ML111540050

From kanterella
Revision as of 23:47, 20 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Exam 2011-301 Draft Sim IN-Plant JPMs
ML111540050
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/18/2011
From:
NRC/RGN-II
To:
Florida Power & Light Co
References
50-335/11-301, 50-389/11-301
Download: ML111540050 (125)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: St. Lucie Date of Examination: Feb. 201 1 Exam Level (circle one): RO, SRO(I), SRO(U) Operating Test No.: HLC-20 NRC Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)

System I JPM Title Type Code* Safety Function S-i Align ECCS for Hot and Cold Leg Injection (2008 NRC exam) D, EN, A, S, 3 L, P S-2 Perform Control Room Actions for Control Room M, L, S, A 8 Inaccessibility Unit 2 (Modified 0821004)

(All)

S-3 Loss of Safety Related AC Bus Train A (2A5 480V Load N, 5 6 center)

(RO only)

S-4 Verify Containment Spray Unit 2 N, 5, A, EN 5 (All)

S-5 Establish Alternate Charging Flowpath to RCS Through A P, D, A, S, L 2 HPSI Header Unit 2.

(All)

S-6 Start 2A1 and 2A2 RCP post LOOP N, 5, A 4p C-I Respond to high CCW surge tank level, Unit I due to D, C 9 radioactive in-leakage. (0821030)

C-2 Respond to failure of Wide Range Nuclear Instrumentation D, C 7 Unit I (0821036)

In-Plant Systems (3 for RO; 3 for SRO-l; 3 or 2 for SRO-U)

P-i Restore Auxiliary Feedwater Flow following Steam Binding N, L, E 4s Unit 1 (All)

P-2 Local Operation of Boron Concentration Control Unit 2 R, D, E 1 (All) (0821212)

P-3 Disconnect I B Instrument Inverter from service for preventive D 6 maintenance Unit 1 (0821067)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2

@ All control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

Type Codes Criteria for RD / SRO-l I SRO-U (A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irectfrombank <9181<4 (E)mergency or abnormal in-plant 1 I 1 I 1 (EN)gineered safety feature I / 1 (control room system)

(L)ow-Power I Shutdown > 1 / 1 I> 1 (N)ew or (M)odified from bank including 1(A) 2I 2I 1 (P)revious 2 exams 3 I 3 I 2 (randomly selected)

(R)CA 1/1/1 (S)imulator JPM

SUMMARY

DESCRIPTION SI- Align ECCS for Hot and Cold Leg Injection The applicant is required to align the B train for Hot and Cold leg injection. V3523 will not open and the A train will be required to be lined up for Hot and Cold Leg injection.

S2- Perform Control Room Actions for Control Room Inaccessibility Unit 2 Perform Operator actions in the Control Room prior to Control Room evacuation due to a fire.

Direction is given there is not enough time to perform SPTAs. JPM is alternate path in that one RCP cannot be stopped from its control switch. Stopping the RCP requires the 6.9KV bus to be de energized.

S3- Loss of Safety Related AC Bus Train A (2A5 480V Load center)

A loss of the 2A5 480V LC occurs. The applicant is directed to perform General Actions for loss of the bus. After the General actions are performed the applicant is to re-energize the bus by closing the applicable breakers. The JPM will be terminated when the bus is re-energized.

S4- Verify Containment Spray Unit 2 Conditions will be given that require verification of Containment Spray. Numerous failures associated with Containment Spray must be identified and corrected.

S5- Establish Alternate Charging Flowpath to RCS Through A HPSI Header Unit 2.

The Unit is in 2-EOP-1 5, Functional Recovery. A pipe break in the Charging header has resulted in the normal Charging flow unavailable. The applicant will use Appendix T from 2-EOP-99, Appendices, Tables and Figures, to establish a Charging flowpath using the A HPSI header. This JPM is faulted in that the 2A Charging pump trips 5 seconds after starting. Applicant should refer back to 5.C and start the 2C Charging pump and continue with the lineup.

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 S6- Start 2A1 and 2A2 RCP post LOOP After a LOOP, when offsite power is regained, direction to start 2A1 and 2A2 RCPs will be given.

When the 2A2 RCP is started it will develop a severe oil leak which will require the pump to be tripped.

Cl- Respond to CCW excessive activity, Unit I A CCW surge tank level high I compartment level low alarm is received. Direction is given to perform actions required by I -AOP-1 4.01, Component Cooling Water Abnormal Operations and I -AOP 14.02,Component Cooling Water Excessive Activity. Procedure will direct the applicant to a leaking Sample Heat Exchanger that will be isolated.

C2- Respond to Linear Range NI channel malfunction, Unit I Numerous annunciators will be given in the initial conditions. The applicant will be required to identify the failure associated with the annunciators and carry out the appropriate actions using 1-AOP-99.01, Loss of Technical Specification Instrumentation.

P1- Restore Auxiliary Feedwater Flow following Steam Binding Unit 1 The 1 B Auxiliary Feedwater Pump had indications of steam binding. Direction is given to restore AFW flow following steam binding.

P2- Local Operation of Boron Concentration Control Unit 2 Due to instrumentation problem in the Control Room blending of the VCT will be required locally. Off normal procedure 2-AOP-02.01 Boron Concentration Control System Abnormal Operations will be implemented to increase VCT level.

P3- Disconnect lB Instrument Inverter from service for preventive maintenance Unit I The I B Instrument Inverter is to be removed from service for maintenance. The Instrument bus will be placed on the Maintenance Bypass Bus lAW 1-NOP-49.05B, 12OVAC Instrument Bus 1MB (Class lE)

Normal Operation.

JOB PERFORMANCE MEASURE FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN THE ECCS FOR SIMULTANEOUS HOT AND COLD LEG INJECTION UNIT 2 -

NRC S-I Developed/Revised by: Larry Rich Date Training Management Approval:

Date JPM NRC S-i Rev 0 Simulator Pagei of 9

JOB PERFORMANCE MEASURE Task: ALIGN THE ECCS FOR SIMULTANEOUS HOT AND COLD LEG INJECTION UNIT 2 -

Alternate Path JPM? Yes Facility JPM #: 0821158 (Modified for NRC exam)

KIA: A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves KIA Rating(s): 4.4 / 4.4 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US is informed that 2B Hot and Cold leg injection is aligned.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 2-EOP-99, Appendix 0, Simultaneous Hot and Cold Leg Injection Validation Time: 15 minutes Time Critical: No Tools/EguipmentlProcedures Needed:
  • None Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-i Rev 0 Simulator Page 2 of 9

JOB PERFORMANCE MEASURE INITIAL CQNDLRQNLAN PEC[E[CDiRECT[QN SPECIFIC DIRECTIONS:

  • The task you are to perform is: Align the 2B HPSI to Provide Hot and Cold Leg Injection Unit 2
  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.

During the performance of the task, I will tell you which steps to simulate or discuss.

  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

a All simulator JPM steps, including communications, shall be performed for this JPM.

  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

A loss of coolant accident has occurred and has been diagnosed in Unit 2. It is four and a half (4.5) hours post-trip, and Shutdown Cooling can NOT be established. 2A and 2B HPSI pumps are running.

INITIATING CUES:

You are the RCO. The US has directed you to complete Section 2, Simultaneous Hot and Cold Leg Injection lAW 2-EOP-99, Appendix 0, for B side.

JPM NRC S-I Rev 0 Simulator Page 3 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:

Section 2: Aligning 2B HPSI for Hot Leg Injection:

STEP 1 (1) OPEN V3551, To Hot Leg 2B Valve. CRITICAL STEP STANDARD: POSITION V3551 control switch to OPEN.

SAT EXAMINERS CUE:

COMMENTS: UNSAT STEP 2 (2) OPEN V3523, To Hot Leg 2B Valve. FAULTED STEP STANDARD: POSITION V3523 control switch to OPEN.

SAT EXAMINERS NOTE: V3523 will not open EXAMINERS CUE: When Candidate recognizes V3523 will not open, inform him as US to align the A side for Hot and Cold Leg Injection UNSAT EXAMINERS NOTE: Although not procedurally driven, Candidate should g back and close V3551, to Hot Leg 2B Valve COMMENTS:

Section 1: Aligning 2A HPSI for Hot Leg Injection STEP 3: (1) OPEN V3550, To Hot Leg 2A Valve. CRITICAL STEP STANDARD: POSITION V3550 control switch to OPEN.

EXAMINERS CUE: SAT COMMENTS:

UNSAT JPM NRcs-1 RevO Simulator Page4of9

JOB PERFORMANCE MEASURE REREQRMANEQI{ECKLIT STEP 4: (2) OPEN V3540, To Hot Leg Valve. CRITICAL STEP STANDARD: POSITION V3540 control switch to OPEN EXAMINERS CUE:

COMMENTS: UNSAT STEP 5: (3) CLOSE V3656, Pump 2A Discharge Valve. CRITICAL STEP STANDARD: POSITION V3656 control switch to CLOSE EXAMINERS CUE:

COMMENTS: UNSAT STEP 6: (4) VERIFY flow to the 2A Hot Leg is greater than or equal to 250 gpm on ANY of the following instruments:

  • FR-3317 HPSI to Hot leg 2A Flow STANDARD: OBSERVE FI-3315 or FR-3317 UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRCS-1 RevO Simulator Page5of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7: (5) HZ ONE HPSI Pump is running, THEN ENSURE flow to the Cold Legs is greater than or equal to 250 gpm by the TOTAL of all FOUR of the following instruments:

  • FI-331 1 HPSI Loop 2A2 Flow
  • FI-3331 HPSI Loop 2B1 Flow
  • Fl-3341 HPSI Loop 2B2 Flow UNSAT STANDARD: DETERMINE that two HPSI Pumps are running and this step is N/A EXAMINERS CUE:

COMMENTS:

STEP 8: (6) HZ TWO HPSI Pump is running, THEN ENSURE flow to the Cold Legs is greater than or equal to 440 gpm by the TOTAL of all FOUR of the following instruments:

SAT

  • Fl-3321 HPSI Loop 2A1 Flow
  • FI-331 1 HPSI Loop 2A2 Flow
  • FI-3331 HPSI Loop 2B1 Flow UNSAT
  • FR-3313 I 3323 HPSI Loop 2A2 & 2A1 Flow
  • FR-3333 I 3343 HPSI Loop 2B2 & 2B1 Flow STANDARD: OBSERVE Flow instruments listed above EXAMINERS CUE:

COMMENTS:

JPM NRCS-1 RevO Simulator Page6of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP Done: Notify the US that the 2A HPSI train is Aligned for simultaneous Hot and Cold Leg injection.

STANDARD: NOTIFY the US that simultaneous Hot and Cold Leg injection is ALIGNEE SAT to the 2A HPSI train.

EXAMINERS CUE: US ACKNOWLEDGES. UNSAT COMMENTS:

END OF TASK STOP TIME:

JPM NRCS-1 RevO Simulator Page7of9

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC #80.
2. UNFREEZE and RUN the simulator for a few minutes.
3. SELECT AND EXECUTE S-i
4. UNFREEZE the Simulator when the student is ready.

JPM NRC S-I RevO Simulator Page8of9

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

A loss of coolant accident has occurred and has been diagnosed in Unit 2. It is four and a half (4.5) hours post-trip, and Shutdown Cooling can jQI be established. 2A and 2B HPSI pumps are running.

INITIATING CUES:

You are the RCO. The US has directed you to complete Section 2 Simultaneous Hot and Cold Leg Injection lAW 2-EOP-99, Appendix 0, for B side ONLY.

Page 9 of 9

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM CONTROL ROOM ACTIONS FOR CONTROL ROOM INACCESSIBILITY Unit 2 -

NRC S-2 Developed/Revised by:

Training Management Approval:

Signature on file Date JPM NRC S-2 Rev. 0 Simulator Page 1 of 12

JOB PERFORMANCE MEASURE Task: RESPOND TO CONTROL ROOM INACCESSIBILITY CONDITION Faulted JPM? Yes Facility JPM #: Modified 0821004 K/A: AK3.1 2 Required sequence of actions for emergency evacuation of control room KIA Rating(s): 4.1 / 4.5 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when all required operator actions prior to Control Room evacuation have been performed, lAW 2-ONP-1 00.02.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 2-ONP-1 00.02, Control Room Inaccessibility Validation Time: 6 minutes Time Critical: No Tools/Equipment/Procedures Needed:
  • 2-ONP-1 00.02, Control Room Inaccessibility Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-2 Rev. 0 SmuIator Page2ofl2

JOB PERFORMANCE MEASURE ALTD1RECTiN SPECIFIC DIRECTIONS:

  • The task you are to perform is:

Perform the Operator Actions Prior to Control Room Evacuation Unit 2

  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

All simulator JPM steps, including communications, shall be performed for this JPM.

  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 was operating at 100% power, steady state conditions when a fire broke out in RTGB 203.

The US has implemented 2-ONP-1 00.02, Control Room Inaccessibility INITIATING CUES:

You are the Board RCO. The US has directed you to perform the operator actions prior to Control Room evacuation lAW 2-ONP-1 00.02. There is NOT enough time to perform Standard Post-Trip Actions.

JPM NRC S-2 Rev. 0 Simulator Page 3 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:

2-ONP-1 00.02, Control Room Inaccessibility STEP 1 (6.1.1): Trip the reactor CRITICAL STEP STANDARD: DEPRESS manual Reactor Trip pushbuttons at RTGB 204 or RTGB 201.

EXAMINERS CUE:

COMMENTS: UNSAT STEP 2 (6.1 .2.A): OBTAIN the following items: CRITICAL STEP A. Security Grand Master keys (4) (Break glass in Control Room).

SAT STANDARD: OBTAIN four Security Grand Master keys from glass box in Control Room.

EXAMINERS CUE: UNSAT EVALUATORS NOTE: These keys are not in the Simulator. In the Control Room they are located in a red box next to the entrance door. (Ask the applicant where in the Control Room are these keys located).

