ML041400114
| ML041400114 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/12/2004 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| TAC MB6957, TAC MB6958 | |
| Download: ML041400114 (1) | |
Text
Inverters-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters-Opirating LCO 3.8.7 The Train H and Train J inverters shall be OPERABLE.
- - - - - - - - - - - - NOTE- - - - - - - - - - - -
One inverter may be disconnected from its associated DC bus for S 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to perform an equalizing charge on its associated battery, provided:
- a. The associated AC vital bus is energized from its constant voltage source transformer; and
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One inverter A.1 ---------
NOTE--------
Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Operating" with any vital bus de-energized.
Restore inverter to 7 days OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I
North Anna Units 1 and 2 3.8.7-1 ASERSO 235/217