Summary of Annual Assessment Meeting with Dominion Power Millstone Units 2 & 3
ML030920135
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/02/2003
From: Brian Mcdermott
NRC/RGN-I/DRP/PB6
To:
Shared Package
ml030650870 List:
References
Download: ML030920135 (4)


Text

April 2, 2003 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE UNIT 2 AND UNIT 3

SUBJECT:

SUMMARY

OF MARCH 20, 2003, ANNUAL ASSESSMENT MEETING WITH DOMINION POWER On March 20, 2003, at 1:00 p.m., an annual assessment meeting was conducted at the Millstone Power Station, L. F. Sillin Jr. Nuclear Training Center on Rope Ferry Road in Waterford, CT, between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc. The NRC presented and discussed its assessment of the safety performance of Millstone Station for the period between January 1 through December 31, 2002.

The NRC presented a summary of national plant performance and discussed the annual assessment results for Millstone Unit 2 and Unit 3. An update on NRC actions to enhance nuclear plant security was also presented. At the end of the meeting between the NRC and Dominion, public attendees were offered the opportunity to ask questions of NRC officials. Questions raised by local media and concerned citizens were addressed by the NRC. There were several feedback forms submitted by the public immediately following the meeting. The attendance list is enclosed (Enclosure 1). The presentation slides can be located in the Agencywide Documents Access and Management Systems (ADAMS) by referring to Accession No. ML030900322.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA by Glenn Dentel Acting For/

Brian McDermott, Chief Projects Branch 6 Division of Reactor Projects

Enclosure 1 NRC Attendees: A. Blough, Director, Division of Reactor Projects (DRP), Region 1 S. Schneider, Senior Resident Inspector S. Kennedy, Resident Inspector P. Cataldo, Resident Inspector V. Nerses, Senior Project Manager, NRR Licensee Attendees: J. Price, Site Vice-President A. Jordan, Director, Nuclear Engineering G. Hicks, Director, Nuclear Safety and Licensing P. Parulis, Manager, Nuclear Oversight S. Sarver, Director, Nuclear Station Operations and Management State and Local Government Attendees:

J. DePasquale, Waterford Police Dept.

M. Pendleton, Chief, Waterford Police Dept.

D. Galloway, Connecticut Dept. of Radiation Meeting Observers: J. Besade, Fish Unlimited G. Gustin, New London Day J. Peabody, Waterford Resident P. Reynolds, Waterford Resident

Dominion Nuclear Connecticut, Inc. 3 DOCUMENT NAME: G:\BRANCH6\ROP Assessments\ROP3 End of Cycle\Millstone-Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME KJenison/KMJ BMcDermott/GTD for DATE 3/31/03 4/02/03

Dominion Nuclear Connecticut, Inc. 4 OFFICIAL RECORD COPY