Letter Sequence Other |
---|
TAC:MD2107, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil (Approved, Closed) |
|
MONTHYEARML0615101992006-05-30030 May 2006 Proposed Technical Specifications Change Diesel Fuel Oil Testing Program Project stage: Request ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change Project stage: Other ML0629204442006-10-26026 October 2006 Safety Evaluation Input for North Anna License Amendment to Adopt TSTF-374 as Part of the Consolidated Line Item Improvement Process (CLIIP) Project stage: Approval ML0634502592006-12-11011 December 2006 Tech Spec Pages for Amendments 249 and 229 Regarding Diesel Fuel Oil Testing Program Project stage: Other ML0634003072006-12-11011 December 2006 License Amendments 249 and 229 Regarding Diesel Fuel Oil Testing Program Project stage: Other ML0702202192007-01-19019 January 2007 Technical Specifications Corrected Page for Amendment Nos. 249 and 229 Project stage: Other ML0701803392007-01-19019 January 2007 Power Station, Unit Nos. 1 and 2, Corrected Page for Amendment Nos. 249 and 229 Project stage: Other 2006-05-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection ML24082A2742024-03-22022 March 2024 Request for Approval of Alternative Request N1-I5-NDE-007 to Deter Additional Required Reactor Coolant Pump Casing Inspection ML24086A4682024-03-21021 March 2024 Summary of Facility Changes, Tests and Experiments ML24005A0042024-03-18018 March 2024 Issuance of Amendment Nos. 296 and 279, Regarding Revised Emergency Plan for Relocation of the Technical Support Center 2024-09-24
[Table view] Category:Technical Specification
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML22303A0192022-10-0909 October 2022 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21252A5142021-09-0909 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Rev 1, Using the Consolidated Line Item Improvement Process ML18198A1182018-07-12012 July 2018 Transmittal of Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Small Break Loss of Coolant Accident (SBLOCA) ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) ML17291A3362017-10-12012 October 2017 Technical Specification Bases Changes ML17291A3252017-10-12012 October 2017 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d ML16288A1202016-10-0404 October 2016 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML16288A1412016-10-0404 October 2016 Technical Specification Bases ML15289A3892015-10-0202 October 2015 Technical Specification Bases ML13302B8932013-10-0202 October 2013 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML12321A1042012-10-0505 October 2012 Technical Specifications Bases ML11298A2162011-10-0808 October 2011 Technical Specifications Bases ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029402882010-10-0909 October 2010 Technical Specifications Bases Changes ML1012605172010-05-0606 May 2010 Proposed License Amendments and Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML0929403352009-10-0909 October 2009 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.d ML0929405932009-10-0909 October 2009 Technical Specifications Bases, Revision 41 ML0927304682009-09-28028 September 2009 Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0902102792009-01-15015 January 2009 Proposed License Amendment Request TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0835309822008-12-17017 December 2008 Proposed License Amendment Request Adoption of TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to RCS Specific Activity Using the Consolidated Line Item Improvement Process ML0808003642008-03-19019 March 2008 Proposed License Amendment Request Deletion of TS 3.7.13 - Main Control Room/Emergency Switchgear Room Bottled Air System from Technical Specifications ML0707406732007-03-13013 March 2007 Units, 1 and 2, Tech Spec Pages for Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191 ML0628501952006-10-0303 October 2006 Proposed Technical Specification Change and Supporting Safety Analyses Revisions to Address Generic Safety Issue 191 ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change ML0614300622006-05-22022 May 2006 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0530800502005-11-0303 November 2005 Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a ML0529103882005-10-12012 October 2005 Technical Specification Bases Changes ML0508901012005-03-22022 March 2005 Tech Spec Pages for Amendments 238 & 219 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0429300512004-10-12012 October 2004 Technical Specifications Bases for North Anna Units 1 & 2 ML0426002902004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0419502772004-07-0101 July 2004 Proposed Technical Specifications Change Request Reactor Coolant System Pressure/Temperature Limits Ltops Setpoints and Ltops Enable Temperatures ML0414001142004-05-12012 May 2004 Tech Spec Page for Amendments 235 & 217 Regarding Extended Inverter Allowed