Category:Inspection Report
MONTHYEARIR 05000331/20240022024-10-25025 October 2024 NRC Inspection Report No. 07200032/2024001 and 05000331/2024002 IR 07200032/20224012023-03-0909 March 2023 Public DAEC ISFSI - Independent Spent Fuel Storage Installation Security Inspection Report 07200032/2022401 IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center IR 05000331/20214022021-12-30030 December 2021 DAEC Decommissioning Reactor - Decommissioning Security Inspection Report 05000331/2021402 IR 05000331/20214012021-08-25025 August 2021 DAEC Decommissioning Reactor (Permanently Shut Down) and Independent Spent Fuel Storage Installation - Security Inspection Reports 05000331/2021401; and 07200032/2021401 IR 05000331/20200042021-02-12012 February 2021 Integrated Inspection Report 05000331/2020004 and 05000331/2020501 IR 05000331/20200102021-01-0707 January 2021 NRC Inspection Report No. 05000331/2020010(DNMS) - Duane Arnold Energy Center IR 05000331/20200032020-11-0606 November 2020 Integrated Inspection Report 05000331/2020003 and 07200032/2020001 IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20200022020-08-0404 August 2020 Integrated Inspection Report 05000331/2020002 IR 05000331/20204022020-07-14014 July 2020 Security Baseline Inspection Report 05000331/2020402 IR 05000331/20200012020-06-22022 June 2020 Reissue - Duane Arnold Energy Center - Integrated Inspection Report 05000331/2020001 IR 05000331/20204012020-06-10010 June 2020 Security Baseline Inspection Report 05000331/2020401 ML20132A2662020-05-11011 May 2020 Integrated Inspection Report 05000331/2020001 IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) IR 05000331/20190042020-01-28028 January 2020 Integrated Inspection Report 05000331/2019004 IR 05000331/20190132019-12-11011 December 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000331/2019013 IR 05000331/20190032019-11-12012 November 2019 Integrated Inspection Report 05000331/2019003 IR 05000331/20194112019-10-21021 October 2019 Dune Arnold Energy Center - NRC Baseline Inspection Report 05000331/2019411 IR 05000331/20190112019-10-0101 October 2019 NRC Inspection Report 05000331/2019011 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) IR 05000331/20190022019-08-0101 August 2019 Integrated Inspection Report 05000331/2019002 IR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 IR 05000331/20190012019-05-0303 May 2019 NRC Integrated Inspection Report 05000331/2019001 IR 07200032/20194012019-05-0202 May 2019 Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200032/2019401 (DRS-G.Bonano) IR 05000331/20190102019-04-18018 April 2019 NRC Biennial Problem Identification and Resolution Inspection Report 05000331/2019010 IR 05000331/20194102019-04-16016 April 2019 NRC Security Baseline Inspection Report 05000331/2019410 (DRS-G.Bonano) IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180042019-02-0707 February 2019 Errata - Duane Arnold Energy Center - NRC Integrated Inspection Report 05000331/2018004 ML19029A4432019-01-29029 January 2019 NRC Integrated Inspection Report 05000331/2018004 IR 05000331/20182012019-01-0808 January 2019 NRC Security Baseline Inspection Report 05000331/2018201 IR 05000331/20184142018-11-29029 November 2018 NRC Cyber Security Inspection Report 05000331/2018414 - Cover Letter (DRS-G.Hausman) IR 05000331/20180032018-10-24024 October 2018 NRC Integrated Inspection Report 05000331/2018003 IR 05000331/20184132018-10-11011 October 2018 NRC Security Baseline Inspection Report 05000331/2018413 (DRS-J.Kutlesa) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20180022018-08-0303 August 2018 NRC Integrated Inspection Report 05000331/2018002 IR 05000331/20184122018-07-17017 July 2018 NRC Security Baseline Inspection Report 05000331/2018412 (DRS-G.Bonano) IR 05000331/20185032018-05-29029 May 2018 NRC Emergency Preparedness Inspection Report 05000331/2018503 (Gph) IR 05000331/20180012018-05-0404 May 2018 NRC Integrated Inspection Report 05000331/2018001 IR 05000331/20184112018-03-23023 March 2018 NRC Security Baseline Inspection Report 05000331/2018411 - (Cover Letter Only) IR 05000331/20180102018-03-16016 March 2018 NRC Triennial Fire Protection Inspection Report 05000331/2018010 (DRS-A.Dahbur) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) IR 05000331/20184102018-02-26026 February 2018 NRC Material Control and Accounting Program Inspection Report 05000331/2018410 IR 05000331/20170042018-01-22022 January 2018 NRC Integrated Inspection Report 05000331/2017004; 07200032/2017001; and Emergency Preparedness Annual Inspection Report 05000331/2017501 ML18012A5482018-01-10010 January 2018 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000331/2018001 (DRS-A.Dunlop) IR 05000331/20174072017-12-14014 December 2017 NRC Security Baseline Inspection Report 05000331/2017407 - Cover Letter Only (DRS-M.Ziolkowski) 2024-10-25
[Table view] Category:Letter
MONTHYEARIR 05000331/20240022024-10-25025 October 2024 NRC Inspection Report No. 07200032/2024001 and 05000331/2024002 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 – Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnolds Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks 2024-09-04
[Table view] |
Text
ber 11, 2019
SUBJECT:
DUANE ARNOLD ENERGY CENTER - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000331/2019013
Dear Mr. Curtland:
On December 5, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Duane Arnold Energy Center and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 05000331 License No. DPR-49
Enclosure:
As stated
Inspection Report
Docket Number: 05000331 License Number: DPR-49 Report Number: 05000331/2019013 Enterprise Identifier: I-2019-013-0018 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, Iowa Inspection Dates: December 2, 2019 to December 5, 2019 Inspectors: G. Hausman, Senior Reactor Inspector J. Robbins, Reactor Inspector N. Shah, Project Engineer Approved By: Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at Duane Arnold Energy Center, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01)
Main article: IP 71111.17
The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from 2015 to 2019.
- (1) AR 02175375-01, Power System Stabilizer Removal from Service, January 16, 2017
- (2) CA 02102327-01, Placement of Portable Heaters in the Motor Generator Set Room, July 1, 2016
- (3) EC 0000281703, Chromalox Replacement Project, Revision 0
- (4) EC 0000282458, River Water System Cable Replacement, Revision 0
- (5) EC 0000287931, Implementation of Revised Calculations for Loss of Coolant Accident Dose Consequences, Revision 0
- (6) EC 0000287997, Residual Heat Removal Discharge Header Pressure Switch Setpoint, Revision 1
- (7) EC 0000156026, Replace Existing Reactor Feedwater Pumps (RFP) and Motors with RFP and Motors of Larger Capacity, Revision 43
- (8) EC 0000283115, Flow Indication Controller (FIC2309) Replacement Siemens 353 Controller from Design Level A to B, Revision 1
- (9) EC 0000283472, Fukushima Spent Fuel Pool Level Instrumentation, Revision 6
