|
---|
Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] Category:Technical Specification
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML22303A0192022-10-0909 October 2022 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21252A5142021-09-0909 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Rev 1, Using the Consolidated Line Item Improvement Process ML18198A1182018-07-12012 July 2018 Transmittal of Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Small Break Loss of Coolant Accident (SBLOCA) ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) ML17291A3362017-10-12012 October 2017 Technical Specification Bases Changes ML17291A3252017-10-12012 October 2017 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d ML16288A1202016-10-0404 October 2016 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML16288A1412016-10-0404 October 2016 Technical Specification Bases ML15289A3892015-10-0202 October 2015 Technical Specification Bases ML13302B8932013-10-0202 October 2013 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML12321A1042012-10-0505 October 2012 Technical Specifications Bases ML11298A2162011-10-0808 October 2011 Technical Specifications Bases ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029402882010-10-0909 October 2010 Technical Specifications Bases Changes ML1012605172010-05-0606 May 2010 Proposed License Amendments and Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML0929403352009-10-0909 October 2009 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.d ML0929405932009-10-0909 October 2009 Technical Specifications Bases, Revision 41 ML0927304682009-09-28028 September 2009 Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0902102792009-01-15015 January 2009 Proposed License Amendment Request TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0835309822008-12-17017 December 2008 Proposed License Amendment Request Adoption of TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to RCS Specific Activity Using the Consolidated Line Item Improvement Process ML0808003642008-03-19019 March 2008 Proposed License Amendment Request Deletion of TS 3.7.13 - Main Control Room/Emergency Switchgear Room Bottled Air System from Technical Specifications ML0707406732007-03-13013 March 2007 Units, 1 and 2, Tech Spec Pages for Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191 ML0628501952006-10-0303 October 2006 Proposed Technical Specification Change and Supporting Safety Analyses Revisions to Address Generic Safety Issue 191 ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change ML0614300622006-05-22022 May 2006 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0530800502005-11-0303 November 2005 Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a ML0529103882005-10-12012 October 2005 Technical Specification Bases Changes ML0508901012005-03-22022 March 2005 Tech Spec Pages for Amendments 238 & 219 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0429300512004-10-12012 October 2004 Technical Specifications Bases for North Anna Units 1 & 2 ML0426002902004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0419502772004-07-0101 July 2004 Proposed Technical Specifications Change Request Reactor Coolant System Pressure/Temperature Limits Ltops Setpoints and Ltops Enable Temperatures ML0414001142004-05-12012 May 2004 Tech Spec Page for Amendments 235 & 217 Regarding Extended Inverter Allowed Outage Time ML0409800302004-03-30030 March 2004 Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal ML0407106842004-03-0404 March 2004 Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot ML0326708212003-09-12012 September 2003 Proposed Technical Specification Changes Implementation of Alternative Source Term ML0316814212003-06-11011 June 2003 Proposed TS Changes Use of Realistic LBLOCA & Small Break LOCA Methodology for Analysis of Framatome Advanced Mark-BW Fuel ML0314101032003-05-0909 May 2003 Technical Specification Bases Changes ML0232504192002-11-14014 November 2002 Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214 ML0224601552002-08-20020 August 2002 Technical Specification Bases Changes ML0207803972002-03-18018 March 2002 Correction & Clarification to Facility Operating License Amendment No. 230 ML0207003112002-02-22022 February 2002 Part 3 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Technical Specific ML0207002822002-02-22022 February 2002 Part 2 of 10, North Anna Power Station, Units 1 & 2, Proposed Imposed Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Bases ML0207002312002-02-22022 February 2002 Part 1 of 10, North Anna Power Station, Units 1 & 2 Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions 2024-10-09
[Table view] Category:Bases Change
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML22303A0192022-10-0909 October 2022 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML17291A3362017-10-12012 October 2017 Technical Specification Bases Changes ML17291A3252017-10-12012 October 2017 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d ML16288A1202016-10-0404 October 2016 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML16288A1412016-10-0404 October 2016 Technical Specification Bases ML15289A3892015-10-0202 October 2015 Technical Specification Bases ML13302B8932013-10-0202 October 2013 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML12321A1042012-10-0505 October 2012 Technical Specifications Bases ML11298A2162011-10-0808 October 2011 Technical Specifications Bases ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029402882010-10-0909 October 2010 Technical Specifications Bases Changes ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML0929403352009-10-0909 October 2009 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.d ML0929405932009-10-0909 October 2009 Technical Specifications Bases, Revision 41 ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change ML0614300622006-05-22022 May 2006 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0530800502005-11-0303 November 2005 Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a ML0529103882005-10-12012 October 2005 Technical Specification Bases Changes ML0429300512004-10-12012 October 2004 Technical Specifications Bases for North Anna Units 1 & 2 ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0409800302004-03-30030 March 2004 Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal ML0407106842004-03-0404 March 2004 Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot ML0314101032003-05-0909 May 2003 Technical Specification Bases Changes ML0232504192002-11-14014 November 2002 Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214 ML0224601552002-08-20020 August 2002 Technical Specification Bases Changes 2024-10-09
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 4, 2016 U.S. Nuclear Regulatory Commission Serial No.16-324 Attention: Document Control Desk NAPS/JHL RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL SUBMITTAL OF TECHNICAL SPECIFICATION BASES CHANGES PURSUANT TO TECHNICAL SPECIFICATION 5.5.13.d Pursuant to Technical Specification 5.5.13.d, "Technical Specifications (TS) Bases Control Program," Dominion hereby submits the changes to the Bases of the Technical Specifications implemented during the period of October 1, 2015 through September 30, 2016. A summary of these changes is provided in Attachments 1 and 2. Enclosed is an electronic copy (CD) of the entire TS Bases through Revision 60 for your information.
