Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] Category:Technical Specification
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML22303A0192022-10-0909 October 2022 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21252A5142021-09-0909 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Rev 1, Using the Consolidated Line Item Improvement Process ML18198A1182018-07-12012 July 2018 Transmittal of Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Small Break Loss of Coolant Accident (SBLOCA) ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) ML17291A3362017-10-12012 October 2017 Technical Specification Bases Changes ML17291A3252017-10-12012 October 2017 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d ML16288A1202016-10-0404 October 2016 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML16288A1412016-10-0404 October 2016 Technical Specification Bases ML15289A3892015-10-0202 October 2015 Technical Specification Bases ML13302B8932013-10-0202 October 2013 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML12321A1042012-10-0505 October 2012 Technical Specifications Bases ML11298A2162011-10-0808 October 2011 Technical Specifications Bases ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029402882010-10-0909 October 2010 Technical Specifications Bases Changes ML1012605172010-05-0606 May 2010 Proposed License Amendments and Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML0929403352009-10-0909 October 2009 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.d ML0929405932009-10-0909 October 2009 Technical Specifications Bases, Revision 41 ML0927304682009-09-28028 September 2009 Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0902102792009-01-15015 January 2009 Proposed License Amendment Request TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0835309822008-12-17017 December 2008 Proposed License Amendment Request Adoption of TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to RCS Specific Activity Using the Consolidated Line Item Improvement Process ML0808003642008-03-19019 March 2008 Proposed License Amendment Request Deletion of TS 3.7.13 - Main Control Room/Emergency Switchgear Room Bottled Air System from Technical Specifications ML0707406732007-03-13013 March 2007 Units, 1 and 2, Tech Spec Pages for Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191 ML0628501952006-10-0303 October 2006 Proposed Technical Specification Change and Supporting Safety Analyses Revisions to Address Generic Safety Issue 191 ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change ML0614300622006-05-22022 May 2006 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0530800502005-11-0303 November 2005 Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a ML0529103882005-10-12012 October 2005 Technical Specification Bases Changes ML0508901012005-03-22022 March 2005 Tech Spec Pages for Amendments 238 & 219 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0429300512004-10-12012 October 2004 Technical Specifications Bases for North Anna Units 1 & 2 ML0426002902004-09-15015 September 2004 Proposed Technical Specifications Change Administrative Controls Changes ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0419502772004-07-0101 July 2004 Proposed Technical Specifications Change Request Reactor Coolant System Pressure/Temperature Limits Ltops Setpoints and Ltops Enable Temperatures ML0414001142004-05-12012 May 2004 Tech Spec Page for Amendments 235 & 217 Regarding Extended Inverter Allowed Outage Time ML0409800302004-03-30030 March 2004 Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal ML0407106842004-03-0404 March 2004 Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot ML0326708212003-09-12012 September 2003 Proposed Technical Specification Changes Implementation of Alternative Source Term ML0316814212003-06-11011 June 2003 Proposed TS Changes Use of Realistic LBLOCA & Small Break LOCA Methodology for Analysis of Framatome Advanced Mark-BW Fuel ML0314101032003-05-0909 May 2003 Technical Specification Bases Changes ML0232504192002-11-14014 November 2002 Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214 ML0224601552002-08-20020 August 2002 Technical Specification Bases Changes ML0207803972002-03-18018 March 2002 Correction & Clarification to Facility Operating License Amendment No. 230 ML0207003112002-02-22022 February 2002 Part 3 of 10, North Anna Power Station, Units 1 & 2, Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Technical Specific ML0207002822002-02-22022 February 2002 Part 2 of 10, North Anna Power Station, Units 1 & 2, Proposed Imposed Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions, Bases ML0207002312002-02-22022 February 2002 Part 1 of 10, North Anna Power Station, Units 1 & 2 Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions 2024-10-09
[Table view] Category:Bases Change