Outage Time ML0409800302004-03-30030 March 2004 Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal ML0407106842004-03-0404 March 2004 Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot ML0326708212003-09-12012 September 2003 Proposed Technical Specification Changes Implementation of Alternative Source Term ML0316814212003-06-11011 June 2003 Proposed TS Changes Use of Realistic LBLOCA & Small Break LOCA Methodology for Analysis of Framatome Advanced Mark-BW Fuel ML0314101032003-05-0909 May 2003 Technical Specification Bases Changes ML0232504192002-11-14014 November 2002 Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214 ML0224601552002-08-20020 August 2002 Technical Specification Bases Changes ML0207803972002-03-18018 March 2002 Correction & Clarification to Facility Operating License Amendment No. 230 ML0207003112002-02-22022 February 2002 Part 3 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Technical Specific ML0207002822002-02-22022 February 2002 Part 2 of 10, North Anna Power Station, Units 1 & 2, Proposed Imposed Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Bases ML0207002312002-02-22022 February 2002 Part 1 of 10, North Anna Power Station, Units 1 & 2 Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions 2024-10-09
[Table view] Category:Bases Change
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML22303A0192022-10-0909 October 2022 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML17291A3362017-10-12012 October 2017 Technical Specification Bases Changes ML17291A3252017-10-12012 October 2017 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d ML16288A1202016-10-0404 October 2016 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML16288A1412016-10-0404 October 2016 Technical Specification Bases ML15289A3892015-10-0202 October 2015 Technical Specification Bases ML13302B8932013-10-0202 October 2013 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML12321A1042012-10-0505 October 2012 Technical Specifications Bases ML11298A2162011-10-0808 October 2011 Technical Specifications Bases ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029402882010-10-0909 October 2010 Technical Specifications Bases Changes ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML0929403352009-10-0909 October 2009 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.d ML0929405932009-10-0909 October 2009 Technical Specifications Bases, Revision 41 ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change ML0614300622006-05-22022 May 2006 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0530800502005-11-0303 November 2005 Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a ML0529103882005-10-12012 October 2005 Technical Specification Bases Changes ML0429300512004-10-12012 October 2004 Technical Specifications Bases for North Anna Units 1 & 2 ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0409800302004-03-30030 March 2004 Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal ML0407106842004-03-0404 March 2004 Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot ML0314101032003-05-0909 May 2003 Technical Specification Bases Changes ML0232504192002-11-14014 November 2002 Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214 ML0224601552002-08-20020 August 2002 Technical Specification Bases Changes 2024-10-09
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 June 3 0 , 2006 U.S. Nuclear Regulatory Commission Serial No. 06-3208 Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 NORTH ANNA POWER STATION UNITS 1 AND 2 TECHNICAL SPECIFICATIONS BASES CHANGE FOR DIESEL FUEL OIL TESTING PROGRAM TECHNICAL SPECIFICATION CHANGE In a May 8, 2006 letter (Serial No.06-320) Virginia Electric and Power Company (Dominion) requested amendments, in the form of a change to the Technical Specifications (TS) to Facility Operating License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. The proposed change relocates the ASTM standard being used to test the total particulate concentration of the stored fuel oil to a licensee-controlled program. This change is consistent with the intent of Technical Specifications Task Force (TSTF) Traveler 374-A, Rev 0, "Revision to TS 5.5.13 and Associated Bases for Diesel Fuel Oil." In the May 8, 2006 submittal, Dominion1 stated that the testing standard would be incorporated into the TS Bases upon NRC's approval of the proposed amendment.
In a June 12, 2006 conference call, the NRC staff requested that Dominion provide the marked-up and typed Bases pages for their review. Accordingly, attached for your information are the associated Bases changes for the proposed Technical Specification change. In addition to relocating the testing standard for total particulate concentration to the Bases, Dominion intends to also update the testing standard, as recommended by the ASTM Technical Committee D02, to ASTM D6217-98.
If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.