- (10) EC 0000283785, Replace Obsolete Standby Gas Treatment System Flow Indication Controllers (FIC5828A/B), Revision 2
- (11) EC 0000283960, Raise All Level Setpoints for Limit Switch LS3701 to Allow Pump Starts Due to Sticking Level Element Float LE3701 at Lowest Level, Revision 0
- (12) EC 0000285459, Connect Diesel Air Compressor to Plant Air System, Revision 0
- (13) EC 0000285499, Calculation CAL-E95-015 Calibration Frequency Revised, Revision 1
- (14) EC 0000285928, Programmable Logic Controller (PLC1701C) Replacement, Revision 1
- (15) EC 0000286670, Compressor Motor (1K001-M) Tripped, Overload Jumper-ed Out (Bypassed), Revision 1
- (16) EC 0000287838, Revise Temperature Element (TE4403) Setpoint on Temperature Recorder (TR4400) to Provide Annunciation with Temperature Rise, Revision 0
- (17) EC 0000287965, Disable Low Oil Level Alarm XR2 to Prevent Masking Other Alarms, Revision 0
- (18) EC 0000288156, Replace Obsolete Control Building Chiller Temperature Controllers (TC6924A/B), Revision 2
- (19) EC 0000288815, Diesel Air Compressor Back-Up to Plant Air System, Revision 0
- (20) EC 0000289081, Revise CAL-M91-014 To Be in Compliance with ANSI 195-1976, Section 5.4, Revision 1
- (21) EC 0000291031, Reconfigure Limit Switch (LS2219) Logic to Remove Automatic Opening of Solenoid Valve (SV2219), Revision 2
- (22) EC 0000291104, Replace Level Element (LE-3768) with Longer Length Level Element, Revision 3
- (23) Procedure Change Request (PCR 02073808), Annunciator Response Procedure ARP-1C22 Hydrogen/Oxygen Control Panel, Revision 40
- (24) Procedure Change Request (PCR 02102503), Abnormal Operating Procedure AOP-903 Severe Weather, Revision 55
- (25) Procedure Change Request (PCR 02266292), Operating Instruction OI 878.1 - Source Range Neutron Monitoring System, Revision 21
- (26) Procedure Change Request (PCR 02268679), Annunciator Response Procedure ARP-1C22 Hydrogen/Oxygen Control Panel, Revision 42
- (27) UFSAR Change Request (UCR#: 2016-007), Revise Discussion Regarding Location of Steam Leak Detection Temperature Elements, Revision 24
- (28) UFSAR Change Request (UCR#: 2019-007), Revise Main Steam Line Isolation Valve Position Indication Description, August 22,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
- On December 5, 2019, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Dean Curtland and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.17T Calculations CAL-E98-004 Setpoint Calculation High Reactor Vessel Level, HPCI, 2
RCIC, Feedwater, and Turbine Trip in Remote Shutdown -
LS4540
CAL-MC-138 Diesel Oil Storage Tank Level Switch 3
CAL-R17-002 Dose Rate Evaluation of Reactor Vessel Water Levels 0
During Refueling for EAL Thresholds
Corrective Action AR 01988025 NRC CGD [Commercial Grade Dedication] Inspection Issue 06/22/2015
Documents of Third Party Dedication
AR 02100600 NRC Questions on Use of [Recurring-Use Temporary 02/03/2016
Modification] RTM-04-OI151
AR 02102327 2016 50.59: Eval of Portable Heaters During Severe 08/08/2016
Weather
AR 02102503 AOP 903 - Severe Weather 01/14/2016
AR 02102754 2016 50.59: Water Temperature Input to Mark I Analysis 02/22/2016
AR 02103084 2016 50.59: Inspection Identified Inadequate 50.59 01/26/2016
Screening
AR 02115464 RCIC Room Steam Leak Detection Not Consistent with CLB 10/02/2016
[Current Licensing Basis]
AR 02138974 T.S. Bases Change Request: B3.3.6.1 12/14/2016
AR 02138981 UFSAR Change Request: Chapter 7 10/12/2016
AR 02139054 Evaluate Process Utilized to Move STP 3.5.1-03A/B to 09/23/2016
