ML20056C332
| ML20056C332 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/13/1993 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20056C333 | List: |
| References | |
| NUDOCS 9305190226 | |
| Download: ML20056C332 (3) | |
Text
10 CFR 50.90 PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE PA 19087-5691 C15) M4NOO May 13, 1993 Docket Nos. 50-277 50-278 STATION SUPPORT DEPARTMENT License Nos. DPR-44 DPR-56 U.
S.
Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 f
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Revisions to Technical Specification Change Requests 92-11 and 92-10 REFERENCE 1)
Letter from G. J. Beck (PECo) to NRC dated March 5, 1993 2)
Letter from G. A. Hunger (PECo) to NRC dated March 11, 1993
Dear Sir:
The reference 1 letter submitted Philadelphia Electric Company's (PECo) Technical Specification Change Request (TSCR) 92-11.
Reference 2 submitted PECo's TSCR 92-10, This letter revises both TSCRs to reflect changes agreed upon between PECo and the NRC staff during the review of the TSCRs.
The revisions r
are intended to provide clarity and to correct a typographical error, respectively.
TSCR 92-11 originally requested a change to the PBAPS Technical Specifications (TS) to amend pages 240u and 240w in support of modification 5280.
Modification 5280 replaces the existing outdated Terra Technology Corporation seismic monitoring instrumentation with a new solid state system manufactured by Kenemetrics.
The Kenemetrics system consists of SSA-3 recorders, an SSP-1 computer and new triaxial accelerometers.
Because the function of the seismic monitoring system remains unchanged, PECo is requesting the NRC review and approve the proposed TSCR only, not the modification itself.
-1{Tjd(l 180038 i
9305190226 930513 PDR ADOCK 05000ES7 p
p.
S. Nuclear Regulatory Commission May 13, 1993 PBAPS Units 2 and 3 Page 2
- TSCR 92-11 & 92-10 Revisions
- to this letter contains the revised TSCR 92-11 j
pages 240u (Table 3.15) and 240w, (its associated Bases) for j
PBAPS Units 2 and 3. contains the revised TFCR 92-l 10 page 7, also for PBAPS Unit 2 and 3.
Please substitute them l
for the pages submitted with the referenced letters.
j We have concluded that the proposed revisions do not affect j
the finding of th', no significant hazards considerations previously submitied.
r If you have any questions concerning this submittal, please contact us.
I Sincerely, t
G. A. h'unge, Director l
Licensing Section i
4
Enclosures:
Affidavit, Attachment 1, Attachment 2 cc:
T. T. Martin, Administrator, USNRC, Region I-J. J. Lyash, Senior Resident Inspector, USNRC, PBAPS l
W.
P. Dornsife, Commonwealth of Pennsylvania t
f I
4 l
.... -, _. _ _, _. ~
i 1
l i
l COMMONWEALTH OF PENNSYLVANIA:
l i
SS.
l COUNTY OF CHESTER i
l 4
G.-R. Rainey, being first duly sworn, deposes and says:
l That he is Vice President of Philadelphia Electric Company;
}
}
the applicant herein; that he has read the attached revised l
Technical. Specification Change Request-(TSCR 92-11 and 92-10)
{
i pages for changes to the-Peach Bottom Facility Operating L. censes
[
DPR-44 and DPR-56, and knows the contents thereof: and-that the I
statements and matters set forth therein are true and correct to the best of his knowledge, information and~ belief.
i j
i l
/ rwl 1
/ 4 // ' '
l Vice President Subscribed and sworn to before me this /
" day 4
AA m 1993.
of p,.
'M ftN8h __
i f
' f T
Notary Public MS981 EmsAseen pygg Comy
.W b.Aty10,1995
. ~.. -. -...
- _,