ML20056C334

From kanterella
Revision as of 11:31, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed TS Table 3.15, Seismic Monitoring Instrumentation & 1.0 Definitions Section Covering Shutdown Mode
ML20056C334
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/13/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20056C333 List:
References
NUDOCS 9305190230
Download: ML20056C334 (8)


Text

. . .. . . . - . .. . ._ - - . . . . . . . . .--. -

I I .

I .- .

-l 1 i ATTACHMENT'1 l 1

.)

PEACH BOTTOM ATOMIC POWER. STATION -l UNITS 2 AND 3 l l

l

. l i Docket Nos. 50-277  !

l 50-278' ] l i

! ' License Nos. DPR-44 i l

DPR-56 l TECHNICAL SPECIFICATION CHANGE 92-11'(revised)

List of Revised Pages.

Unit 12 Unit 3 240u 240u 240w 240w l .-

9305190230 93051 PDR ADOCK 05000 ,

P PD _

i Unit 2 PBAPS '

I I

J TABLE 3.15**  !

i SEISMIC MONITORING INSTRUMENTATION  ;

f Minimum Measurement Instruments l Instruments and Sensor Locations # Range Operable  ;

1. Triaxial Time-History Accelerometers  !

t

a. Containment Foundation  ;

(torus compartment) -1 to Ig 1  !

b. Refueling Floor -1 to lg 1 [
c. RCIC Pump (Rm #7) -1 to Ig 1 .
d. "C" Diesel Generator -1 to lg 1  !

t

2. Triaxial Peak Accelerographs l
a. Reactor Piping (Drywell) 0.01 to 2g 1
b. Refueling Floor 0.01 to 2g 1 ,
c. "C" Diesel Generator 0.01 to 2g 1
3. Central Recording and Analysis ,

System ,

-1 to lg 1* f

a. Cable Spreading Rm l

!

  • With reactor control room annunciation
    • Effective upon completion of installation f Seismic instrumentation located in Unit 2 l

I i

- 240u -

l t

l l

? l

_ . _ - . _ _ . - .1

~

l i l

i Unit 3 1

I i

PBAPS 1 TAptE 3.15** ,

i

( SFISMIC MONITORING INSTRUMENTATION ,

i f

i Minimum l Measurement -Instruments

! Instruments and Sensor Locations # Ranc.e Operable -

1. Triaxial Time-History Accelerometers- l l
a. Containment Foundation '

(torus compartinent) -1 to lg 1 b, Refueling Floor -1 to Ig 1 ,

c. RCIC Pump (Rm #7) -1 to Ig 1
d. "C" Diesel Generator -1 to Ig 1
2. Triaxial Peak Accelerographs l

I

a. Reactor Piping (Drywell) 0.01 to 2g 1
b. Refueling Floor 0.01 to 2g 1
c. "C" Diesel Generator 0.01 to 2g 1 l
3. Central Recording and Analysis  ;

System

~

l

-1 to lg 1*

a. Cable Spreading Rm ,
  • With reactor control room annunciation
    • Effective upon completion of installation '

i! Seismic instrumentation located in Unit 2 i i i

- 240u -

l t

r 4

I Unit 2 I

i PBAPS 3.15/4.14 BASES The operability of the seismic monitoring instrumentation ensures that sufficient capability is available to promptly determine the magni-tude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the plant.

The time-history data from the Triaxial Time-History Accelerometers is recorded in the cable spreading room using a solid-state central ,

recording system. Following a seismic event, the data is downloaded into

a computer so that the results and data can be analyzed. <

l l

l l

1

[

l l 1

i i

i l

b

- 240w - ,

i

Unit 3 I

I i l PBAPS ,

l t t

! 3.15/4.14 BASES i

The operability of the seismic monitoring instrumentation ensures .

that sufficient capability is available to promptly determine the magni-  !

tude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the plant.

