Application for Amend to License NPF-9,changing Tech Spec Re Containment Penetration Type C Leak Rate Tests.Amend Requires Exemption from 10CFR50,App J
ML20065P763
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/21/1982
From: Thies A
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065P766 List:
References
TAC-48982, NUDOCS 8210260331
Download: ML20065P763 (3)


Text

.

DUKE POWER GOMPANY NUGLEAR PRODUGTION DEPARTWdNT I* O. pox 33180. 422 Mot *TIf CIfUHClf MTHEET CIIAHLOTT7!, N.C. 28242 (704) 370-4011 October 21, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief -

Licensing Branch No. 4 Re: McGuire Nuclear Station Docket No. 50-369 Proposed Amendment to License NPF-9

Dear Mr. Denton:

Attached is a proposed change to the McGuire Nuclear Station Technical Specifica-tions regarding containment penetration type C leak rate tests. The proposed change is to allow a one month extension of the time interval between tests for one penetration in order that it coincide with a scheduled shutdown. This extended shutdown had originally been scheduled for October, 1982 to install a design modi-fication on the Model D Westinghouse steam generators. However, delays in delivery of the special tooling required for this modification have currently pushed the shutdown date to November 12, 1982. The Technical Specification exemption is re-quasted to extend through November 30, 1982 in anticipation of additional potential delays. No further extensions will be sought by Duke Power Company even should delays past November 30th be incurred since several additional penetration's sur-veillance testing intervals will have also expired.

Duke recognizes that in order to approve this Technical Specification change it is also necessary for the staff to grant an exemption to 10 CFR 50 Appendix J pursuant to 10 CFR 50.12a since the specification is based on this regulation. It is requested that this change receive imediate attention in view of the time period involved.

The proposed chauge has been reviewed and it has been determined that there are no adverse safety or environmental impacts associated with the change.

This change is considered to be a Class III license amendment pursuant to 10 CFR 170.22. Therefore, a check in the amount of $4,000 is enclosed.

Very truly yours, A. C. Thies, Executive Vice President Power Operations PBN:j fw Attachment

.- l 8210260331 821021 - I

' PDR ADOCK 05000369 PDR

)$hg P_ M/l

./.

j Mr. Harold R. Denton, Director October 21, 1982 Page 2 4

cc: Mr. P. R. Bemis Senior Resident Inspector McGuire Nuclear Station Mr. James P. O'Reilly, Regional Ada'nistrator U. S. Nuclear Regulatory Commission

,. Region II. -

! 101 Marietta Street, Suite 3100 l Atlanta, Georgia 30303 i

i 3

i l-i

. . ~ . . - . . - - .. ,

Mr. Harold R. Denton, Director October 21, 1982 Page 3 F

A. C. THIES, being duly sworn, states that he is Executive Vice President of Duke Power Company; that he is authorized on the part of said Company to. sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Technical Specifications, Appendix A to License No. NPF-9; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

A. C. Thies, Executive Vice President Subscribed and sworn to before me this 21st day of October,1982. ,

o 0. omnt/)

Notary Public

  • My Connission Expires:

- ,th, 10 .2 P /9 f(f J