Bases changes to the Technical Specifications that were not previously submitted to the NRC as part of a License Amendment Request were reviewed and approved by the Facility Safety Review Committee. It was determined that these changes did not require a change to the Technical Specifications or license, or involve a change to the UFSAR or Bases that required NRC prior approval pursuant to 10CFR50.59. These changes have* been incorporated into the TS Bases. A summary of these Bases changes is provided in Attachment 1.
TS Bases changes that were submitted to the NRC for information along with the associated License Amendment Request transmittals, submitted pursuant to 10CFR50.90, were also reviewed* and approved by the Facility Safety Review Committee. These changes have been implemented with the respective License Amendments. A summary of these changes is provided in Attachment 2.
If you have any questions regarding this submittal,' ple~se contact Mr. Donald R. Taylor at (540) 894-2100.
Sincerely, L. A. Hilbert Director, Nuclear Safety and Licensing
Attachments
- 1. Summary of TS Bases Changes Not Previously Submitted to the NRC
- 2. Summary of TS Bases Changes Associated with License Amendments Enclosure - CD qf Current TS Bases (Revision 60)
Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Region II
- Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. J. E. Reasor, Jr. (without Enclosure)
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 State Health Commissioner (without Enclosure)
Virginia Department of Health James Madison Building - y!h Floor 109 Governor Street Room 730 Richmond, Virginia 23219 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 G-9A Rockville, Maryland 20852-2738 Ms. K. R. Cotton NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 G-9A Rockville, Maryland 20852-2738 NRC Senior Resident Inspector (without Enclosure)
North Anna Power Station
ATTACHMENT 1
SUMMARY
OF TS BASES CHANGES NOT PREVIOUSLY SUBMITTED TO THE NRC VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2
SUMMARY
OF TS BASES CHANGES NOT PREVIOUSLY SUBMITTED TO THE NRC Revision of Technical Specification Bases 3.9.3 The change revised the Bases of Technical Specification (TS) 3.9.3, Nuclear Instrumentation, to remove a statement regarding the source range nuclear instrumentation capability. The Applicable Safety Analyses section indicates, in part, that the source range neutron flux monitors can detect an improperly loaded fuel assembly. The ex-core source range instrumentation cannot detect a single misloaded fuel assembly due to the small reactivity change. The change deletes the phrase "or an improperly loaded fuel assembly" from the Bases of TS 3.9.3.
Revision of Technical Specification Bases 3.7.8 The change revised the Bases of Technical Specification (TS) 3.7.8, Service Water (SW) System, to clarify the Limiting Condition for Operation (LCO) that a SW loop is OPERABLE during Modes 1, 2, 3, and 4 when two spray arrays are OPERABLE in an OPERABLE flow path and the spray valves for the required OPERABLE spray arrays are secured in the accident position and power removed from the valve operators. The TS Bases previously required that two spray arrays are OPERABLE in the other loop and that the spray valves for the required OPERABLE spray arrays in both loops are secured in the accident position and power removed from the valve operators.
