U1R28 Today, Day 66
ML052030492
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/08/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2001-0282
Download: ML052030492 (2)


Text

- . . a (t-33'q Comminve to Nuclear Excefteno>I

. Nn , ... _ ..

Point Beach Refueling Outage Edition TODAY June 8, 2004 CONTACT INFORMATION Control Room Emergency - x2911 Work Control Center - x6703 OCC - x 7190 - Optlon 1 Lessons Learned - x7190 - Option 2 Plant Status - x7190 - Option 3 Accomplishments

. BOL Physics Test

  • Bypass/Open/Test MSIV's Personnel Last 24 Hours Outage to Safety _ _ _ _ _

Recordable - 0

__Date Recordable -1 Schedule Focus Areas/Priorities Disabling - 0 Disabling- 0

  • Turbine Rollup and Trip Test
  • Unit online

'OSHA Recordable - Back strain.

  • Increase Power to 28%

We[ Last 24 Hours l Outage to Date ALARA l 0.089 87.493 R Dose as of the end of Day 64

-I -. - . - - - -

inrormaon in s recoro was Soe inaccordance with INFdom of 1rSmant Act exempon - i, Y, 1/?

rm-aeenA ,&

. . N

'Pol!,aifrroid, I'.;..I

!% "M '6"'.

, ., tV:J--; '. '_

IM" June 8, 2004 OUTAGE GOALS NUCLEAR SAFETY GOAL ACTUAL HUMAN PERFORMANCE GOAL ACTUAL PERFORMANCE GA lACUL Unplanned orange/red paths None None Security Violations S 12 loggable events 4 Reactor trips (either unit) None 1 Station human performance clock None 4 resets__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Safeguards actuation (either unit) None None Rework S 1% On Goal Loss of shutdown cooling None None SCHEDULE PERFORMANCE Outage Duration Loss of Rx vessel level control None None (excludes extensions due to S 30 days Off Goal extended head or BMI inspections)

INDUSTRIAL SAFETY Mod Implementation 100% of Rev 0 On Goal PERFORMANCE

> 85% schedule Lost time accidents None None Schedule Compliance compliance with Off Goal outage milestone Personnel Injuries (OSHA recordable) None 1 Emergent work (during S2% late additions On Goal implementation) S 5%Emergent _ ___

RADIOLOGICAL PERFORMANCE Scope Complete 2 95% of On Goal Rev 0 scope ______

Radiation exposure (Excludes additional 100% of Scheduled dose from any head or BMI repair s 92 R 87.493 R Operator Burdens Operator Burdens On Goal contingencies) complete Personnel contaminations SK CPM 12 Post Outage availability 2 150 days of Available at continuous operation a later date Radiological events (defined as unplanned uptake v/assigned dose >10 mrem or S1 event 1 BUDGET PERFORMANCE Within -2%budget outage to 0% of Seriously Challenged dose event based on ED alarms fladmaterial event (defined as any rad *1 event 0 material outside RCA 2 100 CPM) ___event_

Operating Experience OE17929 - Nuclear Instrumentation System (NIS) Calibrated Using Incorrect NIS Currents

Purpose:

  • Present industry experience during power ascension NI adjustments.
  • Reinforce use of verification/validation, and Stop Wheni Unsure human performance tools.
  • Reinforce need to follow SQUG procedures.

Discussion:

Engineering generated 47% power currents during power ascension testing of a new cycle using new BEACON software, but extracted incorrect data from the output and sent it to the plant for installation. After these currents were installed, once the unit stabilized at full power, delta flux indications were 7% lower than predicted. After the cause/error was uncovered, correct currents from a full power map were installed and delta flux agreed with predictions.

Human Performance What is a post-job brief?

  • According to NP 1.6.10, Pre- and Post-Job Briefs, it is a review of recently performed tasks to identify strengths or weaknesses that can be used to improve future performances of the tasks.

What are your responsibilities for conducting or attending post-job briefs?

NP 1.6.10, Pre- and Post-Job Briefs, lists the following responsibilities:

  • Managers and supervisors establish requirements, ensure the adequacy of, and attend or conduct post-job briefs.
  • Site personnel request post-job briefs when necessary and participate using a questioning attitude.
  • With the exception of IPTE, personnel other than supervisors can conduct post-job briefings.