Very truly yours,
& & d &
William R. Matthews Senior Vice President - Nuclear Operations Attachments
- 1. Mark-up of Unit 1 and Unit 2 Technical Specifications Bases Changes
- 2. Typed Unit 1 and Unit 2 Technical Specifications Bases Changes Commitrr~entsmade in this letter: None
06-3208 Docket Nos. 50-3381339 Page 2 of 3 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. Stephen R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rackville, Maryland 20852 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative lnrlsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 Calmmissioner Bureau of Radiological Health 15100 East Main Street Suite 240 Richmond, Virginia 23218
06-3208 Docket Nos. 50-3381339 Page 3 of 3 COMMONWEALTH OF VIRGINIA )
1 COUNTY OF HENRICO 1 The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by William R. Matthews, who is Senior Vice President
- Nuclear Operations, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 30" day of 9- ,2006.
My Commission Expires: 3!, 2008 .
(SEAL)
06-3208 Docket Nos. 50-3381339 Attachment 1 Mark-up of Unit 1 and Unit 2 Technical Specifications Bases Changes North Anna Power Station Units 1 and 2 Virginia Electric and Power Company (Dominion)
Diesel Fuel Oil and Starting Air B 3.8.3 SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides veri f i cation t h a t there i s an adequate inventory of fuel o i l i n the storage tanks t o support two EDGs ' operation f o r 7 days a t f u l l load. The 7 day period i s s u f f i c i e n t time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsi t e location.
The 31 day Frequency i s adequate to ensure that a sufficient supply o f fuel oil i s available, since low level alarms are provided and unit operators would be aware of any large uses of fuel oi 1 during t h i s period.
The t e s t s 1i sted below are a means of determining whether new fuel oi 1 i s of the appropriate grade and has not been contaminated with substances that would have an immediate, detrimental impact on diesel engine combustion. I f r e s u l t s from these t e s t s are w i t h i n acceptable limits, the fuel o i l may be added to the storage tanks without concern f o r contaminating the entire volume of fuel oil in the storage tanks. These t e s t s are t o be conducted prior to adding the new fuel to the storage tank(s), b u t in no case i s the time between receipt of new fuel and conducting the t e s t s t o exceed 31 days. The t e s t s , 1 imi t s , and applicable ASTM Standards are as follows:
- a. Sample the new fuel oil i n accordance with ASTM D4057-88 (Ref. 6);
- b. Verify in accordance with the t e s t s specified i n ASTM 5
D975-89 (Ref. 6) that the sample has an absolute specific gravity a t 60/60°F of 2 0.83 and 5 0.89 o r an API gravity a t 60°F of 2 27" and I 39" a kinematic viscosity a t 40°C point of 2 125°F; and C of Z 1.9 centistokes and 5 4.1 centistokes, and a flash
~U~ER2 T
- c. Verify that the new fuel o i l i s checked f o r water and i r L l I (cont i nued)
North Anna Units 1 and 2 B 3.8.3-6 Revi si on
Diesel Fuel Oi 1 and Starting Air B 3.8.3 SURVEILLANCE SR 3.8.3.2 (continued)
REOU I REMENTS Failure t o meet any of the above limits i s cause for rejecting the new fuel o i l , b u t does not represent a fai 1ure t o meet the LC0 concern since the fuel oil i s not added t o the storage tanks.
Within 31 days following the i n i t i a l new fuel oil sample, the fuel oil i s analyzed to establish that the other properties speci f i ed in Tab1 e 1 of ASTM D975-89 (Ref. 7) are met f o r new fuel oi 1 when tested in accordance w i t h ASTM D975-89 (Ref. 6), except that the analysis for su1 fur may be performed i n accordance with ASTM D4294-98 (Ref. 6 ) ,
ASTM D1552-88 (Ref. 6) or ASTM D2622-82 (Ref. 6). The 31 day period i s acceptable because the fuel o i l properties of i n t e r e s t , even i f they were not w i t h i n stated limits, would not have an immediate effect on EDG operation. This Survei 11ance ensures the avai 1abi 1i t y of high qua1 i t y fuel o i l f o r the EDGs.
Fuel oil degradation during long term storage shows up as an increase in particulate, due mostly t o oxidation. The presence of particulate does not mean the fuel oil will not
.burn properly in a diesel engine. The particulate can cause fouling of f i l t e r s and fuel o i l injection equipment, however, which can cause engine f a i 1ure.