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML22303A0192022-10-0909 October 2022 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML17291A3362017-10-12012 October 2017 Technical Specification Bases Changes ML17291A3252017-10-12012 October 2017 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specifications 5.5.13.d ML16288A1202016-10-0404 October 2016 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d ML16288A1412016-10-0404 October 2016 Technical Specification Bases ML15289A3892015-10-0202 October 2015 Technical Specification Bases ML13302B8932013-10-0202 October 2013 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML12321A1042012-10-0505 October 2012 Technical Specifications Bases ML11298A2162011-10-0808 October 2011 Technical Specifications Bases ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029402882010-10-0909 October 2010 Technical Specifications Bases Changes ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML0929403352009-10-0909 October 2009 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 5.5.13.d ML0929405932009-10-0909 October 2009 Technical Specifications Bases, Revision 41 ML0618602252006-06-30030 June 2006 Technical Specifications Bases Change for Diesel Fuel Oil Testing Program Technical Specification Change ML0614300622006-05-22022 May 2006 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0530800502005-11-0303 November 2005 Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a ML0529103882005-10-12012 October 2005 Technical Specification Bases Changes ML0429300512004-10-12012 October 2004 Technical Specifications Bases for North Anna Units 1 & 2 ML0424401692004-08-30030 August 2004 Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement Process ML0409800302004-03-30030 March 2004 Proposed Technical Specification Changes Implementation of Alternate Source Term Request for Additional Information Containment Spray Systems Iodine Removal ML0407106842004-03-0404 March 2004 Proposed Technical Specification Changes Regarding Deletion of Note for Performance of Cot ML0314101032003-05-0909 May 2003 Technical Specification Bases Changes ML0232504192002-11-14014 November 2002 Correction to Technical Specifications Bases Page Issued with Amendments 232 & 214 ML0224601552002-08-20020 August 2002 Technical Specification Bases Changes 2024-10-09
[Table view] |
Text
- Dominion Virginia Power North Anna Power Station, 1022 Halcy Dr., Mincral, VA 23117 DominioW Wcb Addrcss: www.domxcom October 9, 2009 U.S. Nuclear Regulatory Commission Serial No.09-561 Attention: Document Control Desk NAPS-LIC/GSS RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS I AND 2 ANNUAL SUBMITTAL OF TECHNICAL SPECIFICATION BASES CHANGES PURSUANT TO TECHNICAL SPECIFICATION 5.5.13.d Pursuant to Technical Specifications 5.5.13.d, "Technical Specifications (TS) Bases Control Program," Dominion hereby submits the changes to the Bases of the Technical Specifications implemented during the period, of September 30, 2008 to October 1, 2009. A summary of these changes is provided in Attachments 1 and 2. Enclosed is an electronic copy (CD) of the entire TS Bases through Rev 41 for your information.
Bases changes to the Technical Specifications that were not previously submitted to the NRC as part of a License Amendment Request were reviewed and approved by the Facility Safety Review Committee. it was determined that these changes did not require a change to the Technical Specifications or license, or involve a change to the UFSAR or Bases that required NRC prior approval pursuant to 10 CFR 50.59. These changes have been incorporated into the TS Bases. A summary of these Bases changes is provided in Attachment 1.
TS Bases changes that were submitted to the NRC for information along with the associated License Amendment .Request transmittals, submitted pursuant to 10CFR50.90, were also reviewed and approved by the Facility Safety Review Committee. These changes have been implemented with the respective License Amendments. A summary of these changes is provided in Attachment 2.
If you have any questions regarding this submittal, please contact Mr. Page Kemp at (540) 894-2295.
Sincerely, E. S. Hendrixson Director, Nuclear Safety and Licensing A053
Attachments
- 1. Summary of TS Bases Changes Not Previously Submitted to the NRC
- 2. Summary of TS Bases Changes Associated with Licensd Amendments Enclosure - CD of Current TS Bases (Rev 41)
Commitments made in this letter: None cc: U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 /
Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr. (without Enclosure)
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 State Health Commissioner (without Enclosure)
Virginia Department of Health James Madison Building - 7 th Floor 109 Governor Street Room 730 Richmond, Va 23219 Dr. V. Sceenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0-8 H4A Rockville, Maryland 20852 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 16 E15 Rockville, Maryland 20852 NRC Senior Resident Inspector (without Enclosure).
North Anna Power Station
ATTACHMENT 1 Serial No.09-561
SUMMARY
OF TS BASES CHANGES NOT PREVIOUSLY SUBMITTED TO THE NRC Virginia Electric and Power Company (Dominion)
North Anna Power Station Units I and 2
Summary of TS Bases Changes Not Previously Submitted to the NRC Correction to Reference Section (Bases - TS 3.7.3 References)
This Bases change corrected Reference 1 listed in the Bases for TS 3.7.3 from UFSAR Section 10.4.7 to UFSAR Section 10:4.3. This was considered an administrative change to correct a typographical error in the References section whereby UFSAR Section 10.4.3 is the correct reference for the Condensate and Feedwater Systems.
