ML20065P779

From kanterella
Revision as of 06:43, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Change to Tech Spec 4.6.1.2d,requiring That Type C Penetration Tests Be Performed at 24-month Interval, Deviating from 10CFR50,App J Requirement to Perform Test During Each Refueling Shutdown
ML20065P779
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/21/1982
From:
DUKE POWER CO.
To:
Shared Package
ML20065P766 List:
References
TAC-48982, NUDOCS 8210260336
Download: ML20065P779 (4)


Text