COMMENTS:

STEP 3 (6.1 .2.B): OBTAIN the following items: CRITICAL STEP B. Hot Shutdown Control Panel Room (Key #1 in key locker).

STANDARD: OBTAIN Key #1 from Control Room key box.

EXAMINERS CUE: UNSAT EVALUATORS NOTE: If in the Simulator, have the student hand the key to the evaluator after retrieving it from the key locker (to prevent it from inadvertently being removed from the Simulator).

COMMENTS:

JPM NRC S-2 Rev. 0 Simulator Page 4of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (6.1 .2.C): OBTAIN the following items: CRITICAL STEP C. Hot Shutdown Control Panel Room key box (Key #2 in key locker).

SAT STANDARD: OBTAIN Key #2 from Control Room key box.

EXAMINERS CUE: UNSAT EVALUATORS NOTE: If in the Simulator, have the student hand the key to the evaluator after retrieving it from the key locker (to prevent it from inadvertently being removed from the Simulator).

COMMENTS:

STEP 5 (6.1.3): NOTIFY the SM to report to Unit 1 Control Room AND perform the following:

IMPLEMENT the Emergency Plan lAW EPIP-Ol, Classification of SAT Emergencies.

CONTACT Security to have officer meet SNPO at U12 EDGs with keys to UNSAT access rooms.

STANDARD: NOTIFIES SM to perform the above.

EXAMINERS CUE: SM Acknowledges.

COMMENTS:

STEP 6 (6.1.4): ((time permits, Then PERFORM the following:

SAT

. TRIP the turbine.

STANDARD: DEPRESS the manual Turbine Trip pushbutton. UNSAT EXAMINERS CUE:

EXAMINERS NOTE: Turbine is already tripped COMMENTS:

JPM NRC S-2 Rev. 0 Simulator Page 5 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (6.1.4): [1 time permits, Then PERFORM the following: CRITICAL STEP

  • 2B Main Feedwater Pump STANDARD: POSITION MEW Pump 2A & 2B control switches to STOP. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 8 (6.1.4): time permits, Then PERFORM the following: CRITICAL STEP

  • HCV-09-1 B
  • HCV-09-2A
  • HCV-09-2B UNSAT STANDARD: POSITION HCV-09-1A, HCV-09-1B, HCV-09-2A, and HCV-09-2B to CLOSE.

EXAMINERS CUE:

COMMENTS:

STEP 9 (6.1.4): 11 time permits, Then PERFORM the following: FAULTED STEP

  • TRIPtheRCPs.

SAT STANDARD: POSITION RCP control switches to STOP.

EXAMINERS CUE: UNSAT EVALUATORS NOTE: Candidate may choose to start oil lift pumps prior to tripping their respective RCPs.

2B1 RCP does not trip from the Control Room.

COMMENTS:

JPM NRC S-2 Rev. 0 Simulator Page 6 of 12

JOB PERFORMANCE MEASURE PERFORMANCECHECKUST_

STEP 10 RECOGNIZES 2B1 RCP did not trip from the control room CRITICAL STEP STANDARD: OPENS 2B1 6.9KV Feeder Breaker 2-30202 to de-energize the 2B1 6.9K\

bus. SAT EXAMINERS CUE:

UNSAT EVALUATORS NOTE: If RD calls RCO B to trip the 2B1 RCP breaker locally, wait one minute and report back I took the trip handle to trip and the breaker did no open.

COMMENTS:

STEP 11(6.1.4): time permits, ]Th PERFORM the following: CRITICAL STEP

  • CLOSE PORV Block Valves:
  • V1477 STANDARD: POSITION the control switches for Vi 476 and Vi 477 to CLOSE. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 12 (6.1.4): ii time permits, Then PERFORM the following: CRITICAL STEP

  • CLOSE letdown isolation valves:
  • V2516
  • V2522 UNSAT STANDARD: POSITION V25i5, V25i6, and V2522 to CLOSE.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-2 Rev. 0 Simulator Page7of 12

JOB PERFORMANCE MEASURE PERFORMANEiLECKLIST -

STEP 13 (6.1.4): H time permits, fl PERFORM the following: CRITICAL STEP STOP ALL charging pumps and PLACE control switches in STOP STANDARD: POSITION all Charging Pump control switches to STOP.

EXAMINERS CUE: UNSAT COMMENTS:

STEP 14(6.1.4): If time permits, Then PERFORM thefollowing: CRITICAL STEP

  • HCV-08-1 B STANDARD: POSITION control switches for HCV-08-1A and HCV-08-1 B to CLOSE. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 15 (6.1.4): K time permits, Then PERFORM the following: CRITICAL STEP

  • CLOSE SIG Blowdown isolation valves:
  • FCV-23-4
  • FCV-23-5
  • FCV23-6 UNSAT STANDARD: POSITION control switches for FCV-23-3, 4, 5, 6 to CLOSE.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-2 Rev. 0 Simulator Page 8 of 12

JOB PERFORMANCE MEASURE PERFORMANcE CHECKLIST STEP 16 (6.1.4):lf time permits, Then PERFORM the following: CRITICAL STEP CLOSE CCW to/from RCPs

  • HCV-14-2
  • HCV-14-6
  • HCV-14-7 UNSAT STANDARD: POSITION control switches for HCV-14-1, 2, 6, 7 to CLOSE.

EXAMINERS CUE:

COMMENTS:

STEP 17(6.1.4):If time permits, Then PERFORM the following:

  • PERFORM 2-EOP-1, Standard Post Trip Actions.

SAT STANDARD: REMIND US of intention to NOT perform Standard Post Trip Actions.

EXAMINERS CUE: US Concurs. UNSAT COMMENTS:

STEP 18 (6.1.5): ANNOUNCE the evacuation of the Control Room over the Gaitronics System.

STANDARD: ANNOUNCE the evacuation of the Unit 2 Control Room. SAT EXAMINERS CUE:

UNSAT COMMENTS:

JPM NRC S-2 Rev. 0 Simulator Page 9 of 12

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST -

STEP 19 (6.1.6): OBTAIN portable radios for the following personnel:

  • RCOA
  • Us STANDARD: OBTAIN three radios. UNSAT EXAMINERS CUE:

EXAMINERS NOTE: There are no radios in the Simulator. Ask the applican where the radios are located in the plant. (Located under the RCO desk in Unit 2)

COMMENTS:

STEP 20 (6.1.7 done): EVACUATE ALL personnel from the Control Room.

STANDARD: ENSURE all personnel are EVACUATED from the control room.

SAT EXAMINERS CUE: Inform the applicant the task is complete.

COMMENTS: UNSAT END OF TASK STOP TIME:

JPM NRC S-2 Rev. 0 Simulator Page 10 of 12

JOB PERFORMANCE MEASURE

- SIMULATOR JPM SETUP

1. RESTORE IC-I.
2. UNFREEZE and RUN the simulator for a few minutes.
3. SELECT AND EXECUTE S-2
4. FREEZE simulator until student is ready.

JPM NRC S-2 Rev. 0 Simulator Page 11 of 12

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 was operating at 100% power, steady state conditions when a fire broke out in RTGB 203.

The US has implemented 2-ONP-1 00.02, Control Room Inaccessibility.

INITIATING CUES:

You are the Board RCO. The US has directed you to perform the operator actions prior to Control Room evacuation lAW 2-ONP-1 00.02. There is NOT enough time to perform Standard Post-Trip Actions.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM CONTROL ROOM ACTIONS FOR LOSS OF SAFETY RELATED AC BUS Unit 2 -

NRC S-3 (RO ONLY)

Developed/Revised by: L. Rich Training Management Approval:

Signature on file Date JPM NRC S-3 Rev. 0 Simulator Page 1 of 14

JOB PERFORMANCE MEASURE Task: RESPOND TO LOSS OF SAFETY RELATED AC BUS Faulted JPM? No Facility JPM #: N/A KIA: A4.O1 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)

KIA Rating(s): 3.3 / 3.1 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the 2A5 480V LC has been re-energized.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 2-AOP-47.O1 A, Loss of A Safety Related AC Bus Train A Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
  • 2-AOP-47.O1A, Loss of A Safety Related AC Bus Train A Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-3 Rev. 0 Simulator Page 2 of 14

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is:

PERFORM CONTROL ROOM ACTIONS FOR LOSS OF SAFETY RELATED AC BUS

  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power, steady state conditions when a loss of the 2A5 480V LC occurred.

INITIATING CUES:

You are the Desk RCO. The US has directed you to perform the Actions of 2-AOP-47.OIA, Loss of A Safety Related AC Bus Train A.

JPM NRC S-3 Rev. 0 Simulator Page 3 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:

2-AOP-47.OIA, Loss of A Safety Related AC Bus Train A.

General Actions CAUTION SAT Various instruments and equipment normally used for assessment of critical safet functions may NOT be OPERABLE. All available indications should be used.

UNSAT STEP 1 (4.2.1.1): IF letdown was in service prior to the loss of power event, THEN VERIFY letdown flow.

STANDARD: DETERMINES Letdown flow has been lost.

EXAMINERS CUE:

EXAMINERS NOTE: Letdown valve V2515 closed on loss of Bus COMMENTS:

STEP 2 (4.2.1 .1.1): SECURE charging CRITICAL STEP STANDARD: STOPS 2A charging pump SAT EXAMINERS CUE:

UNSAT COMMENTS:

STEP 3 (4.2.1 .1.2): ENSURE Train A charging pump control switches are in STOP. CRITICAL STEP STANDARD: PLACES 2A AND 2C charging pump control switches to in STOP.

SAT EXAMINERS CUE:

UNSAT COMMENTS:

JPM NRC S-3 Rev. 0 Simulator Page4of 14

JOB PERFORMANCE MEASURE

- PERFORMANOCMEKLISI -

CRITICAL STEP 4 (4.2.1.1.3): ENSURE the following valves are CLOSED: STEP

  • V2515, STOP VALVE-IC SAT
  • V2516, CONTAINMENT ISOL VALVE - IC
  • V2522, CONTAINMENT ISOL VALVE-CC UNSAT STANDARD: PLACES V2515, V2516 and V2522 to the CLOSED position.

EXAMINERS CUE:

COMMENTS:

STEP 5 (4.2.1 .2): IF aN of the following conditions exist:

SAT

  • Unit 2 is in MODE 3 through 6
  • SIAS blocked UNSAT THEN VERIFY at 15 minute intervals that SFSC criteria are met per Low Mode ADP for current plant conditions.

STANDARD: DETERMINES step is N/A EXAMINERS CUE:

COMMENTS:

JPM NRC S-3 Rev. 0 Simulator Page 5 of 14

JOB PERFORMANCE MEASURE PEREORANCECKCKL[ST STEP 6 (4.2.1 .3): VERIFY Pressurizer level and pressure being maintained.

SAT STANDARD: DETERMINES Pressurizer pressure is slowly rising.

UNSAT EXAMINERS CUE:

EXAMINERS NOTE: Due to Pzr. Pressure transmitter failure additional heaters wil energize causing pressure to rise. Applicant will need to turn off some heaters to maintain 2250 psia.

COMMENTS:

STEP 7 (4.2.1.4): VERIFY Tavg signal on DCS (SBCS Input Screen) is good.

SAT STANDARD: MONITORS DCS to determine IF HOLDING LAST GOOD VALUE RESET REQUIRED. Determines reset required. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 8(4.2.1.4.1): IF HOLDING LAST GOOD VALUE RESET REQUIRED is displayed on CRITICAL screen above Tavg signal THEN ENSURE the following: STEP A. REACTOR REG SYSTEMS control switch on RTGB-204 is positioned to SAT CONT UNIT 2.

UNSAT B. Tave signal on DCS (SBCS) is RESET.

STANDARD: SWAPS to RRS #2 and resets Tave signal on DCS panel.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-3 Rev. 0 Simuator Page 6 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (4.2.1.5): VERIFY at least one of the following CEDM Cooling Fans SAT operating:

UNSAT

  • HVE-21A
  • HVE-21B STANDARD: DETERMINES HVE-21B is running.

EXAMINERS CUE:

COMMENTS:

STEP 9 (4.2.1.6): VERIFY at least one of the following Reactor Cavity Cooling Fans operating: SAT

  • HVS-2A
  • HVS-2B UNSAT STANDARD: DETERMINES NO Reactor Cavity Cooling fans are running.

EXAMINERS CUE:

COMMENTS:

STEP 10(4.2.1.6.1): IMPLEMENT applicable sections(s) of 2-AOP-25.01, Loss of RCB Cooling Fans. SAT STANDARD: IMPLEMENTS 2-AOP-25.01, Loss of RCB Cooling Fans, section 4.2.3 UNSAT Loss of Reactor Cavity Cooling Fan.

EXAMINERS CUE:

COMMENTS:

JPM NRC S3 Rev. 0 Simulator Page 7 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST -. -

I 2-AOP-25.O1, Loss of RCB Cooling Fans.

CRITICAL STEP 11(4.2.3.1): START HVS-2B STEP STANDARD: STARTS HVS-2B EXAMINERS CUE: UNSAT COMMENTS:

I 2-AOP-47.OIA, Loss of A Safety Related AC Bus Train A.

STEP 12 (4.2.1.7): VERIFY at least one of the following Reactor Support Cooling Fans SAT operating:

UNSAT

  • HVE-3A
  • HVE-3B STANDARD: DETERMINES no Reactor Support Cooling Fans running EXAMINERS CUE:

COMMENTS:

2-AOP-25.O1, Loss of RCB Cooling Fans.

CRITICAL STEP 13(4.2.4.1): START standby Reactor Support Cooling Fan STEP

  • HVE-3B SAT STANDARD: STARTS HVE-3B UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-3 Rev. 0 Simulator Page 8 of 14

JOB PERFORMANCE MEASURE

- PERFORMANCE CHECKLIST I 2-AOP-47.OIA, Loss of A Safety Related AC Bus Train A. I SAT STEP 14 (4.2.1.8): VERIFY at least three of the following containment fan coolers are in fas speed operation UNSAT

  • HVS-1A
  • HVS-IB
  • HVS-1C
  • HVS-1D STANDARD: DETERMINES HVS-1A and HVC-IC are running. HVS-IB has no power.

