Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0411701652004-04-23023 April 2004 Technical Specifications, Approve Administrative Procedures and Offsite Dose Calculation Manual Project stage: Acceptance Review ML0403403172004-04-23023 April 2004 License-Operating Amendment, Revises Technical Specification (TS) in Response to Application Dated January 14, 2003 Project stage: Acceptance Review 2004-04-23
[Table View] |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18214A6672018-08-22022 August 2018 FENOC Fleet - Perry Nuclear Power Plant, Unit No. 1 - Correction to the Issuance of Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules (CAC No. MG0136; EPID L-2017-LLA-0259) ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17033A0142017-02-16016 February 2017 Issuance of Amendment Concerning Revision to Technical Specifications to Permit Installation of Upper Containment Pool Gate During Modes 1, 2, and 3 (CAC No. MF7476) (L-16-083) ML16158A3312016-09-14014 September 2016 Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan ML16130A5362016-05-31031 May 2016 Issuance of Conforming Amendment Related to the Direct License Transfer of the Facility Operating License NPF-58 ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) ML15075A1392015-03-30030 March 2015 Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306) L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)2015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML15075A0912015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML13136A1432013-05-16016 May 2013 Nucelar Power Plant, Unit 1 - Re-Issuance of Amendment Regarding Adoption of TSTF-275 and TSTF-300 ML13051B1442013-05-0606 May 2013 Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300 ML13017A4312013-04-18018 April 2013 Issuance of Amendment Revise Technical Specification 3.10.1, Inservice Leak, and Hydrostatic Testing Operation ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML1128602452011-10-17017 October 2011 Issuance of Amendment No. 160, Revise Technical Specification 3.8.1, AC Sources - Operating, Regarding Use of a Delayed Circuit as a Required Offsite Circuit (Emergency Circumstances) ML1125211222011-10-0404 October 2011 Issuance of Amendment Adoption of TSTF - 514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119203822011-08-29029 August 2011 Issuance of Amendment Cyber Security Plan 2023-09-29
[Table view] Category:Safety Evaluation
MONTHYEARML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) ML21063A1572021-03-0404 March 2021 Safety Evaluation for Alternative Request SR-2, Revision 0 Related to one-time Extension Snubbers Testing to ASME OM Code for the Fourth 10-year Inservice Interval at Perry Nuclear Power Plant Unit 1, Docket Nos. 50-440 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval ML20311A6582020-11-10010 November 2020 Issuance of Relief Proposed Alternative Request Associated with Fourth Ten Year Interval Inservice Inspection Interval ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20266G2652020-09-24024 September 2020 Correction Letter for Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20189A0032020-07-10010 July 2020 Relief Request PR-3 for Fourth 10-Year Pump and Valve Inservice Testing Program ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML19072A0122019-03-15015 March 2019 Correction to License Amendment No. 184 Related to Adoption of Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML19072A0852019-03-15015 March 2019 Correction to Request for Alternatives Related to Inservice Testing Program for the Fourth 10 Year Inservice Testing Interval ML19029A0902019-02-25025 February 2019 Request for Alternatives Related to Inservice Testing Program for the Fourth 10-Year Inservice Testing Interval (EPID Nos. L-2018-LLR-0092, 0093, 0094, 0095, and 0096) ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML19037A0412019-02-25025 February 2019 Request for Alternative to Use ASME Code Case N-831 ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML18023A6252018-01-29029 January 2018 Approval of Alternative to Use BWRVIP Guidelines in Lieu of Certain ASME Code Requirements (CAC No. MG0149; EPID 2017-LLR-0112) (L-17-183) ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17270A0302017-10-16016 October 2017 Approval of Alternative to Use ASME Code Case N-513-4 for Repair of Emergency Service Water System Piping (CAC No. MG0130; EPID L-2017-LLR-0080)(L-17-278) ML17193A3822017-07-18018 July 2017 Correction to Safety Evaluation for License Amendment No. 177 ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) 2023-09-28
[Table view] |
Text
April 23, 2004 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A200 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT 1 - ISSUANCE OF AMENDMENT (TAC NO. MB7518)
Dear Mr. Kanda:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 129 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit 1. This amendment revises the Technical Specifications (TS) in response to your application dated January 14, 2003.
This amendment revises TS 5.1.1, 5.4.1, and 5.5.1 which replaces the requirement for the plant manager to approve administrative procedures and the Offsite Dose Calculation Manual. The plant manager approval signature will be replaced with the signature of a procedurally authorized individual who would be the more appropriate authority for approval of the activity.
Additionally, a change is proposed to revise License Condition 2.F to replace the 30-day reporting period with a direct reference to the Title 10 of the Code of Federal Regulations Part 50, Section 50.73 subsection that contains the reporting period. The License Condition currently references 10 CFR 50.73 for use in reporting plant issues.
