MONTHYEARML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report ML23073A1822023-03-14014 March 2023 Inservice Inspection Owner'S Activity Report (OAR) ML22108A2242022-04-14014 April 2022 Steam Generator Tube Inspection Report for the Fall 2021 Refueling Outage ML22048B8192022-02-17017 February 2022 Inservice Inspection Owner'S Activity Report (OAR) ML21243A3132021-08-27027 August 2021 Steam Generating Tube Inspection Report for the Spring 2021 Refueling Outage ML21235A0912021-08-23023 August 2021 Inservice Inspection Owner'S Activity Report Ended on June 1, 2021 ML20304A1542020-08-25025 August 2020 Inservice Inspection Owner'S Activity Report ML20101H3072020-03-26026 March 2020 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML20087H0092020-03-11011 March 2020 Steam Generator Tube Inspection Report for the Fall 2019 Refueling Outage ML20136A2532020-02-18018 February 2020 Submittal of Inservice Inspection Owner'S Activity Report for Surry Unit 1 Refueling Outgae s1R29 Which Ended on 11/29/2019 ML19331A9162019-11-27027 November 2019 ASME Section XI Inservice Inspection Program Proposed Alternative Request S2-15-ISI-05 to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Pipe Repair ML19071A1072019-03-0404 March 2019 Inservice Inspection Owner'S Activity Report ML18331A1622018-11-19019 November 2018 Steam Generator Tube Inspection Report for the Spring 2018 Refueling Outage ML18229A0622018-08-10010 August 2018 Inservice Inspection Owner'S Activity Report ML17251A8952017-08-31031 August 2017 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information ML17261A1872017-08-29029 August 2017 Inservice Inspection Owner'S Activity Report ML17121A3782017-04-24024 April 2017 Submittal of Steam Generator Tube Inspection Report for the Fall 2016 Refueling Outage ML17040A4072017-02-0606 February 2017 Inservice Inspection Owner'S Activity Report 1-5-1-2, for Refueling Outage S1R27, First Period of the Fifth ISI Interval ML16355A3462016-12-14014 December 2016 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1) ML16141A1172016-05-10010 May 2016 Inspection Report for the Fall 2015 Refueling Outage ML16131A6352016-05-0505 May 2016 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Preformed in the Fourth 10-Year Insevice Inspection Interval ML16081A1672016-03-0101 March 2016 Inservice Inspection Owner'S Activity Report ML15324A0142015-11-0606 November 2015 Steam Generator Tube Inspection Report for the Spring 2015 Refueling Outage ML15293A1242015-10-0909 October 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML15224B3602015-07-31031 July 2015 Inservice Inspection Owner'S Activity Report (OAR) ML14335A6062014-11-19019 November 2014 Response to Request for Additional Information Re 2013 Steam Generator Inservice Inspection Report ML14294A4492014-10-16016 October 2014 Steam Generator Tube Inservice Inspection Report for the Spring 2014 Refueling Outage ML14216A3452014-07-24024 July 2014 Inservice Inspection Owner'S Activity Report ML14133A0062014-05-0707 May 2014 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML14135A3652014-05-0606 May 2014 Steam Generator Tube Inspection Report for the Fall 2013 Refueling Outage ML14056A1942014-02-18018 February 2014 Inservice Inspection Owner'S Activity Report ML13336A1422013-11-26026 November 2013 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML13149A2292013-05-10010 May 2013 Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage ML13128A1042013-05-0101 May 2013 Inservice Testing Program for Pumps and Valves Fifth Ten Year Interval Update and Associated Relief Requests ML13056A4122013-02-15015 February 2013 Inservice Inspection Owner'S Activity Report (OAR) ML12321A0472012-10-30030 October 2012 Steam Generator Tube Inservice Inspection Report for the Spring 2012 Refueling Outage ML12242A3472012-08-16016 August 2012 Inservice Inspection Owner'S Activity Report (OAR) ML11291A0582011-10-0505 October 2011 Steam Generator Tube Inservice Inspection Report for the 2011 Refueling Outrage ML11264A0362011-09-0606 September 2011 Inservice Inspection Owner'S Activity Report (OAR) ML11154A1012011-05-24024 May 2011 Steam Generator Tube Inservice Inspection Report for the 2010 Refueling Outage ML1130802582011-02-21021 February 2011 Inservice Inspection Owner'S Activity Report ML1015305332010-05-24024 May 2010 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML1006804222010-02-25025 February 2010 Inservice Inspection Owner'S Activity Report (OAR) ML0932002072009-11-0404 November 2009 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML0923002302009-08-0707 August 2009 Inservice Inspection Owner'S Activity Report ML0900601112008-11-14014 November 2008 Steam Generator Tube Inservice Inspection Report for the 2008 Refueling Outage ML0824603182008-08-12012 August 2008 Inservice Inspection Owner'S Activity Report ML0815602162008-05-21021 May 2008 Steam Generator Tube Inservice Inspection Report for the 2007 Refueling Outage ML0806406572008-02-22022 February 2008 Inservice Inspection Owner'S Activity Report (Form OAR-1), Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval 2023-08-30
[Table view] Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] |
Text
VIRGINIA ELECTRIC AND POWrR COMPANY RIciINIoND, VIRGINIA 23261 June 29, 2004 U.S. Nuclear Regulatory Commission Serial No.04-337 Attention: Document Control Desk NL&OS/GDM RO Washington, D.C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
REVISION TO SURRY POWER STATION UNIT 2 THIRD INTERVAL RELIEF REQUEST NO. SR-004 REV. 2 WITHDRAWAL OF SURRY UNIT 1 FOURTH INTERVAL RELIEF REQUEST NO.