The time-history data from the Triaxial Time-liistory Accelerometers (

is recorded in the cable spreading room using a solid-state central recording system. Following a seismic event, the data is downloaded into ,

a computer so that the results and data can be analyzed.

P i

i

[

i t

I i

[

1 f

I l

i f

f

- 240w - ,

t

?

f

4

! l i- .

-]

j -

1 . .l P

I i

i ATTACHMENT 2  !

i PEACH BOTTOM ATOMIC'POWE'R STATION UNITS'2 AND 3. i Docket Nos. 50-277  ;

50-278  ;

License Nos. DPR -

DPR-56 -l TECHNICAL SPECIFICATION CHANGE  ;

92-10'(revised)-

l i

List of Revised Pages  !

. Unit 2 Unit 3 l

7 7 '

l

I 4

?

j. . Unit 2
PBAPS 3

i i 1.0 DEFINITIONS (Cont'd) ,

a j outage, the required surveillance testing need not be j performed until the next regularly scheduled outage.

4 Reportable Event - A reportable event shall~be any.of those conditions specified in Section 50.73 to 10 CFR-Part 50.

i

Run Mode - In this mode the reactor system pressure is.at or above 850 psig and the reactor protection system is energized  ;

j with APRM protection (excluding the 15% high flux trip) and ,

l

. RBM interlocks in service.

l

! Safety Limit - The safety limits are limits below which the j reasonable maintenance of the cladding and primary systems are  ;

assured. Exceeding such a limit requires unit shutdown and  !
review by the Nuclear Regulatory Commission before resumption  ;
of unit operation. Operation beyond such a limit may not in i 3 itself result in serious ~ consequences, but it indicates an
operational deficiency subject to regulatory review, a

Secondary Containment Integrity -

Secondary - Containment j integrity means that the reactor-building is intact and the ,

following conditions are met: .

1. At least one door in each access opening is closed. I
2. The standby gas treatment is operable..
3. All Reactor Building ventilation system automatic (

isolation valves are operable or deactivated in the isolation position.  !

t Shutdown - The reactor is in a shutdown condition when the  !

reactor mode switch is in the shutdown mode position and no core alterations are being performed. ,

t  !

Shutdown Mode - Placing the mode switch to the shutdown l position initiates a reactor scram. After about 2 seconds,  ;

this SCRAM signal is bypassed. The SCRAM logic cannot be l reset until a 10 second timer is complete. The SCRAM can then '

be reset to restore the normal valve line-up in the control rod drive hydraulic system. i l

t I

f f

, -- o-- , w

l '

i

- Unit 3 f

I .

i

  • PBAPS 1.0 DEFINITIONS (Cont'd) outage, the required surveillance testing need not be performed until the next regularly scheduled outage.

Reportable Event - A reportable event shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50.

i Run Mode - In this mode the reactor system pressure is at or above 850 psig and the reactor protection system is energized with APRM protection (excluding the 15% high flux trip) and RBM interlocks in service.

Safety Limit - The safety limits are limits below which the reasonable maintenance of the cladding and primary systems are assured. Exceeding such a limit requires unit shutdown and review by the Nuclear Regulatory Commission before resumption of unit operation. Operation beyond such a limit may not in itself result in serious consequences, but it indicates an operational deficiency subject to regulatory review.

l Secondary Containment Integrity -

Secondary Containment integrity means that the reactor building is intact and the following conditions are met:

1. At least one door in each access opening is closed. l
2. The standby gas treatment is operable.
3. All Reactor Building ventilation system automatic isolation valves are operable or deactivated in the ,

isolation position. .

Shutdown - The reactor is in a shutdown condition when the reactor mode switch is in the shutdown mode position and no I core alterations are being performed. l

. 1 Shutdown Mode - Placing the mode _ awitch to the shutdown position initiates a reactor scram. After about 2 seconds, j this SCRAM signal is bypassed. The SCRAM logic cannot be I reset until a 10 second timer is complete. The SCRAM can then l be reset to restore the normal valve line-up in the control rod drive hydraulic system.

l

'