B62t7 -98 Parti cul a t e concentrations should be determi ned i n accordance w i t h ASTM -BE!%% 9 3 , -~=6s method involves a gravimetri c determination of total I
particulate concentration i n the fuel o i l and has a limit of 10 mg/l. I t i s acceptable t o obtain a fie1 d sample f o r subsequent laboratory testing i n l i e u of f i e l d testing. Each tank i s considered and tested separately.
The Frequency of this t e s t takes into consideration fuel o i l degradation trends that indicate t h a t parti cul a t e concentration i s unlikely t o change significantly between Frequency interval s.
Thi s Survei 1lance ensures t h a t , without the aid of the r e f i 11 compressor, sufficient a i r s t a r t capacity f o r each EDG i s available. The system design requirements were verified f o r a minimum of f i v e engine s t a r t cycles without recharging. A s t a r t cycle i s measured i n terms of time (cont i nued)
North Anna Units 1 and 2 B 3.8.3-7 Revision
Diesel Fuel O i 1 and S t a r t i n g Air B 3.8.3 BASES REFERENCES - 1 (continued) ws(iR1 5
- 7. ASTM Standards, D975, Table 1, 1989.
North Anna U n i t s 1 and 2 Revi s i on 7
Inserts EDG Fuel Oil Bases Changes per TSTF-374-A Rev 0 lnsert 'I or a water and sediment content within limits Not used - previously incorporated lnsert 2
... whein tested in accordance with ASTM D287-82 (Ref. 6) lnsert 3
... content within limits when tested in accordance with ASTM D1796-83 (Ref. 6) lnsert 4
, or ASTM D4294-98 Not used - previously incorporated lnsert 5 ASTM Standards: D4057-88; D975-89; D l522-88; D2622-82; D2276-82; D4292-98;D6217-98; D287-82; Dl 796-83.
These isre the inserts recommended in TSTF-374-A Rev 0 as modified to include the current testing standards used at North Anna.
Inserts 1 and 4 are not used since both the water and sediment test method and ASTM D4294-98 have been previously included in the EDG Fuel Oil Testing Program and associated TS Bases.
06-3208 Docket Nos. 50-3381339 Attachment 2
'Typed Unit 1 and Unit 2 Technical Specifications Bases Changes North Anna Power Station Units 1 and 2 Virginia Electric and Power Company (Dominion)
Diesel Fuel O i l and S t a r t i n g A i r B 3.8.3 BASES SURVE l LLANCE SR 3.8.3.1 REQUIREMENTS This SR provides v e r i f i c a t i o n t h a t there i s an adequate inventory o f f u e l oi l i n t h e storage tanks t o support two EDGs' operation f o r 7 days a t f u l l load. The 7 day period i s s u f f i c i e n t time t o place t h e u n i t i n a safe shutdown condition and t o b r i ng i n rep1eni shment f u e l from an o f f s i t e l ocat i on.
The 31 day Frequency i s adequate t o ensure t h a t a s u f f i c i e n t supply o f fuel o i l i s avai lable, since low level alarms are provided and u n i t operators would be aware o f any large uses o f fuel o i l during t h i s period.
The t e s t s I i sted be1ow are a means o f determi n i ng whether new f u e l oi l i s o f t h e appropriate grade and has not been contam i nated w i t h substances t h a t wou l d have an i mmed i ate, d e t r i menta l i mpact on d i ese l eng i ne combust i on. I f resu l t s from these t e s t s are w i t h i n acceptable l i m i t s , t h e fuel o i l may be added t o the storage tanks without concern f o r contaminating t h e e n t i r e volume o f f u e l o i l i n t h e storage tanks. These t e s t s are t o be conducted p r i o r t o adding t h e new f u e l t o t h e storage tank(s), but i n no case i s t h e time between r e c e i p t o f new f u e l and conducting t h e t e s t s t o exceed 31 days. The tests, l i m i t s , and app l i cab l e ASTM Standards are as f o l lows:
- a. Samp l e t h e new fuel o i l i n accordance w i t h ASTM D4057-88 (Ref. 6) ;
b . V e r i f y i n accordance w i t h the t e s t s specified i n ASTM D975-89 (Ref. 6) t h a t t h e sample has an absolute speci f i c gravi t y a t 60/60°F o f 2 0.83 and 5 0.89 o r an AP I gravi t y a t 60°F o f 2 27" and I39" when tested i n accordance w i t h ASTM D287-82 (Ref. 6) , a k i nemat i c v i scos it y a t 40°C o f 2 1.9 centistokes and 5 4 . 1 centistokes, and a f l a s h p o i n t o f 2 125°F; and c . V e r i f y t h a t t h e new f u e l oi l i s checked f o r water and sediment content w i t h i n l i m i t s when tested i n accordance w i t h ASTM D l 796-83 (Ref. 6) .