A copy of the Safety Evaluation associated with this amendment is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Amendment No. 129 to License No. NPF-58
- 2. Safety Evaluation cc w/encls: See next page
ML040340317 (Amendment)
ADAMS Accession No.: ML041170165 (Technical Specifications)
ADAMS Accession No.: ML040340317 (Package) *see previous concurrence OFFICE PM:PD3-2 LA:PD3-2 SC:IROB* OGC
- SC:PD3-2 NAME SSands PCoates DTrimble RWeisman AMendiola DATE 04/19/04 04/19/04 04/16/04 03/22/04 04/22/04 Perry Nuclear Power Plant, Unit 1 cc:
Mary E. OReilly Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St. 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident Inspectors Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Dennis Clum Regional Administrator, Region III Radiological Assistance Section Supervisor U.S. Nuclear Regulatory Commission Bureau of Radiation Protection 801 Warrenville Road Ohio Department of Health Lisle, IL 60532-4531 P.O. Box 118 Columbus, OH 43266-0118 Sue Hiatt OCRE Interim Representative Zack A. Clayton 8275 Munson DERR Mentor, OH 44060 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Mr. Vernon K. Higaki P.O. Box 1049 Manager - Regulatory Affairs Columbus, OH 43266-0149 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Chairman P.O. Box 97, A210 Perry Township Board of Trustees 10 Center Road 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 Timothy Rausch, Plant Manager Daniel Z. Fisher FirstEnergy Nuclear Operating Company Transportation Department Perry Nuclear Power Plant Public Utilities Commission P.O. Box 97, SB306 180 East Broad Street Perry, OH 44081 Columbus, OH 43215-3793 Mayor, Village of North Perry Joseph J. Hagan North Perry Village Hall Senior Vice President 4778 Lockwood Road Engineering and Servicees North Perry Village, OH 44081 First Energy Nuclear Operating Company 76 South Main Street Donna Owens, Director Akron, Ohio 44308 Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009
FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 129 License No. NPF-58
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the FirstEnergy Nuclear Operating Company (the licensee) dated January 14, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 129 are hereby incorporated into this license. The FirstEnergy Nuclear Operating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. License Condition 2.F Additionally, the license is amended as indicated in License Condition 2.F of Facility Operating License No. NPF-58. Except for Section 2.C.(2), the licensee shall report any violations of the requirements contained in Section 2.C of this license in the following manner: Initial notification shall be made within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup in accordance with the procedures described in 10 CFR 50.73(a)(1), (b),(c), and (e).
- 4. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 23, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 129 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Appendix "A" Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 5.0-1 5.0-1 5.0-5 5.0-5 5.0-6 5.0-6 Replace the following page of the Operating License (No. NPF-58), License Condition 2F, with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Insert SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 129 TO FACILITY OPERATING LICENSE NO. NPF-58 FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT DOCKET NO. 50-440
1.0 INTRODUCTION
By letter dated January 14, 2003, FirstEnergy Nuclear Operating Company (FENOC), the licensee, submitted a license amendment request for the Perry Nuclear Power Plant (PNPP) to change Technical Specifications (TS) 5.1.1, 5.4.1, and 5.5.1. The proposed changes would replace the requirement for the plant manager to approve administrative procedures and the Offsite Dose Calculation Manual (ODCM) and clarify that the time for submitting written reports of violations of License Condition 2.C (except 2.C.(2)) is governed by Title 10 of the Code of Federal Regulations, Part 50, Section 50.73 (10 CFR 50.73).
2.0 BACKGROUND
In this license amendment request, the licensee proposes changes to TS 5.1.1, 5.4.1, and 5.5.1 which would replace the requirement for the plant manager to approve administrative procedures and the ODCM. The plant manager approval signature would be replaced with the signature of a procedurally authorized individual who would be the more appropriate authority for approval of the activity. Additionally, a change is proposed to revise License Condition 2.F to replace the 30-day reporting period with a direct reference to the 10 CFR 50.73 subsection that contains the reporting period. The License Condition already references 10 CFR 50.73 for use in reporting plant issues. Both changes are considered administrative in nature and, for the reasons set forth below, will still maintain an acceptable level of program control.
3.0 EVALUATION The licensee proposes the following changes in their TS amendment request:
- TS 5.1, Responsibility, Item 5.1.1, delete the phrase and all administrative procedures, after the words equipment that affect nuclear safety.
- TS 5.4.1, Scope, insert as a new section, Responsibility, then add the sentence, The above procedures will be approved by procedurally authorized individuals.
- TS 5.5.1, Offsite Dose Calculation Manual (ODCM), delete the term of the plant manager, after the words Shall become effective after review and acceptance including approval, and replace with the term, by the procedurally authorized individual.
