VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 12, 2008 U.S. Nuclear Regulatory Commission Serial No.: 08-0480 Attention: Document Control Desk S&LITJN: RO Washington, D.C. 20555 Docket No.: 50-281 License No.: DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNIT 2 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT As allowed by ASME Code Case N-532-4, "Repair/ Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission,Section XI, Division 1," the Form OAR-1 for Surry Unit 2 refueling outage

$2R21 is enclosed. This document contains in Tables 1 and 2 the reporting requirements for the first refueling outage of the second period in the fourth ten-year inservice inspection interval for Surry Unit 2 from November 21, 2006 through the duration of the $2R21 refueling outage that was completed on May,21, 2008. The second period ends on May 9, 2011.

Should you have any questions regarding this submittal, please contact Mr. Trace Niemi at (757) 365-2848.

Very truly yours, B. L. Stanley Director Nuclear Station (S&L)

Surry Power Station Commitments made in this letter: None

Attachment:

1. Owner's Activity Report (Form OAR-i), Surry Unit 2 Refueling Outage $2R21, Second Period of the Fourth Ten-Year ISI Interval

Serial No.08-0480 Docket No. 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 NRC Senior Resident Inspector Surry Power Station Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.08-0480 Docket No. 50-281 Attachment Owner's Activity Report (Form OAR-i)

Surry Unit 2 Refueling Outage S2R21 Second Period of the Fourth Ten-Year ISI Interval Virginia Electric and Power Company (Dominion)

SURRY POWER STATION, S2R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 2-4-2-1 (Unit 2 4th Interval, 2 rd Period- 1s' Report). Rev- 1 Plant: Surry Power Station, 5570 Hog Island Rd, Surry, VA 23883 Unit No. 2 Commercial service date 05/01/73 Refueling outage no. S2 R21 Current inspection interval 4th nd Current inspection period Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition through 2000 Addendum Date and revision of inspection plans Surry Unit 2 4th Interval ISI Plan Revision 5, August 6, 2008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans. N/A Code Cases used: N-532-4, see ISI Plan Revision 5 for complete list CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this Report are correct; (b) the examinations and test-s meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluation supporting the completion of S2 R21 conform to the requirements of Signed ___________________________Date (Owner's or Owner's Designee, Title)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virginia and employed by H.S.B. - CT of Hatford, CT have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacements activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

____Commissions VA 883(R)

Inspector's Signature National Board, State, Province, and Endorsements Date 0 C

SURRY POWER STATION S2R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE

  • Augmented examination exempted from ANII

SURRY POWER STATION S2R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Condition Found During Repair, Scheduled Replacement, Section XI R/R Plan Code or Corrective Item Description Description of Work Examination Date #

Class Measure or Completed Test (Yes or No) 2 Replacement 02-SI-46A Replace fasteners No 05/05/2008 2008-158 1 Replacement 02-RH-MOV-2700 Replace bolting on No 05/07/2008 2008-164 Support 15 support 1 Replacement 02-SI-242 Replace fasteners Yes 05/07/2008 2008-159 1 Replacement 02-RC-P-1A Replace 1, #1 seal house Yes 05/08/2008 2008-152 bolt 2 Replacement 02-RH-45 Replace pipe No 05/10/2008 2008-167 2 Repair 02-RH-E-1A Repair indications No 05/13/2008 2008-120 2 Replacement 10" RH-105-602- Replace bolt on support Yes 05/17/08 2008-108 SH 28A