HVS-1 D not running but available to start.

EXAMINERS CUE:

COMMENTS:

I 2-AOP-25.O1, Loss of RCB Cooling Fans. I CRITICAL STEP STEP 14(4.2.5.1): START standby Containment Fan Cooler SAT HVS-1D UNSAT STANDARD: STARTS HVS-1 D in FAST speed.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-3 Rev. 0 Simulator Page 9 of 14

JOB PERFORMANCE MEASURE

- PERFORMANCE CHECKLLST I 2-AOP-47.OIA, Loss of A Safety Related AC Bus Train A. I STEP 15 (4.2.1.9): WHEN plant conditions have stabilized, THEN REVIEW Tech Specs for any required actions:

UNSAT STANDARD: DETERMINES Tech Spec 3.8.3.1 Action a: re-energize within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> EXAMINERS CUE:

EXAMINERS NOTE: At Examiners discretion, Tech Spec may be reviewed at end of JPM. Until 2A5 480V LC is energized the following Tech Spec is applicable: Tech Spec 3.8.3.1 Action a: re-energize within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> COMMENTS:

STEP 16(4.2.1.10): GO TO the applicable Section as listed below for the highest level electrical bus lost: SAT STANDARD: DETERMINES Section 4.2.4 480V LC 2A5 UNSAT EXAMINERS CUE:

COMMENTS:

STEP 17 (4.2.4.1): INVESTIGATE cause of the bus deenergization.

SAT STANDARD: CALLS SNPO to investigate the cause of deenergization.

EXAMINERS CUE: Respond as SNPO a worker accidently tripped the UNSAT feeder breaker. As Unit Supervisor, attempt to close the tripped breaker.

COMMENTS:

JPM NRC S-3 Rev. 0 Simulator Page 10 of 14

JOB PERFORMANCE MEASURE STEP 18 (4.2.4.2.A): VERIFY the following feeder breakers are CLOSED:

STATION SERVICE 2A5 XFMR (2-20210)

SAT STANDARD: DETERMINES STATION SERVICE 2A5 XFMR (2-20210) is OPEN UNSAT EXAMINERS CUE:

COMMENTS:

STEP 19 (4.2.4.2.A.1): CLOSE STATION SERVICE 2A5 XFMR (2-20210), one attempt only CRITICAL STEP STANDARD: CLOSES STATION SERVICE 2A5 XFMR (2-20210).

EXAMINERS CUE:

SAT COMMENTS:

UNSAT STEP 20 (4.2.4.2.B): VERIFY the following feeder breakers are CLOSED:

480V BUS 2A5 FEEDER (2-40361)

STANDARD: DETERMINES 480V BUS 2A5 FEEDER (2-40361) is OPEN UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-3 Rev. 0 Simulator Page 11 of 14

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 21 (4.2.4.2.B.1): CLOSE 480V BUS 2A5 FEEDER (2-40361), one attempt only. CRITICAL STEP STANDARD: CLOSES 480V BUS 2A5 FEEDER 2-40361 EXAMINERS CUE: End of Task UNSAT COMMENTS:

END OF TASK STOP TIME:

JPM NRC S-3 Rev. 0 Simuator Page 12 of 14

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-i.
2. ENSURE Pressurizer pressure and level channels selected to Y
3. UNFREEZE and RUN the simulator for a few minutes.
4. SELECT and EXECUTE S-3
5. ENSURE the following RCB fans running:

HVE-21 A HVS-2A HVE-3A HVS-IA, IB, IC

6. FREEZE simulator until student is ready.

JPM NRC S-3 Rev. 0 Simulator Page 13 of 14

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is operating at 100% power, steady state conditions when a loss of the 2A5 480V LC occurred.

INITIATING CUES:

You are the Desk RCO. The US has directed you to perform the Actions of 2-AOP-47.O1A, Loss of A Safety Related AC Bus Train A.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE VERIFY CONTAINMENT SPRAY ACTUATION Unit2 NRC S-4 Developed/Revised by: L. Rich Training Management Approval:

Signature on file Date JPM NRC S-4 Rev. 0 Simulator Page 1 of 9

JOB PERFORMANCE MEASURE Task: VERIFY CONTAINMENT SPRAY ACTUATION Faulted JPM? Yes Facility JPM #: N/A KIA: Ability to monitor automatic operation of the CSS, including:

A3.O1 Pump starts and correct MOV positioning KIA Rating(s): 4.3 / 4.5 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when Containment Spray verification is complete Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 2-EOP-99, Appendices / Figures I Tables / Data Sheets Validation Time: 7 minutes Time Critical: No Tools!EguipmentlProcedures Needed:
  • 2-EOP-99, Appendices / Figures / Tables / Data Sheets Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-4 Rev. 0 Simulator Page2of9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS.

SPECIFIC DIRECTIONS:

The task you are to perform is:

VERIFY CONTAINMENT SPRAY ACTUATION

  • The performance level to be used for this JPM is Perform
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 has entered 2-EOP-03, LOCA INITIATING CUES:

You are the Desk RCO. The US has directed you to verify Containment Spray actuation in accordance with Table 3 of 2-EOP-99.

JPM NRC S-4 Rev. 0 Simulator Page 3 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST _________________

START TIME:

2-EOP-99,_Appendices_I_Figures_I_Tables_I_Data_Sheets STEP 1: ENSURE Containment Spray Pumps Running FAULTED STEP

  • C.S. Pump 2B STANDARD: RECOGNIZE C.S. Pump 2B is NOT running UNSAT EXAMINERS CUE:

EXAMINERS NOTE: The 2B Hydrazine pump is interlocked to start on Containmen Spray pump start, thus the 2B Hydrazine pump will not be running until the 2B C.S. has been started.

COMMENTS:

CRITICAL STEP 2: PLACES control switch for the 2B CS Pump to START STEP SAT STANDARD: PLACES control switch for the 2B CS Pump to START and verifies AMPS increase and then lower to normal values.

UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-4 Rev. 0 Simulator Page4of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: ENSURE Containment Spray Header A/B Valves OPEN FAULTED STEP

  • FCV-07-1B UNSAT STANDARD: RECOGNIZE FCV-07-1A is mid position and FCV-07-1 B indicates full open.

EXAMINERS CUE:

COMMENTS:

STEP 3: POSITIONS FCV-07-1A to OPEN. CRITICAL STEP STANDARD: POSITIONS FCV-07-IA to OPEN and verifies FCV-07-IA full OPEN SAT EXAMINERS CUE:

EXAMINERS NOTE: FCV-07-1A will fully open when the control switch is taken to UNSAT the open position.

COMMENTS:

JPM NRC S-4 Rev. 0 Simulator Page5ofg

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: VERIFY EACH operating Containment Spray Header is delivering greater than o equal to 2700 gpm. SAT STANDARD: MONITORS FI-07-1A and Fl-07-1 B to determine flow UNSAT EXAMINERS CUE:

EXAMINERS NOTE: If applicant did not notice FCV-07-IA was not full open they should recognize less than 2700 gpm flow on the A header and take appropriate action to verify valve lineup.

COMMENTS:

STEP 4 : VERIFY Hydrazine Pumps RUNNING:

SAT

  • Hyd. Pump 2A UNSAT
  • Hyd. Pump 2B STANDARD: DETERMINES 2A and 2B Hydrazine Pumps are operating EXAMINERS CUE:

COMMENTS:

JPM NRC S-4 Rev. 0 Simulator Page6ofg

JOB PERFORMANCE MEASURE

- PERFORMANCECHECKUST STEP 5 : VERIFY Hydrazine Pump Discharge Valves OPEN:

  • 1 -SE-07-3A SAT
  • 1-SE-07-3B UNSAT STANDARD: DETERMINES 1-SE-07-3A and 1-SE-07-38 are OPEN EXAMINERS CUE:

COMMENTS:

STEP 6: VERIFY Hydrazine flow on ANY of the following:

SAT FR-07-2-1 (Hydrazine Spray Flow)

FR-07-2-2 (Hydrazine Spray Flow) UNSAT STANDARD: VERIFIES adequate Hydrazine flow on Fl-07-3A and FI-07-3B.

EXAMINERS CUE:

COMMENTS:

END OF TASK STOP TIME:

JPM NRC S-4 Rev. 0 Simuator Page 7 of 9

JOB PERFORMANCE MEASURE

- SIMULATORMSETUR

1. RESTORE IC-81
2. UNFREEZE and RUN the simulator for a few minutes.
3. SELECT and EXECUTE lesson S-4
4. FREEZE simulator until student is ready.

JPM NRC S-4 Rev. 0 Simulator Page8of9

JOB PERFORMANCE MEASURE

- CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 has entered 2-EOP-03, LOCA INITIATING CUES:

You are the Desk RCO. The US has directed you to verify Containment Spray actuation in accordance with Table 3 of 2-EOP-99.

FPL St. Lucie Nuclear Plant JOB PERFORMANCE MEASURE ESTABLISH ALTERNATE CHARGING FLOWPATH TO RCS THROUGH A HPSI HEADER UNIT 2 -

NRC S5 Simulator This JPM is NOT TIME CRITICAL This is a FAULTED JPM NRC HLC-20 S5 Simulator Page 1 of 10

JOB PERFORMANCE MEASURE Task: Align Charging flow through A HPSI header.

Faulted JPM? Yes Facility JPM #: Modified from 0821115 Ii A4.01 3.5 /3.2 Ability to manually operate and/or monitor in the control room charging pump and flow controls.

Task Standard:

This JPM is complete when the US is notified that Charging flow has been established through the A HPSI header using the 2C Charging pump lAW 2-EOP-99 Appendix T.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

2-EOP-99, Appendix T, Alternate Charging Flow Path to RCS Through A HPSI Header Validation Time: 10 minutes Time Critical: No Tools/EquipmentlProcedures Needed:

2-EOP-99, Appendix T, Alternate Charging Flow Path to RCS Through A HPSI Header Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

None Radiological Protection and RWP Requirements:

None Candidate:

Name Start Time: Finish Time:

Performance Rating: Sat Unsat Examiner: Signature:

Comments NRC HLC-20 S5 Simulator Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is:

Establish Alternate Charging Flow Path through A HPSI Header Unit 2

  • The performance level to be used for this JPM is Perform,
  • This is not a time critical JPM.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 was tripped from 100% power due to a problem with the Feedwater Regulating System.

The Crew has implemented 2-EOP-15, Functional Recovery, due to a dual event. The SNPO reported a pipe break in the charging header between V2429 and V2523. The 2B Charging pump is out of service.

INITIATING CUES:

You are the RCO. The US has directed you to line up Charging flow through the A HPSI header per 2-EOP-99, Appendix T, Alternate Charging Flow Path to RCS Through A HPSI Header NRC 20 S-5 Simurator Page 3 of 10

JOB PERFORMANCE MEASURE

- ----. ______PERFORMANCECHECKLIST_..

START TIME:

2-EOP-99, Appendix T, Alternate Charging Flow Path to RCS Through A HPSI Header.

STEP 1 (1) ENSURE letdown is ISOLATED.

SAT STANDARD: VERIFY all letdown Isolation Valves CLOSED.

  • ExAMINERs CUE: All letdown isolation valves closed, Green light ON, UNSAT Red light OFF.

COMMENTS:

STEP 2 (2) PLACE ALL Charging Pump in STOP.

SAT STANDARD: VERIFY ALL Charging Pump control switches to STOP.

  • ExAMINERs CUE: ALL charging Pumps are in STOP, Green light ON, Red UNSAT light OFF.

COMMENTS:

STEP 3:(3) PLACE 2A HPSI Pump in STOP.

STANDARD: POSITION 2A HPSI Pump switch in STOP.

  • ExAMINERs CUE: 2A HPSI pump switch in STOP, Green light ON, Red UNSAT light OFF. Annunciator R-40 alarms.

EXAMINERS NOTE: Becomes Critical Step if SIAS occurs.

COMMENTS:

STEP 4: (4) CLOSE V3656, HPSI Pump 2A Discharge Valve. CRITICAL STEP STANDARD: OBTAIN key #67, POSITION V3656 to CLOSED.

  • ExAMINERS CUE: V3656 indicates Green light ON, Red light OFF Annunciator Q-33 Alarms.

UNSAT COMMENTS:

NRC 20 S-5 Simulator Page 4 of 10

JOB PERFORMANCE MEASURE

- _PERFORMANCECHECKLIST -

STEP 5: (5.A) Locally OPEN V2340, Charging Pump Discharge to A HPSI Header Isolation. (located in 2C Charging Pump Room). CRITICAL STEP STANDARD: DIRECT SNPO to OPEN V2340.

SAT

  • ExAMINERS CUE: The SNPO Reports V2340 is OPEN.

UNSAT COMMENTS:

  • ExAMINERS CUE: Provide this CUE as US: Use the 2A Charging Pump.

STEP 6:(5.B) if desired to use ANY combination of Charging Pump, Then locally LOCK CRITICAL CLOSED V2429, Charging Pump Discharge Isolation. STEP STANDARD: DIRECT THE SNPO to locally LOCK CLOSED V2429. SAT

  • EXAMINERS CUE: The SNPO REPORTS that V2429 is LOCK CLOSED.

UNSAT EXAMINERS NOTE: Break is downstream of V2429 per the cue therefore V2429 is to be closed. Located in pipe penetration room at Penetration Number 27.

COMMENTS:

STEP 7(5.D) Locally OPEN V3519, Charging Pump to A HPSI Hdr Isol (Located in A CRITICAL HPSI pump room). STEP STANDARD: DIRECT THE SNPO to locally OPEN V351 9. SAT

  • EXAMINERS CUE: The SNPO REPORTS that V3519 is OPEN.

UNSAT COMMENTS:

NRC 20 S-5 Simulator Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8: (6) ENSURE Charging Pump(s) have a suction flowpath from ONE of the following sources: SAT Boric Acid Makeup Tank Refueling Water Tank UNSAT Volume Control Tank STANDARD: Verify Charging Pump Suction Flowpath.