The proposed change to License Condition 2.F of the Operating License deletes the phrase within thirty (30) days, and adds subsection (a)(1) after the regulation 10 CFR 50.73 within the License Condition.
Regulatory Guide (RG) 1.33, Quality Assurance Program Requirements (Operation), provides guidance for administrative controls for nuclear power plants. The RG endorses American National Standards Institute (ANSI) N18.7-1976/ANS-3.2, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants. This standard provides acceptable processes for the development and implementation of administrative controls associated with site activities. FENOC is committed to RG 1.33 and ANSI N18.7-1976/ANS-3.2 standard, as documented in their Quality Assurance (QA) Program Manual.
The proposed change to replace the plant managers approval with the approval authority listed as procedurally authorized individuals, will allow other PNPP management personnel to approve activities when their position is designated as the approval authority. This change should improve effectiveness in the control of site activities since the person responsible for the activity implementation will be the direct authority for approval. The ODCM is controlled as a procedure at PNPP and therefore, the amendment request will not discriminate between procedures and the ODCM. Nuclear Regulatory Commission approval of this change will allow for designation in procedures of the most appropriate authority for activities affecting nuclear safety and will allow increased organizational flexibility and responsiveness, while continuing to meet ANSI/ANS. The changes proposed by the licensee are consistent with NUREG-1434, Standard Technical Specifications General Electric Plants, BWR/6.
4.0 TECHNICAL EVALUATION
TS 5.1, 5.4.1, and 5.5.1 Technical Specifications 5.1, 5.4.1, and 5.5.1 identify the approval authority for plant procedures (including plant administrative procedures), Emergency Operating Procedures, quality assurance for effluent and environmental monitoring, as well as the ODCM. The proposed change to replace the plant manager approval with procedurally authorized individuals, as the approval authority continues to meet the ANSI N18.7-1976/ANS 3.2 standard, entitled Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants. The PNPP is currently committed to ANSI N18.7-1976/ANS 3.2 through its QA Program. ANSI N18.7-1976/ANS 3.2, Section 5.2.15, Review, Approval, and Control of Procedures, states that such approvals be provided by authorized personnel, and does not limit this to a single individual, such as the plant manager.
This change will allow for other PNPP plant management to approve these items when their position is designated the approval authority for the procedure controlling the activity. In addition, because the approval authority will be that established for the procedure, it is no longer necessary for TS 5.1.1 to provide for the delegation of approval to a designee by the plant manager. Because changes in the QA Program are controlled by the requirements of 10 CFR 50.54(a), the designation of procedurally authorized individuals, and the ongoing commitment to ANSI N18.7-1976/ANS 3.2 in the QA Program will maintain proper control over items in TS 5.1.1 and 5.5.1. Also, the PNPP intends to designate section managers, superintendents, and supervisors as the approval authority for site procedures. Individuals in these positions must satisfy the qualification requirements of ANSI N18.1-1971, Standard for Selection and Training of Personnel for Nuclear Power Plants, as stated in TS 5.3, Unit Staff Qualifications, and the Updated Safety Analysis Report (USAR), Table 13.1-1, Perry Staff
Titles and ANSI N18.1-1971 Equivalent. The proposed change will not change these qualification requirements and changes to the USAR are controlled by the requirements of 10 CFR 50.59. In view of the foregoing, the proposed changes to TS 5.1, 5.4.1, and 5.5.1 are acceptable.
In addition, guidance for assigning approval authority for administrative controls associated with site activities is contained in plant procedures. This will provide a measure of control and aid in ensuring that the proper individuals will be assigned to approve procedures. This is also consistent with guidance contained in ANSI N18.7/ANS3.2 and provides acceptable guidance and processes for the development and implementation of administrative controls associated with site activities.
The staff reviewed the submitted information regarding the proposed TS changes. The staff established that the methodology employed has been approved by the NRC and satisfies the guidance in RG 1.33, Quality Assurance Program Requirements, and ANSI N18.7-1976/ANS3.2. The proposed changes are also in accordance with NUREG-1430, Revision 1, and are administrative in nature and are acceptable to the staff. The methodology was applied correctly by PNPP, thus, the proposal is acceptable.
License Condition 2.F License condition 2.F references the use of 10 CFR 50.73 for the written reporting of particular events. The proposed change replaces the time frame listed in the TS associated with reporting in accordance with Title 10, Part 50, Section 50.73, of the Code of Federal Regulations, and directly references the portions of 10 CFR 50.73 that contain the reporting time period. The reporting periodicity is a requirement of the regulation, and is acceptable.
5.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
S This amendment relates to changes in recordkeeping, reporting, or administrative procedures or requirements. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (68 FR 15761). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
S The staff has concluded, based on the considerations above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Stephen P. Sands Date: April 23, 2004