minimal 356.3 ft, FHRR Table 4-2 NGVD29 NGVD29 South of ISFSI 355.6 ft, Minimal 355.6 ft, FHRR Table 4-2 NGVD29 NGVD29 East of Cooling Tower 351.4 ft, Minimal 351.4 ft, FHRR Table 4-2 NGVD29 NGVD29 West of Warehouse 351.2 ft, Minimal 351.2 ft, FHRR Table 4-2 NGVD29 NGVD29 South of Warehouse 351.4 ft, Minimal 351.4 ft, FHRR Table 4-2 NGVD29 NGVD29 West of Diesel Oil Storage Tank 354.5 ft, Minimal 354.5 ft, FHRR Table 4-2 NGVD29 NGVD29 West of Engineering/Modification 352.2 ft, Minimal 352.2 ft, FHRR Table 4-2 Building NGVD29 NGVD29 Between 352.7 ft, Minimal 352.7 ft, FHRR Table 4-2 Engineering/Modification Building NGVD29 NGVD29 and Reactor Building 1 East of Diesel Fuel Storage Vault 353.7 ft, Minimal 353.7 ft, FHRR Table 4-2 NGVD29 NGVD29 Note 1: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table Note 2: Reported values are rounded to the nearest one-tenth of a foot.