  • ExAMlNERs CUE: Charging Pump Suction is from the Boric Acid Makeup Tank.

COMMENTS:

STEP 9 (7) ENSURE Charging Pump(s) have a discharge flowpath by OPENING at CRITICAL least ONE A HPSI Header Loop Isolation Valve: STEP HCV-361 7 2A2 Cold Leg SAT HCV-3627 2A1 Cold Leg HCV-3637 2B1 Cold Leg HCV-3647 2B2 Cold Leg UNSAT STANDARD: POSITION Any ONE of the four valves to OPEN.

  • ExAMINERs CUE: As any one of the four Valves is OPENED, indicate the Green light is OFF, Red light is ON.

COMMENTS:

STEP 10 (8) START Charging Pump(s) AS NECESSARY. FAULTED STEP STANDARD: POSITION the 2A Charging Pump to START.

  • ExAMlNERS CUE: 2A Charging Pump indicates Green light OFF and Red light ON. Recirc Valve Indicates BOTH lights ON. 2A Charging pump red and green lights off. UNSAT EXAMINERS NOTE: 2A Charging pump trips 5 seconds after start signal.

Applicant should refer back to step 5.C for use of the 2C Charging pump.

COMMENTS:

NRC 20 S-5 Simulator Page 6 of 10

JOB PERFORMANCE MEASURE

_PFQRMANCECKEGKUST STEP 11 :(5.C) If desired to use ONLY the 2C Charging pump Then locally LOCK CLOSED V2338 2C Charging Pump Disc. To Common Disc. Header Isolation. SAT STANDARD: DIRECT THE SNPO to locally LOCK CLOSED V2338. UNSAT

  • ExAMINERs CUE: SNPO reports V2338 is LOCKED CLOSED.

EXAMINERS NOTE: Closing V2338 is NOT critical due to all Charging Pumps have discharge check valves. V2429 (step 6) should remain closed due to the location of the break.

If V2429 is re-opened the 2C Charging pump will pump out the break, not into the RCS.

COMMENTS:

STEP 12:(8) START the 2C Charging pump AS NECESSARY CRITICAL STEP STANDARD: POSITION the 2C Charging Pump to START SAT

  • ExAMlNERS CUE: 2C Charging pump indicates red light ON green light OFF. Recirc, Valve indicates Green light ON red Light OFF. UNSAT
  • ExAMlNERS CUE: As the Recirc valve closes, depending on which SI header Valve is opened, R-46,47, 56 or 57 Alarms and Loop Pressure PIA-3329,3319,3339 or 3349 indicates 1980 psig.

COMMENTS:

STEP 13 (9) VERIFY flow to the RCS by ANY of the following:

Pressurizer level rising SAT Indicated flow on applicable HPSI Loop Flow Indicator STANDARD: OBSERVE Pressurizer Level and HPSI flow for PROPER indication. UNSAT

  • ExAMlNERs CUE: Pressurizer Level is slowly RISING and applicable HPSI Loop Flow (Fl-3311, 3321, 3331 or 3341) indicates 44 gpm.

COMMENTS:

NRC 20 S-5 Simulator Page 7 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that charging flow has been established through the A High Pressure Safety Injection Header using the 2C Charging Pump.

STANDARD: NOTIFY the US that charging flow has been ESTABLISHED through the A High Pressure Safety Injection Header using the 2C Charging Pump.

EXAMINERS CUE: US ACKNOWLEDGES COMMENTS:

END OF TASK STOP TIME:

NRC 20 S-5 Simulator Page 8 of 10

JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP

1. RESTORE IC-88. UNFREEZE the Simulator.
2. SELECT the Lesson File Folder for JPM.
3. OPEN the Lesson File for 0821115 and EXECUTE the Lesson.
4. TRIGGER Step 1.
5. After Letdown isolates on high temperature, CLOSE all three Letdown valves and PLACE all Charging pumps in STOP.
6. Line up Emergency Boration by performing the following steps:

> START 2A or 28 BA Pump.

> CLOSE V2650, Tank 2A Recirc. Valve.

> CLOSE V2651, Tank 2B Recirc Valve.

> OPEN V2514, Emergency Borate.

7. The Simulator will automatically FREEZE after 2A Charging Pump recirc valve strokes full open. All SPTAs are performed by the scenario.
8. Ensure 28 Charging pump is in STOP and breaker is racked out.
9. STORE a temporary IC set if more than one student is to take the JPM. Note: The lesson will have to be stopped and then re-executed each time the temporary IC set is restored.
10. UNFREEZE the simulator when the student is ready.
11. TRIGGER STEP Open V2340 when directed to do so by the student.
12. TRIGGER STEP Close V2429 when directed to do so by the student.
13. TRIGGER STEP Close V2338 when directed to do so by the student.
14. TRIGGER STEP Open V351 9 when directed to do so by the student.

NRC HLC-20 S-5 Simulator or U2 Control Room Page 9of 10

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 was tripped from 100% power due to a problem with the Feedwater Regulating System.

The Crew has implemented 2-EOP-1 5, Functional Recovery, due to a dual event. The SNPO reported a pipe break in the charging header between V2429 and V2523. The 2B Charging pump is out of service INITIATING CUES:

You are the RCO. The US has directed you to line up Charging flow through the A HPSI header per 2-EOP-99, Appendix T, Alternate Charging Flow Path to RCS Through A HPSI Header.

L St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTART RCPs DURING EOP IMPLEMENTATION Unit2 NRC S-6 Developed/Revised by: Larry Rich Training Management Approval:

Signature on file Date JPM NRC S-6 Rev. 0 Simulator Page 1 of 9

JOB PERFORMANCE MEASURE Task: RESTART RCPS DURING EOP IMPLEMENTATION Faulted JPM? Yes Facility JPM #: N/A KIA: A2.02 Conditions which exist for an abnormal shutdown of an RCP in comparison to a normal shutdown of an RCP KIA Rating(s): 3.7/ 3.9 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when 2A1 RCPs has been stopped.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

2-NOP-Ol .02, Reactor Coolant Pump Operation 2-EOP-99, Appendices / Figures I Tables I Data Sheets, Table 13, RCP Operating Limits.

2-0120034, Reactor Coolant Pump Validation Time: 15 minutes Time Critical: No ToolslEquipmentlProced ures Needed:

2-NOP-01 .02, Reactor Coolant Pump Operation 2-EOP-99, Appendices I Figures / Tables I Data Sheets, Table 13, RCP Operating Limits.

Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.

  • None Radiological Protection and RWP Requirements:
  • None JPM NRC S-6 Rev. 0 Simulator Page2of9

JOB PERFORMANCE MEASURE iNITIAL CONDITIONS AND SPECIFIC DIRECTIONS.

SPECIFIC DIRECTIONS:

The task you are to perform is:

Restart RCPs during EOP implementation Unit 2 The performance level to be used for this JPM is Perform

  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 is in 2-EOP-09, Loss of Offsite Power/Loss of Forced Circulation. Step 19 for RCP Restart has been met.

INITIATING CUES:

You are the Board RCO. CCW has been restored to the Reactor Coolant Pumps. The US has directed you to start the 2A1 and 2B2 Reactor Coolant Pumps in accordance with 2-NOP-Ol .02, Reactor Coolant Pump Operation section 5.1 RCP Restart During EOP Implementation, starting with step 5.1.5.

JPM NRC S-6 Rev. 0 Simulator Page3of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST_

START TIME:

2-NOP-Ol .02,_Reactor_Coolant_Pump_Operation STEP 1(5.1.5): VERIFY RCS pressure and temperature are above the normal sea requirements for RCP operation. IF RCS pressure and temperature are SAT below this limit, THEN initiate a Data Sheet 30, Unscheduled Surveillance Tracking, to track RCP operating time below normal seal requirement, REFER TO Attachment 1, Minimum RCS Pressure for RCP operation, UNSAT Figure 6A or Figure 6B.

STANDARD: DETERMINES RCS pressure and temperature are within limits.

EXAMINERS CUE:

COMMENTS:

STEP 2 (5.1 .6): VERIFY CBO flow is within acceptable range for RCPs to be started.

REFER TO Attachment 2, RCP Seal Leak-Off Flow Rate vs. RCS SAT Pressure.

STANDARD: DETERMINES CBO flow is within acceptable range. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 3 (5.1.7): VERIFY proper RCP seal pressure breakdown for RCPs to be started. IF proper seal pressure has NOT occurred, THEN REFER TO ONP 2. SAT 0120034, Reactor Coolant Pump.

  • RCP2A1 UNSAT
  • RCP2B2 STANDARD: DETERMINES seal pressure breakdown is acceptable.

EXAMINERS CUE:

COMMENTS:

JPM NRC S-6 Rev. 0 Simulator Page4of9

JOB PERFORMANCE MEASURE STEP 4 (5.1.8): PLACE the control switches for the oil lift pumps for RCPs to started in CRITICAL RUN position. STEP STANDARD: PLACES RCP 2A1 and 2B2 RCP oil lift pump to RUN. SAT EXAMINERS CUE:

UNSAT COMMENTS:

STEP 5 (5.1.9): IF the amber permissive light does NOT illuminate in 30 seconds THEN STOP oil lift pumps and investigate. SAT STANDARD: MONITORS amber permissive light and determines light is illuminated. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 6(5.1.10): PERFORM both of the following: CRITICAL STEP A. START one of the selected RCPs AND SAT B. WHEN starting amps return to normal, THEN START the other selected RCP.

UNSAT STANDARD: STARTS 2A1 (2B2), when amps return to normal, STARTS 2A1 (2B2)

RCP.

EXAMINERS CUE:

EXAMINERS NOTE: Starting order does not matter COMMENTS:

JPM NRC S- Rev. 0 Simulator Page5of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (5.1.11 .): WHEN RCP motor amps return to normal, THEN PERFORM all of the CRITICAL following: STEP A. PLACE oil lift control switches to OFF SAT STANDARD: PLACES oil lift control switches for the 2A1 and 2B2 RCPs to OFF.

UNSAT EXAMINERS CUE:

COMMENTS:

STEP 8 (5.1 .11.): WHEN RCP motor amps return to normal, THEN PERFORM all of the following:

B. VERIFY oil lift pumps stop SAT STANDARD: VERIFIES oil lift pump STOPS. UNSAT EXAMINERS CUE:

COMMENTS:

STEP 9 (5.1 .11): WHEN RCP motor amps return to normal, THEN PERFORM all of the CRITICAL following: STEP C. PLACE oil lift pump control switches to AUTO SAT STANDARD: PLACES oil lift control switches for the 2A1 and 2B2 RCPs to AUTO.

UNSAT EXAMINERS CUE:

COMMENTS:

JPM NRC S-6 Rev. 0 Simulator Page6of9

JOB PERFORMANCE MEASURE

- - PRFORMANCELECKLISI..

STEP 10 (5.1.12): VERIFY RCP operating limits are satisfied. REFER TO 2-EOP-99, Appendices! Figures I Tables! Data Sheets, Table 13, RCP Operating SAT Lim its.

UNSAT STANDARD: REFERS to Table 13, RCP Operating Limits.

EXAMINERS CUE:

COMMENTS:

2-EOP-99, Appendices / Figures! Tables I Data Sheets, Table 13, RCP Operatin Limits.

STEP 11: DETERMINES RCP range of operation for various parameters on running FAULTED RCPs STEP SAT STANDARD: MONITORS RCP operating limits lAW Table 13. Identifies lower oil reservoir rapidly lowering.

UNSAT EXAMINERS CUE:

EXAMINERS NOTE: RCP 2A1 lower oil reservoir level will begin to rapidly lower.

Annunciator J-17, RCP Oil Trouble may alarm prior to applicant noticing lowering oil level. Bearing temperatures will slowly rise.

Applicant may enter 2-0120034, Reactor Coolant Pump or may elect to trip RCP (STEP 9 of this JPM)

COMMENTS:

2-01 20034, Reactor Coolant Pump STEP 12 (6.4.5): [1 oil level decreases rapidly, Then STOP the affected RCP CRITICAL STEP STANDARD: TRIP 2A1 RCP. SAT EXAMINERS CUE:

EVALUATORS NOTE: Applicant may elect to start oil lift pumps prior to tripping UNSAT pump. Starting of oil lift pumps is NOT critical for this step.

COMMENTS:

END OF TASK STOP TIME:

JPM NRC S-6 Rev. 0 Simulator Page7of9

JOB PERFORMANCE MEASURE

..$MULATQRJPMSETUP

1. RESTORE IC-82
2. UNFREEZE and RUN the simulator for a few minutes.
3. SELECT AND EXECUTE S-6
4. FREEZE simulator until student is ready.

JPM NRC S-6 Rev. 0 Simulator Page 8of9

JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 is in 2-EOP-09, Loss of Offsite Power/Loss of Forced Circulation. Step 19 for RCP Restart has been met.

INITIATING CUES:

You are the Board RCO. CCW has been restored to the Reactor Coolant Pumps. The US has directed you to start the 2A1 and 2B2 Reactor Coolant Pumps in accordance with 2-NOP-Ol .02, Reactor Coolant Pump Operation section 5.1, RCP Restart During EOP Implementation, starting with step 5.1 .5.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH CCW SURGE TANK LEVEL DUE TO RADIOACTIVE IN-LEAKAGE UNIT I -

Unit I Control Room NRC C-I Developed/Revised by: Larry Rich Date Line Management Approval:

Date Training Management Approval:

Signature on File Date JPM NRC C-I IRev 0 Unit 1 Control Room Page 1 of 10

JOB PERFORMANCE MEASURE Task: 07014070 Respond to CCW Excessive Activity Unit I Faulted JPM? No Facility JPM #: 0821030 K1A: A2.02 High/low surge tank level KIA Rating(s): 3.2 I 3.5 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the US has been informed that the Pressurizer Steam Space Sample Heat Exchanger has been isolated.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 1 AOP-1 4.01, Component Cooling Water Abnormal Operations
  • 1-AOP-1 4.02, Component Cooling Water Excessive Activity.