Design Changes Packages (DCPs)02-175 and 02-176, Service Water Spray Array SI Signal Actuation Cross-Tie Modifications were previously implemented to modify the Service Water System. These DCPs modified the service water pump start, service water pump manual trip block circuit, and spray array MOVs such that each component receives an additional same unit, opposite train SI signal. The physical condition of the post modification plant is that equipment will receive a SI signal from the respective train (existing), a second SI signal from the respective train, opposite unit (existing) and a third SI signal from the opposite train, same unit (new). These changes eliminated the conditions that required protection for a single active failure of the actuation circuitry. The DCPs included some changes to the Bases of TS 3.7.8. However, with the elimination of the single active failure of the actuation circuitry, the Bases should have been revised to delete the requirement to have two spray arrays OPERABLE in the other loop and the spray valves in both loops be secured in the accident position and power removed from the valve operators.
Revision of Technical Specification Bases 3.2.1 The change revised the Bases of Technical Specification (TS) 3.2.1, Heat Flux Hot Channel Factor (Fa(z)), to decrease the upper and lower core exclusion zones for Fa surveillance to ensure peak F0 (z) locations are evaluated.
The TS Bases for Surveillance Requirement (SR) 3.2.1.1 previously stated that the upper and lower 15% of the core are not applicable for surveillance of Fa. The reason for this was that historically the chances of the limiting Fa margin occurring in the top and bottom of the core was low and accurate measurements in those regions are more difficult. However, operating experience identified the location of a peak steady state Fa was found in the exclusion region. Therefore, the Bases of SR 3.2.1.1 was revised to: 1) update the lower core not applicable region from "O to 15%" to "O to 8%" and update the upper core not applicable region from "85 to 100%" to "92 to 100%", and 2) update the top and bottom core exclusion region from 15% to 8% and add a reference for the value.
- Revision of Technical Specification Bases 3.1.9 The change revised the Bases of Technical Specification (TS) 3.1.9, Physics Tests Exceptions- Mode 2 to 1) change the description of the flux symmetry verification which would allow verification via direct or indirect measurement prior to exceeding 30% rated thermal power (RTP) (if a confirmatory indirect measurement of flux symmetry is attained then a direct power distribution may be deferred to less than or equal to 50% RTP, 2) change the reference for physics testing associated with a letter from Virginia Electric and Power Company to U.S. Nuclear Regulatory Commission,
. dated December 8, 1989 (Serial No.89-541) entitled, "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, North Anna Power Station Units 1 and 2, Modification Of Startup Physics Test Program* Inspector Follow-up Item 280, 281/88-29-01", to VEP-FRD-36, Rev. 0.3-A "Control Rod Reac~ivity Worth Determination by the Rod Swap Technique", and 3) change the startup physics testing standard from ANSl/ANS-19.6.1-1997 to ANSl/ANS-19.6.1-2011.
, * ' j ATTACHMENT 2
SUMMARY
OF TS BASES CHANGES ASSOCIATED WITH LICENSE AMENDMENTS VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2
1t ~I 'l
SUMMARY
OF TS BASES CHANGES ASSOCIATED WITH LICENSE AMENDMENTS Alternate Offsite Power Circuits Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.8 required that the manual transfer of Unit 1 Engineered Safety Feature (ESF) 4.16 kV AC power sources from the normal offsite circuit to the alternate required offsite circuit be verified in accordance with the Surveillance Frequency Control Program. Design Change (DC)
NA-13-00016 installed alternate offsite circuits to the Unit 2 ESF buses. Therefore, the surveillance requirement was revised to also apply fo Unit 2. TS Bases 3.8.1.1 Limiting Condition for Operation (LCO) was revised to discuss the station service buses that provide the alternate preferred feed to the specific emergency buses. TS Bases SRs 3.8.1.1 and 3.8.1.8 were revised to make the discussion of having a normal and alternate offsite source applicable to both Units 1 and 2, rather than to Unit 1, only. TS Bases 3.8.2 LCO was revised to discuss the alternate feed for the Unit 2 Emergency Bus 2H and 2J. TS Bases 3.8.3 Actions was revised to remove the discussion on the 4kV safeguards bus cross-tie. TS Bases 3.8.9 Background was revised to make the discussion of having a normal and alternate offsite source applicable to both Units 1 and 2.
- The Bases changes noted above were submitted to the NRC by Dominion submittal dated May 22, 2015 and incorporated into the Bases for North Anna Units 1 and 2 on March 18, 2016 upon NRC approval and implementation of the associated Technical Specification changes (Amendment 260 for Unit 2 issued on February 22, 2016).