Added reference to Regulatory Guide (RG) 1.97 Instrumentation Design and Qualification Requirements to Bases for TS 3.3.3 (Bases - TS 3.3.3 LCO)
The Bases change added a reference to the Regulatory Guide 1.97 Instrumentation design and qualification requirements needed to monitor the plant and its environs during and following an accident to the Bases for TS 3.3.3, PAM Instrumentation.
Clarification of EDG Operability (Bases - TS 3.8.1 LCO)
This change clarified EDG operability in TS 3.8.1 LCO Bases in the event of a loss of offsite power supply to the emergency bus.
Revised Tier 2 Restriction for the Application of TS 3.0.8.a (Bases - LCO 3.0.8)
This change revised the Bases for LCO 3.0.8 to permit the use of an alternate means of core cooling to satisfy the Tier 2 restriction when the Auxiliary Feedwater (AFW)
System is not required to be operable in accordance with Technical Specifications. The alternate means of core cooling provides an acceptable level of safety and continue to limit high risk plant configurations.
Clarification of AFW System Operability (Bases - TS 3.7.5 LCO)
The change clarified the Bases for TS 3.7.5 LCO to state that if a seismic air tank or the inlet check valve to the seismic air tank associated with any of the air operated valves is removed from service, or becomes unavailable, then the associated valve is considered inoperable. Change was based upon the results of an evaluation by Engineering on AFW System operability when the seismic air tanks associated with the AFW pumps are removed from service.
Revised Maximum pH Allowed - GSI 191 Project (Bases - TS 3.6.8 Background)
The change revised the Bases for TS 3.6.8 of the Chemical Addition System to reduce the maximum pH value from 9.5 to 8.5 allowed in the fluid recirculated from the containment sump following a LOCA. This is consistent with the pH assumed in the GSI-191 analysis for chemical precipitation. Chemical effects testing associated with GSI-191 has shown that sump fluid pH in excess of 8.5 may cause a reduction in the NPSH available to ECCS and RSS pumps due to excessive chemical precipitation.
ATTACHMENT 2 Serial No.09-561
SUMMARY
OF TS BASES CHANGES ASSOCIATED WITH LICENSE AMENDMENTS Virginia Electric and Power Company (Dominion)
North Anna Power Station Units I and 2
Summary of TS Bases Changes Associated with License Amendments Removal of Bottled Air System (TS 3.7.13) from Technical Specifications These changes revised the Technical Specifications to delete TS 3.7.13, "MCR/ESGR Bottled Air System;" created a new TS 3.3.6, "Main Control Room/Emergency Switchgear Room (MCRIESGR) Envelop Isolation Actuation Instrumentation" to establish the operability requirements of for the MCR/ESGR envelop isolation function, and incorporated TS 3.7.14, "MCRIESGR Emergency Ventilation During Movement of Recently Irradiated Fuel Assemblies" into TS 3.7.10, "MCRIESGR Emergency Ventilation System." The changes revised the Technical Specifications to be consistent with the assumptions of the current dose analysis of record performed in accordance with 10 CFR 50.67, "Accident Source Term" and the results of the non-pressurized MCR/ESGR envelope tracer gas testing.
The Bases changes noted above were submitted to the NRC on March 19, 2008 and incorporated into the Bases on June 18, 2009 upon NRC approval and implementation of the associated Technical Specification changes (Amendments 255 for Unit 1 and 236 for Unit 2 issued on March 25, 2009).
Extended Completion Time to TS 3.8.3 to Allow EDG Fuel Oil Storage Tank Cleaning and Recoating These changes revised TS 3.8.3 to allow a one-time extended 14 day completion time for each of the two underground diesel fuel oil storage tanks to permit removal of the current coating and to recoat the tanks in preparation for use of ultra-low sulfur diesel fuel oil.
The Bases changes noted above were submitted to the NRC on December 17, 2007 and incorporated into the Bases on January 19, 2009 upon NRC approval and implementation of the associated Technical Specification changes (Amendments 254 for Unit 1 and 235 for Unit 2 issued on December 31, 2008).
Clarification to LCO and Bases for TS 3.8.7 and 3.8.9 The changes revised LCO 3.8.7, "Inverters - Operating" to include the inverters from the opposite unit to power the required shared systems, and LCO 3.8.9, "Distribution Systems - Operating" to ensure that required 120 VAC Vital Buses are OPERABLE to support the operability of shared components on the other unit:
The Bases changes noted above were submitted to the NRC on October 24, 2007 and incorporated into the Bases on November 30,, 2008 upon NRC approval and implementation of the associated Technical Specification changes (Amendments 253 for Unit 1 and 234 for Unit 2 issued on October 9, 2008).
)