(cont i nued)
North Anna Units I and 2 B 3.8.3-6
Diesel Fuel O i l and S t a r t i n g A i r B 3.8.3 BASES SURVE l LLANCE SR 3.8.3.2 (cont i nued)
REQU l REMENTS Fa i l ure t o meet any o f the above l i m i t s i s cause f o r r e j e c t i ng the new fuel o i l , but does not represent a f a i l ure t o meet t h e LC0 concern since t h e f u e l oi l i s not added t o the storage tanks.
Within 31 days f o l lowing the i n i t i a l new fuel o i l sample, t h e fuel o i l i s analyzed t o establish t h a t t h e other properties specified i n Table 1 o f ASTM D975-89 (Ref. 7) are met f o r new fuel o i l when tested i n accordance w i t h ASTM D975-89 (Ref. 6) , except t h a t t h e anal ys is f o r su l f u r may be performed i n accordance w i t h ASTM D4294-98 (Ref. 6),
ASTM D1552-88 (Ref. 6) o r ASTM D2622-82 (Ref. 6 ) . The 31 day period i s acceptable because t h e f u e l o i l properties o f i nterest, even i f they were not w i t h i n stated l i m it s , would n o t have an immed i ate e f f e c t on EDG operat i on. Th i s Survei l l ance ensures t h e ava i l ab i l i t y o f h i gh qua l i t y f u e l o i l f o r the EDGs.
Fuel oi l degradat i on dur i ng l ong term storage shows up as an i ncrease i n p a r t i cu l ate, due most ly t o ox i dat i on. The presence o f p a r t i c u l a t e does n o t mean t h e f u e l o i l w i l l not burn proper1y i n a diesel engine. The p a r t i c u l a t e can cause f o u l i n g o f f i l t e r s and fuel o i l i n j e c t i o n equipment, however, wh i ch can cause eng i ne f a i l ure .
Part i cu l ate concentrat i ons shou l d be determ i ned i n accordance w i t h ASTM D6217-98 (Ref. 6) . Th i s method i nvo l ves I a gravimetric determination o f t o t a l p a r t i c u l a t e concentration i n the fuel o i l and has a l i m i t o f 10 mg/l. I t i s acceptabl e t o obta i n a f i e l d samp l e f o r subsequent laboratory t e s t i n g i n l i e u o f f i e l d t e s t i n g . Each tank i s considered and tested separately.
The Frequency o f t h i s t e s t takes i n t o consideration f u e l o i l degradation trends t h a t indicate t h a t p a r t i c u l a t e concentration i s u n l i k e l y t o change s i g n i f i c a n t l y between Frequency i nterva l s.
This Surveillance ensures t h a t , without t h e a i d o f t h e r e f i l l compressor, s u f f i c i ent a i r s t a r t capacity f o r each EDG i s available. The system design requirements were v e r i f i e d f o r a minimum o f f i v e engine s t a r t cycles without recharging. A s t a r t cycle i s measured i n terms o f time (cont i nued)
North Anna Units 1 and 2 B 3.8.3-7
Diesel Fuel O i l and S t a r t i n g A i r B 3.8.3 BASES REFERENCES 6 . ASTM Standards: D4057-88; D975-89 ; D1522-88; D2622-82; (cont i nued) D2276-82; D4292-98; D6217-98; D287-82; D l 796-83. I 7 . ASTM Standards, D975, Table 1, 1989.
North Anna Units 1 and 2 B 3.8.3-9