1-APP-01-S-6, Annunciator Response Procedure Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:

  • 1-AOP-1 4.01, Component Cooling Water Abnormal Operations
  • 1-AOP1 4.02, Component Cooling Water Excessive Activity.
  • 1 -APP-01 -S-6, Annunciator Response Procedure Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC C-i /Rev 0 Unit i Control Room Page 2 of 10

JOB PERFORMANCE MEASURE

[N SPECIFIC DIRECTIONS:

  • The task you are to perform is: Respond to high CCW Surge Tank Level Unit 1
  • The performance level to be used for this JPM is Simulate This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.

Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 is operating at 100% power, steady state conditions, MOL. Chemistry is performing RCS samples.

Annunciator S-6 (CCW SURGE TANK LEVEL HIGH/COMPARTMENT A LEVEL LOW) has illuminated.

All operator actions of I -ARP-01 -S6 have been carried out. A SNPO was dispatched to locally investigate the CCW Surge Tank. He reports the sight glass is full and LCV-1 4-1, Demin Water to Surge Tank, is closed with no make-up flow indicated. The SNPO has also verified the sight glass isolation valves are open.

INITIATING CUES:

The US has directed you to perform the actions required by 1-AOP-1 4.01, Component Cooling Water Abnormal Operations, to determine the cause for the high Surge Tank level.

JPM NRC C-i /Rev 0 Unit 1 Control Room Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST_

START TIME:

1-AOP-14.O1, Component Cooling Water Abnormal Operations STEP 1 (4.2.11): Abnormal CCW Surge Tank Level

1. VERIFY the following valves are open
  • V14480
  • V14481
  • V14482
  • Vi 4483 SAT STANDARD: DETERMINES from the cue the surge tank isolation valves have alread been checked open.

UNSAT EXAMINERS CUE: None COMMENTS:

STEP 2 (4.2.11): Abnormal CCW Surge Tank Level

2. MONITOR CCW Surge Tank.

STANDARD: DETERMINES from cue CCW surge tank sight glass indicates full.

EXAMINERS CUE: None SAT COMMENTS:

UNSAT

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i IRev 0 Unit I Control Room Page 4 of 18

JOB PERFORMANCE MEASURE

_fEREORMANCE CHECKLIST___

1-AOP-14.O1, Component Cooling Water Abnormal Operations STEP 3 (4.2.11: Abnormal CCW Surge Tank Level

3. VERIFY abnormal rising level in CCW Surge Tank UNSAT STANDARD: DETERMINES from cue CCW surge tank sight glass indicates full.

EXAMINERS CUE: None COMMENTS:

STEP 4(4.2.11): Abnormal CCW Surge Tank Level

4. REQUEST Chemistry sample CCW system to assist in determining source of in-leakage. SAT STANDARD: CONTACTS Chemistry to ensure samples are being taken UNSAT EXAMINERS CUE: Chemistry notified COMMENTS:

STEP 5 (4.2.11): Abnormal CCW Surge Tank Level 5 REQUEST System Engineering support to determine cause of CCW Surge Tank high level. SAT STANDARD: CONTACTS System Engineering for support UNSAT EXAMINERS CUE: System Engineering notified.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i /Rev 0 Unit i Control Room Page 5 of 18

JOB PERFORMANCE MEASURE PERFORMANCECHEKJL 1-AOP-1 4.01, Component Cooling Water Abnormal Operations STEP 6 (4.2.11): Abnormal CCW Surge Tank Level

6. VERIFY CCW Radiation Monitors indicate NO rise in activity:

SAT

  • RR-26-56157, CCW Radiation Recorder
  • CCW A Channel No. 56
  • CCW B Channel No, 57 UNSAT STANDARD: OBSERVES RR-26-56157 for rise in activity EXAMINERS CUE: Both 56 and 57 are not in alarm but are trending up.

COMMENTS:

STEP 7 (4.2.11): Abnormal CCW Surge Tank Level 6.1 IF high activity indicated, THEN IMPLEMENT 1-AOP-1 4.02, Component Cooling Water Excessive Activity. SAT STANDARD: REFERS to 1-AOP-14.02, Component Cooling Water Excessive Activity. UNSAT EXAMINERS CUE: None COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i fRey 0 Unit 1 Control Room Page 6 of 18

JOB PERFORMANCE MEASURE PERFORMANCE CHECKUST 1-AOP-14.02, Component Cooling Water Excessive Activity.

STEP 8 (4.2.1): General Actions

1. If of the following conditions exist: SAT
  • Unit I is in Mode3thru6 UNSAT
  • SIAS blocked THEN VERIFY at 15 minute intervals that SFSC criteria are met per Low Mode ONP for current plant conditions.

STANDARD: DETERMINES step is N/A.

EXAMINERS CUE: None COMMENTS:

STEP 9(4.2.1): General Actions

2. Notify Radiation Protection and Chemistry Department of CCW in-leakage and excessive activity. SAT STANDARD: CONTACT the Chemistry and RP Technicians and INFORM them that there is excessive activity in the CCW system. UNSAT EXAMINERS CUE: CHEMISTRY and RP TECHNICIANS NOTIFIED COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i IRev 0 Unit 1 Control Room Page 7 of 18

JOB PERFORMANCE MEASURE STEP 10 (4.2.1): General Actions

3. Determine the RCS leak rate per 1-OSP-01.03, Reactor Coolant System Inventory Balance. SAT STANDARD: N/A.

UNSAT EXAMINERS CUE: The extra RCO has performed 1-OSP-01.03, Reactor Coolant System Inventory Balance, and Ieakrate is 0.5 GPM.

COMMENTS:

STEP 11(4.2.1): General Actions

4. PERFORM applicable section(S) per Table 1 SAT Abnormal Condition Section UNSAT In-Leakage from RCP Seal Coolers Section 4.2.2 In-Leakage from Letdown Heat Exchanger Section 4.2.3 In-Leakage from Shutdown Cooling Heat Exchanger Section 4.2.4 In-Leakage from Sample Heat Exchangers Section 4.2.5 In-Leakage from HPSI pump seal cooler Attachment 4 In-Leakage from LPSI pump seal cooler Attachment 5 In-Leakage from CS pump seal cooler Attachment 6 STANDARD: PERFORMS Section 4.2.2 EXAMINERS CUE: None COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i IRev 0 Unit I control Room Page 8 of 18

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12 (4.2.2): In-leakage from RCP Seal Coolers

1. VERIFY RCS in-leakage from RCP seal cooler by jjy of the following: SAT
  • y RCP Lower Seal Cavity Temperature raised: UNSAT
  • T1151_A(1A1 RCP)
  • T1161_A(IA2RCP)
  • T1171A(1B1 RCP)
  • T1181_A(1B2 RCP)
  • An RCP Seal Cooler HX Isolation Valve CLOSED:
  • HCV-14-IIAI
  • HCV-14-11A2
  • HCV-14-11B1
  • HCV-14-11B2 STANDARD: MONITORS RCP Lower Seal Cavity temperatures on the DCS. Determines no in-leakage and goes to step 4.2.1 step 4 EXAMINERS CUE: Lower Seal Cavity temperatures are IAI RCP INSERT TEMPERATURES HERE 1A2 RCP IBI RCP 1B2 RCP DETERMINES RCP Seal Coolers HX Isolation Valves are OPEN EXAMINERS CUE: HCV-14-IIAI indicates red light on green light off HCV-14-11A2 indicates red light on green light off HCV-14-IIBI indicates red light on green light off HCV-14-11B2 indicates red light on green light off DETERMINES NO in-leakage from RCP seals and GOES TO Section 4.2.1 Step 4 EXAMINERS CUE: None COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i /Rev 0 Unit I Control Room Page 9of 18

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13(4.2.1): General Actions

4. PERFORM applicable section(S) per Table 1 SAT Abnormal Condition Section UNSAT In-Leakage from RCP Seal Coolers Section 4.2.2 In-Leakage from Letdown Heat Exchanger Section 4.2.3 In-Leakage from Shutdown Cooling Heat Section 4.2.4 Exchanger In-Leakage from Sample Heat Exchangers Section 4.2.5 In-Leakage from HPSI pump seal cooler Attachment 4 In-Leakage from LPSI pump seal cooler Attachment 5 In-Leakage from CS pump seal cooler Attachment 6 STANDARD: PERFORMS Section 4.2.3 EXAMINERS CUE: None COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i /Rev 0 Unit 1 Control Room Page 10 of 18

JOB PERFORMANCE MEASURE

_PERFORMANCE CHECKUST STEP 14 (4.2.3): In-Leakage from Letdown Heat Exchanger

1. VERIFY RCS in-leakage from Letdown HX indicated by y of the following: SAT
  • FIA-2202, LTDN FLOW, lowered considering number of charging pumps UNSAT operating.
  • PIC-2201, LTDN PRESSURE, lowered compared to PIC-2201 setpoint.
  • TR-09-5A, Point 3, TE-14-1 2 (CCW temperature from Letdown HX) raised STANDARD: DETERMINE FIA-2202 letdown flow is normal for one charging pump DETERMINE Letdown pressure matches PIC-220 1 setpoint DETERMINE CCW temperature from Letdown HX is normal DETERMINE NO in-leakage from Letdown Heat Exchanger and goes to 4.2.1 step 4 EXAMINERS CUE: One Charging Pump running with FIA-2202 indicating 40 gpm EXAMINERS CUE: PIC-2201 LTDN PRESSURE indicates 460 psia, PlC 2201 setpoint indicates 460 psia EXAMINERS CUE: TR-09-5A, Point 3, TE-14-12 indicates 120°F COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i IRev 0 Unit i control Room Page ii of 18

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15(4.2.1): General Actions

4. PERFORM applicable section(S) per Table I SAT Abnormal Condition Section In-Leakage from RCP Seal Coolers Section 4.2.2 UNSAT In-Leakage from Letdown Heat Exchanger Section 4.2.3 In-Leakage from Shutdown Cooling Heat Section 4.2.4 Exchanger In-Leakage from Sample Heat Exchangers Section 4.2.5 In-Leakage from HPSI pump seal cooler Attachment 4 In-Leakage from LPSI pump seal cooler Attachment 5 In-Leakage from CS pump seal cooler Attachment 6 STANDARD: DETERMINES Section 4.2.4 In-Leakage from Shutdown Cooling Hea Exchanger is N/A due to Mode 1 plant conditions.

EXAMINERS CUE: None COMMENTS:

STEP 16(4.2.1): General Actions

4. PERFORM applicable section(S) per Table I SAT Abnormal Condition Section In-Leakage from RCP Seal Coolers Section 4.2.2 UNSAT In-Leakage from Letdown Heat Exchanger Section 4.2.3 In-Leakage from Shutdown Cooling Heat Section 4.2.4 Exchanger In-Leakage from Sample Heat Exchangers Section 4.2.5 In-Leakage from HPSI pump seal cooler Attachment 4 In-Leakage from LPSI pump seal cooler Attachment 5 In-Leakage from CS pump seal cooler Attachment 6 STANDARD: PERFORMS Section 4.2.5 In-Leakage from Sample Heat Exchangers EXAMINERS CUE: None COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i fRey 0 Unit I Control Room Page 12 of 18

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17 (4.2.5) In-Leakage from Sample heat Exchangers

1. VERIFY y sample heat exchanger aligned for service:

UNSAT

  • IA Sample Heat Exchanger (Hot Leg Loop 1A)
  • 1 B Sample Heat Exchanger (Pressurizer surge line)
  • 1C Sample Heat Exchanger (Pressurizer steam space)

STANDARD: DETERMINES from below valve positions I B Sample Heat Exchanger and IC Sample Heat Exchangers are in service.

EXAMINERS CUE: V5200 indicates green light on, red light off V5203 indicates green light on, red light off V5201 indicates green light off, red light on V5204 indicates green light off, red light on V5202 indicates green light off, red light on V5205 indicates green light off, red light on COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-I IRev 0 Unit 1 Control Room Page 13 of 18

JOB PERFORMANCE MEASURE PERFORMANCCJiKLLST STEP 18: (4.2.5) In-Leakage from Sample heat Exchangers

2. VERIFY jy in-service sample heat exchanger outlet temperature raised as indicated by the following (RABI24IN-RA3I\N-RAH):
  • TI-5510, 1A SAMPLE HX OUTLET TEMP (Hot Leg Loop 1A)
  • Tl-5520, 1 B SAMPLE HX OUTLET TEMP (Pressurizer surge line)
  • Tl-5530, IC SAMPLE HX OUTLET TEMP (Pressurizer steam space)

STANDARD: DETERMINES Tl-5520, 1 B SAMPLE HX OUTLET TEMP (Pressurizer Surge Line) and Tl-5530, 1 C SAMPLE HX OUTLET TEMP (Pressurizer steam space) by calling SNPO to obtain local reading.

EXAMINERS CUE: SNPO reports TI-5520, lB SAMPLE HX OUTLET TEMP is 95°F and TI-5530 IC SAMPLE HX OUTLET TEMP is 130°F.

DETERMINES IC SAMPLE HC has a tube leak and goes to Attachment 3, isolation of Sample Heat Exchangers.

COMMENTS:

STEP 19 (4.2.5): In-Leakage from Sample Heat Exchangers (continued)

SAT 3 GO TO Attachment 3, Isolation of Sample Heat Exchangers, STANDARD: REFERS to Attachment 3 to isolate the 1C Sample heat Exchanger UNSAT EXAMINERS CUE: None COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i /Rev 0 Unit i Control Room Page 14 of 18

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ATTACHMENT3 Isolation of Sample Heat Exchangers STEP 20: 3. If the IC Sample Heat Exchanger (Pressurizer steam space) is suspected of leaking into CCW, flj PERFORM the following: SAT A. NOTIFY Chemistry 1C Sample HX is being isolated.