CMP-002 Surry Power Station Units 1 and 2 are presently in the fourth ten-year inservice inspection (ISI) interval and use the 1998-2000 Edition of ASME Section Xl as the basis for the ISI Program for each unit. The Surry Unit 1 and Unit 2 Fourth Interval ISI Program Plans were submitted to the NRC in letters dated December 12, 2002 (Serial No.02-642) and August 25, 2003 (Serial No.03-428), respectively, and included Relief Request CMP-002 for each unit. These relief requests were for the ASME Section Xi Code Category C-G pump casing weld examination requirement on the Outside Recirculation Spray (ORS) pumps and the Low Head Safety Injection (LHSI) pumps.
Subsequent to these submittals, Dominion has discovered that the welds identified by the relief requests are not the actual pump casing welds, rather they are welds on the pump suction can in which the pump casing is contained and supported. However, upon further review of the exemption defined in paragraph IWC-1223 of the ASME Section XI 2000 Code Edition, Dominion has determined that the relief requested in CMP-002 is not required for the fourth interval. Therefore, the Surry Unit 1 Relief Request CMP-002 submitted in our December 12, 2002 letter is hereby withdrawn.
Dominion previously withdrew the Surry Unit 2 Relief Request CMP-002 in a letter dated May 5, 2004 (Serial No. 03-428A).
Similar relief requests that included the incorrect welds for the ORS and LHSI pump casing welds were also submitted for Surry Units 1 and 2 in the second and third ISI intervals. (The first interval ISI Program did not require such relief since the class 2 pump casing welds in question were exempt per ASME Section Xl paragraph IWC-1 220 of the 1974 Edition with 1975 Addenda due to temperature and pressure maximums.)
Surry Units 1 and 2 used the 1989 Edition of ASME Section Xi for the third interval and the 1980 Edition with the 1980 Winter Addenda for the second interval. These Code editions did not include an exemption similar to those noted above for the first and fourth ISI intervals. The second interval relief requests were approved by the NRC in a letter dated April 14, 1994, for both units. Similar third interval relief requests were
SN 04-337 Docket Nos. 50-280/281 Page 2 of 4 originally approved for Unit 1 in an NRC letter dated July 19, 1995, and for Unit 2 in an NRC letter dated August 30, 1995. The NRC subsequently approved later revisions for both units in a letter dated August 21, 2001.
A review of Surry maintenance records indicates that certain ORS and LHSI pumps were disassembled for maintenance within the second interval on the following dates:
01-RS-P-2A 06/07/88 01-RS-P-2B 10/07/87 01-SI-P-1A 07/04/89 02-RS-P-2A 01/19/89 02-RS-P-2B 01/19/89 02-SI-P-1 B 05/02/93 During the third inspection interval only one pump was disassembled for maintenance:
02-SI-P-1 B 03/16/95 The available records reviewed indicate that pump suction can weld examinations were performed in accordance with the relief requests; however, the examinations were on the incorrectly specified welds. This discovery constituted a non-conforming condition in accordance with Generic Letter 91-18 for the second interval. An evaluation and operability determination of the non-conforming condition were completed, and it was determined that the pumps were operable. By invoking the code allowable one-year interval extension for Surry Unit 2, the third inspection interval will end on May 9, 2005.
Therefore, Dominion plans to disassemble 2-SI-P-1B during the Spring 2005 refueling outage and perform an inspection on the correct pump casing welds to appropriately close out the third interval.
Therefore, a revised third interval Unit 2 relief request (SR-004 Rev. 2) is attached which identifies the correct pressure-retaining pump casing welds. The relief request includes as an alternative the use of the 1995-1996 Edition of the ASME Section Xl Code, which defines these welds as "inaccessible". In the 1995 Addenda of the code, IWC-1223 was written to define "Inaccessible Welds" as "Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe." Dominion interprets this definition as applying to the pump casing welds on the ORS and LHSI pumps. Furthermore, Dominion's interpretation of the 1995 code requirement is that a 100% surface examination of the accessible pump casing welds on one pump of a similar group is required each interval only if a pump is disassembled for maintenance rendering the welds accessible for examination.