Online
AR 02175375 Power System Stabilizer 50.59 01/18/2017
AR 02332637 2019 NRC 50.59/Mod Pre-Inspection Identified Items 10/24/2019
AR-LIC 2138981 DAEC UFSAR Chapter 7 06/20/2016
PCR 02073808 Annunciator Response Procedure ARP-1C22 40
Hydrogen/Oxygen Control Panel
PCR 02090816 Bases-ATWS (Anticipated Transient Without Scram) 19
PCR 02102503 AOP 903 Severe Weather, Revision 55 01/14/2016
PCR 02225747 AOP 302.1 - Loss of 125 Vdc Power 58
PCR 02259266 Biennial Review - ATWS - RPV Control, 0
PCR 02266292 OI 878.1 - Source Range Neutron Monitoring System 21
Inspection Type Designation Description or Title Revision or
Procedure Date
PCR 02268679 Annunciator Response Procedure ARP 1C22 - 42
Hydrogen/Oxygen Control Panel
PCR 02307806 AOP 302.1 - Loss of 125 Vdc Power 60
Corrective Action AR 02337533 50.59 Screening for EC 290224 12/05/2019
Documents
Resulting from
Inspection
Engineering CA 02102327-01 Placement of Portable Heaters in the MG [Motor Generator] 07/01/2016
Changes Set Room
EC 0000156026 Replace Existing Reactor Feedwater Pumps (RFP) and 43
Motors with RFP and Motors of Larger Capacity
EC 0000283115 FIC2309 Replacement Siemens 353 Controller from Design 1
Level A to B
EC 0000283472 Fukushima Spent Fuel Pool Level Instrumentation 6
EC 0000283785 SBGT 1V-SGT-1A\B Flow Ind Controller Replacement 2
Siemens 353 Controller from Design Level A to B
FIC5828A/B
EC 0000283960 Raise All Level Setpoint for LS3701 to Allow Pump Starts 0
Due to Sticking LE3701 Float at Lowest Level
EC 0000285459 Connect Diesel Air Compressor to Plant Air System 0
EC 0000285499 CAL-E95-015 Calibration Frequency Revision 1
EC 0000285928 PLC 1701C Replacement 1
EC 0000286670 1K001-M Compressor Motor Overload Trip Jumper-ed Out 1
(Bypassed)
EC 0000287838 Revise TE4403 Setpoint on TR4400 to Provide Annunciation 0
with Temperature Rise
EC 0000287965 Disable XR2 Low Oil Level Alarm to Prevent Masking Other 0
Alarms
EC 0000287997 RHR [Residual Heat Removal] Discharge Header Pressure 1
Switch Setpoint
EC 0000288156 TC6924A/B Control Building Chiller Temperature Controller 2
Siemens 353 Controller from Design Level A to B
EC 0000288815 Diesel Air Compressor Back-Up to Plant Air System 0
EC 0000289081 Revise CAL-M91-014 To Be in Compliance with 1
Inspection Type Designation Description or Title Revision or
Procedure Date
ANSI 195-1976, Section 5.4
EC 0000291031 Reconfigure LS2219 Logic to Remove Automatic Opening of 2
SV2219
EC 0000291104 Replace LE-3768 with Longer Length Level Element 3
Engineering ACE 01949946 2016 50.59: Eval of Portable Heaters During Severe 02/16/2016
Evaluations Weather
EC 0000281703 Chromalox Replacement Project 0
EC 0000282458 RWS Cable Replacement 0
EC 0000287931 Implementation of Revised Calculations for LOCA Dose 0
Consequences
Miscellaneous IP 71111.17T Evaluations of Changes, Tests, and Experiments 01/01/2017
NEI 96-07 Guidelines for 10 CFR 50.59 Implementation 1
UCR #: 2016-007 Revise Discussion Regarding Location of Steam Leak 24
Detection Temperature Elements
UCR #: 2019-007 Revise MSIV [Main Steam Line Isolation Valve] Position 08/22/2019
Indication Description
Procedures EN-AA-203-1100 Engineering Evaluations 13
EN-AA-203-1201 10 CFR Applicability and 5059 Screen Reviews 17
EN-AA-203-1202 10 CFR 5059 Evaluation 3
EN-AA-205-1102 Temporary Configuration Changes 15
Self-Assessments AR 02276319 50.59/Modification Pre-Inspection Assessment 12/02/2019
through
2/06/2019
PDA 19-001 Duane Arnold Nuclear Assessment Report - Engineering 03/28/2019
7