UNSAT STANDARD: NOTIFIES Chemistry the 1 C Sample HX is to be isolated.

EXAMINERS CUE: Chemistry acknowledges COMMENTS:

STEP 21: 3. If the 1 C Sample Heat Exchanger (Pressurizer steam space) is CRITICAL suspected of leaking into CCW, Then PERFORM the following: STEP B. CLOSE V5202, PRZR STEAM SPACE SAMPLE. (RTGB 106). SAT STANDARD: POSITION V5202 handswitch to CLOSE UNSAT EXAMINERS CUE: Green light is ON, Red light is OFF COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i fRey 0 Unit I Control Room Page 15 of 18

JOB PERFORMANCE MEASURE STEP 22: 3. lithe 1 C Sample Heat Exchanger (Pressurizer steam space) is CRITICAL suspected of leaking into CCW, Then PERFORM the following: STEP C. CLOSE V5205, PRZR STEAM SPACE SAMPLE. (RTGB 106). SAT STANDARD: POSITION V5205 handswitch to CLOSE UNSAT EXAMINERS CUE: Green light is ON, Red light is OFF COMMENTS:

STEP 23: 3. If the 1 C Sample Heat Exchanger (Pressurizer steam space) is CRITICAL suspected of leaking into CCW, Then PERFORM the following: STEP D. CLOSE V05007, IC SAMPLE HX OUTLET ISOL. (RABII9IS-RA-IIE- SAT RAH)

STANDARD: CONTACT the SNPO to CLOSE V05007 UNSAT EXAMINERS CUE: SNPO reports V05007 CLOSED.

COMMENTS:

STEP 24: 3. If the 1C Sample Heat Exchanger (Pressurizer steam space) is CRITICAL suspected of leaking into CCW, Then PERFORM the following: STEP E. CLOSE Vi 4506, 1C SAMPLE HX INLET ISOL. (RAB!2515-RA1IE-RAH) SAT STANDARD: CONTACT the SNPO to CLOSE Vi 4506 UNSAT EXAMINERS CUE: SNPO reports V14506 CLOSED COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i /Rev 0 Unit I Control Room Page 16 of 18

JOB PERFORMANCE MEASURE

- PERFORMANCE CHECKLIST STEP 25: 3. H the IC Sample Heat Exchanger (Pressurizer steam space) is CRITICAL suspected of leaking into CCW, Then PERFORM the following: STEP SAT F. CLOSE VI 4502, IC SAMPLE HX OUTLET ISOL. (RABI25IS-RA1IE.-

RAH)

UNSAT STANDARD: CONTACT the SNPO to CLOSE VI 4502 EXAMINERS CUE: SNPO reports V14502 CLOSED COMMENTS:

STEP 26: If the IC Sample Heat Exchanger is suspected of causing the increase in CCW activity, Then isolate the heat exchanger by the following:

SAT G. MONITOR CCW to verify leak isolated.

UNSAT STANDARD: Monitor CCW radiation (Channels 56 & 57) to VERIFY leak has been ISOLATED EXAMINERS CUE: CCW Radiation Monitor (Channels 56 & 57) trends are slowly lowering.

COMMENTS:

STEP (done): Notify the US that the IC Sample Heat Exchanger has been isolated.

STANDARD: NOTIFY the US that the 1 C Sample Heat Exchanger has been ISOLATED SAT EXAMINERS CUE: US AKNOWLEDGES COMMENTS: UNSAT END OF TASK STOP TIME:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-i /Rev 0 Unit 1 Control Room Page l7of 18

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit I is operating at 100% power, steady state conditions, MOL. Chemistry is performing RCS samples.

Annunciator S-6 (CCW SURGE TANK LEVEL HIGH/COMPARTMENT A LEVEL LOW) has illuminated.

All operator actions of I -ARP-01 -S6 have been carried out. A SNPO was dispatched to locally investigate the CCW Surge Tank. He reports the sight glass is full and LCV-14-1, Demin Water to Surge Tank, is closed with no make-up flow indicated. The SNPO has also verified the sight glass isolation valves are open.

INITIATING CUES:

The US has directed you to perform the actions required by 1-AOP-1 4.01, Component Cooling Water Abnormal Operations, to determine the cause for the high Surge Tank level.

Page 18 of 18

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO FAILURE OF WIDE RANGE NUCLEAR INSTRUMENT, UNIT I UNIT I CONTROL ROOM NRC C-2 Developed/Revised by: Larry Rich Date Line Management Approval:

Date Training Management Approval:

Date JPM NRC C-2 IRev 0 UNIT I CONTROL ROOM Page 1 of 10

JOB PERFORMANCE MEASURE Task: 07064255 Respond to wide range NI Channel Malfunction Unit I Faulted JPM? No Facility JPM #: 0821036 KIA: Ability to monitor automatic operation of the NIS, including:

A3.03 Verification of proper functioning/operability KIA Rating(s): 3.9 / 3.9 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when it is verified that the Technical Specification action items are met.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 1-ARP-01-L30 NI Channel Inoperative
  • I -AOP-99.01, Loss of Tech Spec Instrumentation
  • T.S. 3.3.1.1 and 3.9.2 Validation Time: 10 minutes Time Critical: No Tools/EguipmentlProcedures Needed:
  • 1-ARP-01-L30 NI Channel Inoperative
  • 1-AOP-99.01, Loss of Tech Spec Instrumentation Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • None Radiological Protection and RWP Requirements:
  • None JPM NRC C-2 /Rev 0 UNIT I CONTROL ROOM Page 2 of 10

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

a The task you are to perform is: Respond to failure of Wide Range NI Channel Malfunction Unit 1

  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.

a Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 reactor startup is in progress at approximately I O% power. After recording critical data and commencing CEA withdrawal toward the point of adding heat, Annunciator L-30 (NI CHANNEL INOPERATIVE) alarmed. The Board RCO reports that the wide range NI recorder indication has gone off scale low and that he has stopped CEA withdrawal and stabilized reactor power level below the point of adding heat.

INITIATING CUES:

You are the Desk RCO. The US has directed you to assist the Board RCO in responding to the alarm, diagnosing the problem, and taking appropriate action.

JPM NRC C-2 IRev 0 UNIT I CONTROL ROOM Page 3 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:

1-ARP-O1-L30: NI CHANNEL INOPERATIVE STEP 1: Reference alarm response procedure for Annunciator L-30.

STANDARD: IMPLEMENT alarm response procedure 1-ARP-O1-L30 SAT EXAMINERS CUE: IF ASKED, WIDE RANGE NI RECORDER IS SELECTED TOCHANNELD UNSAT COMMENTS:

STEP 2: 1. VERIFY all Wide Range Nuclear Instruments show NO disagreement with the other channels.

SAT STANDARD: COMPARE RPS and/or RTGB-104 wide range nuclear instrument channel indications and DETERMINE that wide range NI Channel D has failed low UNSAT EXAMINERS CUE: WIDE RANGE NI CHANNELS ON RPS (AND RTGB INDICATE AS FOLLOWS:

A a1O% POWER B 1 O% POWER C 1O% POWER D 1Oh1% POWER COMMENTS:

STEP 3: 2. If there is a significant disagreement between the Wide Range Instruments, Then implement 1-AOP-99.O1, Loss of Tech Spec Instrumentation. SAT STANDARD: ENTER 1-AOP-99.O1 UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE:

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-2 /Rev. 0 UNIT I CONTROL ROOM Page 4 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIL 1-AOP-99.O1, Section 4.2.2 4.2.1 General Actions Using Attachment 5, Channel Failure Impact Table, PERFORM the following:

Locate table row for affected instrument or channel Wide Range NI MD STEP 4 (4.1): Immediate Operator Actions

1. CONFIRM failed channel by gyof the following methods: SAT
  • Channel check comparison with redundant channels
  • Bistable or status lights UNSAT
  • Any instrument related testing or surveillance procedure in progress STANDARD: Determines channel D caused Annunciator L-30 EXAMINERS CUE:
  • Channel check comparison with redundant channels A 1O% POWER B 1O% POWER C 1O% POWER D 1O.h1% POWER
  • Anunciators L-30 NI Channel Inoperative
  • Bistable or status lights None
  • Any instrument related testing or surveillance procedure in progress None EVALUATORS NOTE: May refer to step 2 and determine channel D is defective.

COMMENTS:

STEP 5 (4.2.1): General Actions

1. IF entering this procedure to restore an affected channel, THEN GO TO SAT Section 4.2.1 Step 5 STANDARD: Determines step is N/A (not restoring an affected channel) UNSAT EXAMINERS CUE: None COMMENTS:
  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-2 /Rev. 0 UNIT 1 CONTROL ROOM Page 5 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4.2.1): General Actions

2. Using Attachment 5, Channel Failure Impact Table, PERFORM the SAT following
  • LOCATE table row for affected instrument or channel
  • REFER TO applicable Tech Specs UNSAT
  • PERFORM applicable procedure section for affected instrument STANDARD: Refers to Attachment 5 EXAMINERS CUE: None COMMENTS:

Attachment 5 STEP 7 LOCATE table row for affected instrument or channel SAT STANDARD: Locates CHANNEL INDICATOR Wide Range NI Channel D UNSAT EXAMINERS CUE: None COMMENTS:

STEP 8: REFER to applicable Tech Specs SAT STANDARD: Refers to Tech Specs 3.3.1.1 (bypass or trip within one hour) and 3.9.2 (N/A not in Mode 6) UNSAT EXAMINERS CUE: None COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC c-2 /Rev. 0 UNIT I CONTROL ROOM Page 6of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 PERFORM applicable procedure section for affected instrument STANDARD: Performs Section 4.2.2 UNSAT EXAMINERS CUE: None COMMENTS:

STEP 10 (4.2.2): 1. CIRCLE affected Channel:

MDMB MC MD UNSAT STANDARD: Circles Channel D EXAMINERS CUE: None COMMENTS:

STEP 11(4.2.2): 2. PERFORM of the following for the affected BTU listed: CRITICAL STEP HIRATE(Key82)

SAT A. BYPASS affected BTU using keyswitch.

OR UNSAT B. TRIP affected BTU per Attachment 3, Tripping and Restoring Protection Bistables.

STANDARD: OBTAIN key and ROTATE Channel D high rate trip unit bistable keyswitch clockwise to 3 oclock position EXAMINERS CUE: THE US DIRECTS BYPASSING THE CHANNEL.

KEY ROTATED TO 3 OCLOCK POSITION AND YELLOW LIGHT LIT COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-2 /Rev. 0 UNIT I CONTROL ROOM Page7oflo

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12 (4.2.2): 3. VERIFY CPSI% POWER WIDE RANGE LOG recorder is selected to an CRITICAL operable channel. STEP STANDARD: PRESS WIDE RANGE pushbutton to select an operable channel. (any channel other than D UNSAT EXAMINERS CUE: INPUTS SELECTED PER STUDENT CHOICES; WIDE RANGE RECORDER SHOWS 1O% POWER AFTER SELECTION OF A DIFFERENT CHANNEL.

COMMENTS:

STEP 13 (4.2.2): 4. SELECT Audio Count Rate to an operable channel. CRITICAL STEP STANDARD: SELECT audio count rate channel input to ANY CHANNEL OTHER THAN CHANNELD SAT EXAMINERS CUE: INPUTS SELECTED PER STUDENT CHOICES; AUDIO COUNT RATE CAN BE HEARD. UNSAT COMMENTS:

STEP 14(4.2.1): 3. INITIATE work request for affected instrument or channel and NOTIFY l&C or EM as applicable.

SAT STANDARD: NOTIFY I&C Department that wide range nuclear instrument Channel D has failed. UNSAT EXAMINERS CUE: I&C. ACKNOWLEDGES.

COMMENTS:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-2 fRey. 0 UNIT 1 CONTROL ROOM Page 8 of 10

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15 (4.2.1): 4. DOCUMENT problem as required:

  • Condition report
  • Ops narrative log UNSAT STANDARD: Perform or notify appropriate personnel to perform the documentation.

EXAMINERS CUE: US IS HAVING A SPARE RO DOCUMENT THE PROBLEM.

COMMENTS:

STEP (done): Notify US that task is complete.

STANDARD: NOTIFY US that high rate trip unit bistable on Channel D has been SAT bypassed lAW SECTION 4.2.2 EXAMINERS CUE: US ACKNOWLEDGES UNSAT COMMENTS:

END OF TASK STOP TIME:

  • Cues are to be used only if JPM performance is being simulated in the plant.

JPM NRC C-2 /Rev. 0 UNIT 1 CONTROL ROOM Page gof 10

JOB PERFORMANCE MEASURE

.CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Q3%

Unit I reactor startup is in progress at approximately I power. After recording critical data and commencing CEA withdrawal toward the point of adding heat, Annunciator L-30 (NI CHANNEL INOPERATIVE) alarmed. The Board ROD reports that the wide range NI recorder indication has gone off scale low and that he has stopped CEA withdrawal and stabilized reactor power level below the point of adding heat.

INITIATING CUES:

You are the Desk ROD. The US has directed you to assist the Board RCO in responding to the alarm, diagnosing the problem, and taking appropriate action.

Page lOof8

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AUXILIARY FEEDWATER FLOW FOLLOWING STEAM BINDING UNIT I-IA AFW PUMP ROOM I STEAM TRESTLE NRC P-I Developed/Revised by: Larry Rich Date Training Management Approval:

Date JPM NRC P-i Rev 0 1A AFWP Room / Steam Trestle Page 1 of 13

JOB PERFORMANCE MEASURE Task: RESTORE AUXILIARY FEEDWATER FLOW FOLLOWING STEAM BINDING - UNIT 1 Faulted JPM? No Facility JPM #: N/A KIA: Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

A206 Back leakage of MFW KIA Rating(s): 2.7 / 3.0 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the IA AFW pump has been restored to operable condition following steam binding.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss X X

References:

  • 1-AOP-09.02, Auxiliary Feedwater Validation Time: 20 minutes Time Critical: No ToolslEquipmentlProcedures Needed:
  • I -AOP-09.02, Auxiliary Feedwater Attachment 2 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • Standard in plant PPE plus PPE for venting hot water and steam.