In accordance with 10 CFR 50.55a(g)(4)(iv), Dominion requests to use a later edition of the ASME Section Xl Code for inspection of the ORS and LHSI pumps Category C-G pump casing welds. The Surry Unit 2 third interval Relief Request SR-004, Rev. 2, is
SN 04-337 Docket Nos. 50-280/281 Page 3 of 4 attached for NRC review and approval. In addition, Dominion is withdrawing Surry Unit 1 Relief Request CMP-002 that was submitted in our December 12, 2002 letter for the fourth interval for the reasons cited above.
If you have any questions or require additional information, please contact Mr. Gary D.
Miller at (804) 273-2771.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, GA 30303-3415 Mr. S. R. Monarque U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8H12 Rockville, MD 20852 Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
Serial No.04-337 Docket Nos. 50-280/281 Attachment Revised Third Interval Relief Request Outside Recirculation Sprav and Low Head Safety Injection Pumps Casing Welds SR-004, Rev. 2 Surry Power Station Unit 2 Virginia Electric and Power Company (Dominion)
Serial No.04-337 Docket Nos. 50-280/281 Attachment Virginia Electric and Power Company Surry Power Station Unit 2 Third Ten Year Interval RELIEF REQUEST SR-004, Rev. 2 Identification of Components:
Systems: Recirculation Spray (RS) and Safety Injection (SI)
Components: Pump casing welds Component Drawing Weld No.
2-RS-P-2A 11548-WMKS-RS-P-2A Pump casing welds*
2-RS-P-2B 11548-WMKS-RS-P-2B Pump casing welds*
2-SI-P-1A 11548-WMKS-SI-P-1A Pump casing welds*
2-SI-P-1 B 11548-WMKS-SI-P-1B Pump casing welds*
- Welds will be visually identified and assigned weld numbers upon inspection.
Drawings will be changed accordingly.
II. Code Requirements:
Section Xl of the ASME Boiler and Pressure Vessel Code, 1989 Edition, Category C-G, Item Number C6.10, requires that a surface examination be performed on 100% of the welds each inspection interval. For a ten-year interval the examination can be limited to one pump in the case of multiple pumps of similar design, size, function and service in a system. The examination may be performed from either the inside or outside surface of the component.
Ill. Basis for Relief:
In the 1995 Editionof the ASME Section Xl Code, paragraph IWC-1223 in section IWC-1220, "Components Exempt From Examination," was changed to read 'Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe" in the definition of "Inaccessible Welds".
Page 1 of 2
Serial No.04-337 Docket Nos. 50-280/281 Attachment These pumps are vertical, two-stage, centrifugal pumps with an extended shaft and casing that allows suction from the containment sump. This pump casing extends subgrade for more than 40 feet. The pump column consists of bolted flange sections of pipe. Circumferential welds exist at the pipe to flange locations. The pump is suspended in a suction can container, which renders the welds inaccessible while the pump is in operational standby. Only when the pump is disassembled for maintenance do the pressure retaining casing welds become accessible.
The 1995-96, and subsequent 1998-2000, edition of the ASME Section Xl Code require that a surface examination be performed on the pump casing welds only when the pump is removed from the suction can for maintenance; thus, allowing accessibility to the welds. The later edition of the code does not require disassembly of the pump for the sole purpose of performing the code specified surface examination. To remove the pumps only to perform the Section Xl examination is inconsistent with the requirements of the later code edition and is considered an unnecessary burden.
IV. Proposed Alternate Examination In accordance with 10 CFR 50.55a(g)(4)(iv), Dominion requests approval to use paragraph IWC-1223 of the 1995-96 edition of the ASME Section Xl Code to perform the inspections of Category C-G pump casing welds on the Outside Recirculation Spray and Low Head Safety Injection pumps. When a pump is removed for maintenance activities, the code required surface examination of 100% of the accessible welds will be performed in accordance with Table IWC 2500-1 Category C-G, Item C6.10. Related requirements of the 1995-96 code edition regarding the Category C-G, Item C6.10 will be met.
As detailed in Note (1) of Table IWC-2500-1, examination of only one pump in a group is required per interval. Thus, when one recirculation spray pump and one safety injection pump receive examination, the ten-year interval code requirement will be met. Only one examination per pump group is required, regardless of the number of times the pumps are disassembled.
As accepted in the more recent 1995-1996, and the 1998-2000, Code editions, the proposed alternative will not compromise the overall level of plant quality and safety.
Page 2 of 2