Radiological Protection and RWP Requirements:

  • None JPM NRC P-i Rev 0 1A AFWP Room / Steam Trestle Page 2 of 13

EASURE JOB PERFORMANCE MIC DIRECTIONS DSPECIF

- -INmAL. CONDITIONS AN SPECIFIC DIRECTIONS r Flow Following Steam Bin ding for m is: Restore Auxiliary Feedwate The task you are to perfor 1A AFW ulate be used for this JPM is Sim The performance level to JPM.

This is not a time critical simulate or discuss.

for ma nce of the tas k, I will tell you which steps to

  • During the per ulated or discussed.

e you wit h the app rop ria te cues for steps that are sim

  • I will provid ion of this task, ref ere nce ma ter ials nor mally available in the execut ed
  • You may use any approv includ ing log s.

ndidate Cue Sheet that I hav e fin ish ed the ass ign ed task by returning the Ca

  • Indicate to me that you provided to you.

INITIAL CONDITIONS:

pump due to erratic discharge foll owi ng a Uni t trip . Th e RCO stopped the 1A AFW Unit 1 is in Mode 3 pressure and amps.

INITIATING CUES:

, Auxiliary Feedwater has dir ect ed you to per for m actions or 1 -AOP-09.02 You are the NPO. The US wing Steam Binding ach me nt 2, Re sto re Aux iliary Feedwater Flow Follo Att JPM NRC P-i Rev 0 stle IA AFWP Room I Steam Tre Page 3 of 13

JOB PERFORMANCE MEASURE PERFORMANCE_CHECKLIST START TIME:

1-AOP-09.02, Auxiliary Feedwater Attachment 2, Restore Auxiliary Feedwater Flow Following Steam Binding NOTE CRITICAL STEP

  • CST static head pressure is the driving force for initial venting the pumps. Vent time will be dependent upon CST level. SAT
  • A pipe wrench of sufficient size will be needed to remove 1 pipe caps during this evolution.

UNSAT WARNING The following instructions involve the venting of hot water and steam. Appropriate PPE should be donned.

STEP 1: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN PERFORM the following:

A. CLOSE V09120, 1A AFW PUMP TO 1A SIG FW ISOL.

(TRSLI43IS-T1 lW-TA)

STANDARD: CLOSES V091 20 by rotating the handwheel clockwise until stopped.

EXAMINERS CUE: V09120 has been rotated fully clockwise.

EXAMINERS NOTE: Valve is located on Steam Trestle. Remainder of steps arc.

performed in the lB AFW pump area.

COMMENTS:

JPM NRC P-i Rev 0 1A AFWP Room / Steam Trestle Page4of 13

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 2: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN PERFORM the following: SAT B. ENSURE the following valves are LOCKED OPEN:

UNSAT (1) VI 2498, IAAFW PUMP SUCT ISOL. (TRSLI22IN-T5IW-TA)

(2) V09100, 1AAFW PUMP RECIRC ISOL. (TRSL/22/N-T5IW-TA)

STANDARD: VERIFIES V12498 is fully counter clockwise and a locking device ir attached.

VERIFIES V09100 is fully counter clockwise and a locking device ir attached.

EXAMINERS CUE: V12498 is fully counter clockwise and a locking device is attached.

EXAMINERS CUE: V09100 is fully counter clockwise and a locking device is attached.

COMMENTS:

STEP 3: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP C. OPEN the following valves:

SAT (1) V09306, 1A TO lB AFW PUMP DISCH CROSSTIE DRAIN. (TRSL/20/S-T5/W-TA)

(2)V09307, 1ATO IBAFW PUMP DISCH CROSSTIE UNSAT DRAIN. (TRSL/20/S-T5/W-TA)

STANDARD: OPENS V09306 by rotating the handwheel counter clockwise until stopped.

OPENS V09307 by rotating the handwheel counter clockwise until stopped.

EXAMINERS CUE: V09306 is fully counter clockwise.

EXAMINERS CUE: V09307 is fully counter clockwise.

COMMENTS:

JPM NRC P-i Rev 0 1A AFWP Room / Steam Trestle Page 5 of 13

JOB PERFORMANCE MEASURE PERFORMANCECfLECKLIST STEP 4: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEI\

PERFORM the following: CRITICAL STEP D. OPEN MV-09-13, 1A AFW PUMP DISCH TO 16 SIG. (RTGB-102)

STANDARD: CALLS the Unit 1 Control Room and request MV-09-13 to be opened.

EXAMINERS CUE: Acknowledge as Unit 1, and 30 seconds later inform the UNSAT Operator MV-09-13 is open.

COMMENTS:

STEP 5: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP E. WHEN a steady stream of water flows out of the drain valve, THEN CLOSE MV-09-13, IAAFW PUMP DISCH TO lB SIG. SAT STANDARD: CALLS the Unit 1 Control Room and inform them a a steady stream o UNSAT water is flowing out the drain. Request MV-09-13 to be closed.

EXAMINERS CUE: Acknowledge as Unit 1, and 30 seconds later inform the Operator MV-09-13 is closed.

COMMENTS:

JPM NRC P-i Rev 0 1A AFWP Room / Steam Trestle Page 6 of 13

JOB PERFORMANCE MEASURE


RERFORMANCECHECKL1SI STEP 6: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP F. CLOSE the following valves: SAT (1)V09306, 1ATO lB AFW PUMP DISCH CROSSTIE UNSAT DRAI N.

(2) V09307, 1A TO lB AFW PUMP DISCH CROSSTIE DRAI N.

STANDARD: CLOSES V09306 by rotating the handwheel clockwise until stopped.

CLOSES V09307 by rotating the handwheel clockwise until stopped.

EXAMINERS CUE: V09306 is fully clockwise.

EXAMINERS CUE: V09307 is fully clockwise.

COMMENTS:

STEP 7: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP G. OPEN the following valves:

SAT (1) V0931 3, PX-09-4A1 ISOL. (TRSLI43IS-T1IE-TB)

(2) V09314, PX-09-4A1 ISOL. (TRSLI44IS-T1!E-TB) UNSAT STANDARD: OPENS V09313, PX-09-4A1 ISOL. by rotating the handwheel counte clockwise until stopped.

OPENS V09314, PX-09-4A1 ISOL.. by rotating the handwheel counte clockwise until stopped EXAMINERS CUE: V09313 is fully counter clockwise.

EXAMINERS CUE: V09314 is fully counter clockwise.

COMMENTS:

JPM NRC P-i Rev 0 1A AFWP Room I Steam Trestle Page7ofl3

JOB PERFORMANCE MEASURE PFRFORMANCECI-IECKI 1ST STEP 8: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP H. OPEN MV-09-9, IA AFW PUMP DISCH TO IA SIG. (RTGB-102)

SAT STANDARD: CALLS the Unit 1 Control Room to open MV-09-9, 1A AFW PUMP DISCH TOIAS/G. UNSAT EXAMINERS CUE: Acknowledge as Unit 1, and 30 seconds later inform the Operator MV-09-9 is open.

COMMENTS:

STEP 9: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP SAT I. CLOSE V09108, 1A AFW PUMP DISCH ISOL. (TRSL!241N-T5IW-TA)

UNSAT STANDARD: CLOSES V091 08 by rotating the handwheel clockwise until stopped EXAMINERS CUE: V091 08 handwheel has been rotated fully clockwise.

COMMENTS:

JPM NRC P-I RevO 1 A AFWP Room / Steam Trestle Page 8of 13

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP J. PERFORM the following: SAT (1) OPEN V09886, IAAFW PUMP CASING VENT. (TRSLI2OIN-T5/W-TA) UNSAT (2) WHEN a steady stream of water issues from the vent, THEN CLOSE V09886, 1A AFW PUMP CASING VENT.

STANDARD: OPEN V09886 IA AFW PUMP CASING VENT by rotating handwhee counter clockwise until stopped.

IDENTIFIES a steady stream of water from the vent THEN CLOSES V09886 by rotating the handwheel clockwise until stopped.

EXAMINERS CUE: V09886 has been rotated fully counter clockwise.

EXAMINERS CUE: A steady stream of water is issuing from V09886.

EXAMINERS CUE: V09886 handwheel has been rotated fully clockwise.

COMMENTS:

STEP 11: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP K. START 1AAUXILIARY FEEDWATER PUMP. (RTGB-102) SAT STANDARD: CALLS the Unit 1 Control Room and inform them the IA Auxilian Feedwater pump is ready to be started. UNSAT EXAMINERS CUE: Acknowledge as Unit I Control that that the IA Auxiliary Feedwater pump is ready to be started. Wait 30 seconds and inform the Operator the IA AFW pump is running.

EXAMINERS NOTE: The Operator should stand away from the Pump during starting as the Control Room will make that announcement.

COMMENTS:

JPM NRC P-I Rev 0 1A AFWP Room / Steam Trestle Page 9 of 13

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP L. Slowly OPEN V09108, 1AAFW PUMP DISCH ISOL. SAT STANDARD: OPENS V09108 SLOWLY by rotating the handwheel counter clockwise UNSAT until stopped.

EXAMINERS CUE: V09108 has been rotated fully counter clockwise EXAMINERS NOTE: The applicant may elect to partially open V09108 until water issues from vent which is next step. V09108 will be LOCKED OPEN in step 16.

COMMENTS:

STEP 13: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP SAT M. WHEN a steady stream of water flows out of the vent, THEN:

UNSAT (1) CLOSE V09313, PX-09-4A1 ISOL.

(2) CLOSE V09314, PX-09-4A1 ISOL.

STANDARD: CLOSE V0931 3 by rotating handwheel clockwise until stopped.

CLOSE V09314 by rotating handwheel clockwise until stopped.

EXAMINERS CUE: V09313 has been rotated fully clockwise EXAM NIERS CUE: V09314 has been rotated fully clockwise COMMENTS:

JPM NRC P-i Rev 0 1 A AFWP Room / Steam Trestle Page 10 of 13

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 14: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP SAT N. CLOSE MV-09-9, IA AFW PUMP DISCH TO 1A SIG.

UNSAT STANDARD: CALLS Unit I Control Room and requests MV-09-9 be closed.

EXAMINERS CUE: Acknowledge as Unit I Control Room and 30 seconds later inform the Operator MV-09-9 is closed.

COMMENTS:

STEP 15: 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP

0. LOCK OPEN V09120, 1A AFW PUMP DISCH TO IA SIG FW ISOL. SAT STANDARD: OPENS AND LOCKS V09120 by rotating handwheel counter clockwist. UNSAT until stopped. Installs lock on handwheel is a way to prevent rotating thE..

handwheel.

EXAMINERS CUE: V09120 has been rotated counter clockwise until stopped.

Lock has been installed on handwheel.

COMMENTS:

JPM NRC P-i Rev 0 IA AFWP Room / Steam Trestle Page 11 of 13

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 16: 1. IF steam binding occurs on the IA Auxiliary Feedwater pump, THEN CRITICAL PERFORM the following: STEP P. LOCK OPEN V09108, IAAFW PUMP DISCH ISOL.

UNSAT STANDARD: OPENS or verifies open (from step 12) by rotating handwheel counte clockwise until stopped. Installs lock on handwheel is a way to preven rotating the handwheel.

EXAMINERS CUE: V09108 handwheel has been rotated counter clockwise until stopped. Lock has been installed on handweel.

COMMENTS:

STEP 17 (done): 1. IF steam binding occurs on the 1A Auxiliary Feedwater pump, THEN PERFORM the following: SAT Q. VERIFY discharge pressure greater than 1300 psig as indicated on PI-09-7A, IA AFW PUMP DISCH PRESS. (TRSLI27IN-T5/W-TA) UNSAT STANDARD: OBSERVES Pl-09-7A to determine discharge pressure EXAMINERS CUE: PI-09-7A indicated 1350 psig.

COMMENTS:

END OF TASK STOP TIME:

JPM NRC P-I Rev 0 1A AFWP Room / Steam Trestle Page 12 of 13

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit I is in Mode 3 following a Unit trip. The RCO stopped the 1A AFW pump due to erratic discharge pressure and amps.

INITIATING CUES:

You are the NPO. The US has directed you to perform actions or 1-AOP-09.02, Auxiliary Feedwater Attachment 2, Restore Auxiliary Feedwater Flow Following Steam Binding Page 13of13

St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE LOCAL OPERATION OF BORON CONCENTRATION CONTROL UNIT 2 NRC P-2 Developed/Revised by: Larry Rich Date Training Management Approval:

Date JPM NRC P-2 Rev 0 Plant Page 1 of 9

JOB PERFORMANCE MEASURE Task: Perform local blend to the VCT in accordance with 2-AOP-02.01 Boron Concentration System Abnormal Operations Alternate Path JPM? No Facility JPM #: 0821212 KIA: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the CVCS controls including: Al .06 VCT level KIA Rating(s): 3.0 / 3.2 Duty Area(s): N/A Task Information: N/A Task Standard:

This JPM is complete when the VCT is blended to the normal band.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

  • 2-AOP-02.01 Boron Concentration Control System Abnormal Operations Validation Time: 15 minutes Time Critical: No ToolslEquipmentlProcedures Needed:
  • 2-AOP-02.Ol Boron Concentration Control System Abnormal Operations Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
  • Standard in plant PPE Radiological Protection and RWP Requirements:
  • General entry RWP requirements JPM NRC P-2 Rev 0 Plant Page 2of9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

The task you are to perform is: Locally operate the Boron Concentration Control system to blend to the VCT in accordance with Attachment 3 of 2-AOPO2.O1 Boron Concentration Control System Abnormal Operations

  • The performance level to be used for this JPM is SIMULATE.

a This is not a time critical JPM.

  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:

  • All simulator JPM steps, including communications, shall be performed for this JPM.
  • You are to operate any plant equipment that is necessary for the completion of this JPM.
  • The simulator will provide the cues as you perform this JPM.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 2 Control Room is not able to verify proper flow rates to blend to the VCT.

INITIATING CUES:

The US directs you to locally blend to the VCT using Attachment 3 from 2-AOP-02.O1 Boron Concentration Control System Abnormal Operations. The blend ratio is 10:1.

JPM NRC P-2 Rev 0 Plant Page 3 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:

Attachment 3 from 2-AOP-02.O1 Boron Concentration Control System Abnormal Operations.

STEP 1 (1) Station operator at boric acid station and Establish communication between operator and the Control Room. SAT STANDARD: ESTABLISH Communications with Unit 2 Control Room using Radio at th UNSAT Boric Acid station.

EXAMINERS CUE: Unit 2 Control Room acknowledges communications COMMENTS:

STEP 2: (2) PLACE the Makeup Mode Selector switch in MANUAL:

SAT STANDARD: VERIFY Control Room has placed the Mode Selector switch in MANUAL U NSAT EXAMINERS CUE: Control Room has placed the Mode Selector switch in MANUAL COMMENTS:

STEP 3: (3) Start 2A or 2B Boric Acid Pump:

STANDARD: VERIFY Control Room has started 2A or 2B Boric Acid Pump UNSAT EXAMINERS CUE: Control Room has started 2A Boric Acid Pump COMMENTS:

JPM NRC P-i Rev 0 Plant Page4of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: (4) ENSURE V2514 is CLOSED:

SAT STANDARD: ENSURE Control Room has verified V251 4 Emergency Borate is CLOSED.

U NSAT EXAMINERS CUE: Control Room has ensured V2514 is closed.

COMMENTS:

STEP 5: (5) ENSURE FCV-2210X Reactor Makeup is CLOSED SAT UNSAT STANDARD: ENSURE Control Room FCV-2210X is CLOSED EXAMINERS CUE: Control Room has ensured FCV-2210X is closed.

COMMENTS:

STEP 6: (6) ENSURE FCV-221OY Boric Acid Valve is CLOSED SAT UNSAT STANDARD: ENSURE Control Room FCV-221 OY is CLOSED EXAMINERS CUE: Control Room has ensured FCV-2210Y is closed.

COMMENTS:

JPM NRC P-i Rev 0 Plant Page5of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CRITICAL CAUTION STEP

. V2647 provides a direct Boric Acid flow path to the Charging pump suction at 20 gpm With this valve open, boric acid flwo rate can NOT be monitored.

. SAT

. V21 80 provides a direct Primary Water flow path to the Charging pump suction U NSAT EXAMINERS CUE: Control Room calls to OPEN V2647 EMERG Boration from BAM Pumps Dish Isol 1/4 turn OPEN.

STEP 7: (7) DIRECT the Operator at the Boric Acid station to throttle V2647, EM ERG)

Boration From BAM Pumps Disch Isol, OPEN 1/4 turn. (RABI3IS-RA4IE-RAE) 1/

STANDARD: OPENS V2647 1/4 turn and communicates to Control Room valve is turr open.

EXAMINERS CUE: V2647 is turned Counter Clockwise 1/4 turn EXAMINERS CUE: Acknowledges as Control Room V2647 is 1/4 turn open.

COMMENTS:

EXAMINERS CUE: Control Room calls to OPEN V2180 PMW to Charging CRITICAL Pumps Suct Manual Isol I (one) turn open. STEP STEP 8: (8) SAT DIRECT the Operator at the Boric Acid station to throttle V21 80, PMW to Charging Pumps Suct Manual lsol, per blend ration. (RAB/41N-RA3IE-RAE)

UNSAT STANDARD: OPENS V2180, PMW to Charging Pumps Suct Manual Isol, 1 (one) turn open and communicates to Control Room valve is 1 (one) turn open.

EXAMINERS CUE: V2180 is turned Counter Clockwise I (one) turn open EXAMINERS CUE: Acknowledges as Control Room V2180 is I (one) turn open.

COMMENTS:

JPM NRC P-i Rev 0 Plant Page6of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 (9) MONITOR FR-2210 for Reactor Makeup Water flow rate and ADJUST V2180 PMW To Charging Pumps Suct Manual Isol, as required. SAT UNSAT STANDARD: COMMUNICATE to the Control Room to determine if any adjustments tc V2180 need to be made.

EXAMINERS CUE: No adjustments need to be made at this time.

COMMENTS:

EXAMINERS CUE: About 30 seconds later, report: CRITICAL Reactor Makeup water flow indication FRC-2210X has STEP malfunctioned. You are to CLOSE V2180 and REOPEN V2180 1/4 turn. SAT STEP 10 (10) 11 the Reactor Makeup water flow indication malfunctions, Then DIRECT UNSAT the operator to OPEN V2180 1/4 turn open.

STANDARD: CLOSES V21 80 and REOPENS V2180 to 1/4 turn open and communicates to control room V218(

is 1/4 turn open.

EXAMINERS CUE: V2180 is fully clockwise EXAMINERS CUE: V2180 is counter-clockwise 1/4 turn EXAMINERS CUE: Acknowledges as control room V2180 is 1/4 turn open COMMENTS:

JPM NRC P-i Rev 0 Plant Page7of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (11) MONITOR Tave and RCS boron concentration for abnormal changes.

STANDARD: COMMUNICATES with control room to ensure Tave is not changing.

EXAMINERS CUE: Control room states Tave is constant. JPM is complete COMMENTS:

STEP 12: (12) DIRECT operator to adjust V2180 and V2647 as necessary to maintain VCT level 45% to 65%

and plant conditions stable.

STANDARD: None EXAMINERS CUE: Control room states VCT level is 52%. End of JPM COMMENTS:

END OF TASK STOP TIME:

JPM NRC P-i Rev 0 Plant Page8of9

JOB PERFORMANCE MEASURE SIM ULATQRSETZUP_SHE.ET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 2 Control Room is not able to verify proper flow rates to blend to the VCT.

INITIATING CUES:

The US directs you to locally blend to the VCT using Attachment 3 from 2-AOP-02.O1 Boron Concentration Control System Abnormal Operations. The blend ratio is 10:1.

FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DISCONNECT lB INSTRUMENT INVERTER FROM SERVICE FOR PREVENTIVE MAINTENANCE - UNIT I I B Battery Charger Room NRC P-3 Developed/Revised by: Larry Rich Date Technical Review:

Date Training Management Approval:

Date NRC JPM P-3 Rev 0 I B Battery Charger Room Page 1 of 9

JOB PERFORMANCE MEASURE Task: Disconnect the I B I 20V Instrument lnverter from service on Unit 1.

Faulted JPM? No Facility JPM #: 0821067 i2 Knowledge of the physical connections and/or cause effect relationships between the ac distribution system and the following systems: KI .03 DC distribution KIA Rating(s): 3.5 / 4.0 Duty Area(s): NA Task Information: NA Task Standard:

This JPM is complete when the Control Room has been notified that the 1 B Instrument Inverter has been transferred to the Maintenance Bypass Bus and the 1 B Instrument Inverter is out of service.

Evaluation Location: Performance Level:

Simulator In Plant Lab Other Perform Simulate Discuss x x

References:

1-NOP-49.05B, 120 VAC Instrument Bus 1MB (Class 1E) Normal Operations Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:

  • I -NOP-49.05B, 120 VAC Instrument Bus 1MB (Class 1 E) Normal Operations Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
  • Normal PPE for in-plant Radiological Protection and RWP Requirements:

None NRC JPM P-3 Rev 0 1 B Battery Charger Room Page 2 of 9

JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:

  • The task you are to perform is: Disconnect the 1 B I 20V Instrument Inverter from service.
  • The performance level to be used for this JPM is Simulate
  • This is not a time critical JPM.
  • During the performance of the task, I will tell you which steps to simulate or discuss.
  • I will provide you with the appropriate cues for steps that are simulated or discussed.
  • You may use any approved reference materials normally available in the execution of this task, including logs.
  • Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.

INITIAL CONDITIONS:

Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The I B Instrument Inverter is to be removed from service for preventive maintenance.

INITIATING CUES:

You are the SNPO. The US has directed you to remove I B I 20V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with I-NOP-49.05B, 120 VAC Instrument Bus 1 MB (Class I E) Normal Operations. Consider all Concurrent Verifications complete. Step 1, Initiating an Equipment Out Of Service Log entry has been completed.

NRC JPM P-3 Rev 0 1 B Battery Charger Room Page 3 of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME:

1-NOP-49.05B, 120 VAC Instrument Bus 1MB (Class IE) Normal Operations Step 4.1 Remove Instrument Inverter from Service (Shifting Loads to Maintenance Bypass Bus)

STEP 1(4.1.2): At Instrument Bus Transfer Panel IB, VERIFY switch 1010-2, TRANSFER SWITCH 1MD, is positioned to INVERTER ID. SAT STANDARD: VERIFY switch 101 0-2 is positioned to INVERTER ID. UNSAT EXAMINERS CUE: Switch 101 0-2 is positioned to Inverter ID.

COMMENTS:

STEP 2(4.1.3): At lB Maint Bypass Bus, PLACE breaker CKT 13 (Feed to Instrument Bus CRITICAL 1MB) in ON. STEP SAT STANDARD: POSITION 1 B Maint Bypass Bus CKT 13 Breaker to ON.

EXAMINERS CUE: CKT 13 Breaker is ON UNSAT EXAMINERS NOTE: If CKT 13 breaker is already ON, then the standard for this step is VERIFY, and it no longer a critical step.

COMMENTS:

NRC JPM P-3 Rev 0 18 Battery Charger Room Page4of 9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3(4.1.4): At Instrument Bus Transfer Panel 1B, VERIFY 1010-2, MAINT BYPASS BUS I B FEED, power available light is ON.

SAT STANDARD: VERIFY light 101 0-2 is ON at Bus Transfer Panel lB.

EXAMINERS CUE: Light 101 0-2 is ON UNSAT COMMENTS:

STEP 4 (4.1 .5): At 18 Maint Bypass Bus, VERIFY breaker CKT 3 (Sync Signal to Inverter 1B)in ON.

STANDARD: VERIFY lnverter 1 B Maint Bypass Bus I B CKT 3 Breaker is ON. SAT EXAMINERS CUE: CKT 3 Breaker is ON.

UNSAT COMMENTS:

STEP 5 (4.1.6): At 1MB Instrument Inverter, VERIFY IN SYNC light is ON.

STANDARD: VERIFY IN at 1MB Instrument Inverter that the IN SYNC light is ON.

EXAMINERS CUE: IN SYNC light on Inverter 1MB is ON UNSAT COMMENTS:

NRC JPM P-3 Rev 0 lB Battery Charger Room Page5of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4.1.7): IF the IN SYNC light is OFF, THEN STOP procedure and NOTIFY Electrical Maintenance. SAT STANDARD: DETERMINE step is N/A UNSAT EXAMINERS CUE: None COMMENTS:

STEP 7 (4.1.8): At Instrument Bus Transfer Panel 1 B, PLACE 1010-1, TRANSFER CRITICAL SWITCH 1MB, in MAINT BYPASS BUS 1 B. STEP STANDARD: POSITION 101 0-1 in MAINT BYPASS BUS lB. SAT EXAMINERS CUE: 1010-1 is in MAINT BYPASS BUS lB.

UNSAT COMMENTS:

STEP 8 (4.1.9): NOTIFY the Control Room That Instrument Bus 1MB is being powered from Maintenance Bypass Bus 1 B STANDARD: NOTIFY Control Room that 1MB Instrument Bus is now being powered from SAT the Maintenance Bypass Bus.

EXAMINERS CUE: CONTROL ROOM ACKNOWLEDGES UNSAT COMMENTS:

NRC JPM P-3 Rev 0 1 B Battery Charger Room Page6of9

JOB PERFORMANCE MEASURE

- PERFORMANCE CHECKLIST STEP 9 (4.1.10): At 1MB Instrument Inverter, PLACE the following breakers in OFF: CRITICAL STEP A. 1 MB-B4, BYPASS SOURCE A.C. INPUT B. I MB-B2, INVERTER OUTPUT SAT C. IMB-Bi, DC INPUT STANDARD: POSITION Breakers, 1 MB-B4, I MB-B2, and 1 MB-B1 on Inverter 1 MB to UNSAT OFF in that order EXAMINERS CUE: As Student positions these Breakers, cue that the respective breaker is OFF COMMENTS:

STEP 10(4.1.11): At 125V DC Bus IB, PLACE Bkr 1-60224, INVERTER lB in OFF. CRITICAL STEP STANDARD: POSITION DC Bus 1 B Breaker 1-60224 to OFF SAT EXAMINERS CUE: Breaker 1-60224 is OFF UNSAT COMMENTS:

STEP 11(4.1.12): At I B Maint Bypass Bus, PLACE breaker CKT 3 (Sync Signal to Inverter CRITICAL 1B) in OFF. STEP SAT STANDARD: POSITION Maintenance Bypass Bus 1 B CKT 3 Breaker to OFF EXAMINERS CUE: CKT 3 breaker is OFF UNSAT COMMENTS:

NRC JPM P-3 Rev 0 1 B Battery Charger Room Page7of9

JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (4.1.13 done): Notify the Control Room the lB inverter is removed from service.

STANDARD: NOTIFY the Control Room that 1 MB Instrument Inverter is removed from service SAT EXAMINERS CUE: CONTROL ROOM ACKNOWLEDGES UNSAT COMMENTS:

END OF TASK STOP TIME:

NRC JPM P-3 Rev 0 1 B Battery Charger Room Page8ofg

JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)

INITIAL CONDITIONS:

Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The I B Instrument Inverter is to be removed from service for preventive maintenance.

INITIATING CUES:

You are the SNPO. The US has directed you to remove I B I 20V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with 1-NOP-49.05B, 120 VAC Instrument Bus 1MB (Class 1 E) Normal Operations. Consider all Concurrent Verifications complete. Step 1, initiating an Equipment Out Of Service Log entry has been completed.

Page9of9