Application for Amends to Licenses NPF-2 & NPF-8,revising Requirements of Battery Load Profile for Plant
ML20043G611
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/15/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043G612 List:
References
NUDOCS 9006200486
Download: ML20043G611 (2)


Text

- -

^eie<'r*--

Alabama Power Comp:ny -

' 40 inverness C:nt;r Parkry Post Office Box 1M$

Birmingham, Alabama 35201 Telephone 205 868 5581 W. G. Hairston,111 Senior Vice President Nuclear Operations gggggg ,

the souttwn dectic system i

June 15, 1990 10CFR50.90 i

Docket Nos. 50-348 50-364 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D.C. 20555 -

Gentlement Joseph H. Farley Nuclear Plant Proposed Revision of Battery Load Profile Requirements Alabama Power Company proposes to delete from Technical Specifications the tables which delineate the load profiles for the Auxiliary Building battery service test and the Service Water battery service test. The tables contained in'the Technical' Specifications vould be replaced with statements requiring testing to equivalent load profiles based on . _

anticipated breaker operations required during loss-of-offsite power (LOSPj i and loss-of-coolant accident (LOCA) conditions. The equivalent load '

I profiles are explicitly defined in the Final Safety Analysis Report (FSAR).

By removing the table from the Technical Specifications, changes vill not be required each time an emergency load is added or deleted while the requirement to test to the design basis load profile vill still be preserved.  !

The proposed Technical Specification changes are provided in Attachment _1.

Alabama Power Company has determined that the proposed changes do not i involve a.significant hazards consideration. In accordance with 10CFR50.92, a significant hazards consideration evaluation is provided in Attachment 2. Alabama Power Company's Plant Operations Review Committee has reviewed these proposed changes and the Nuclear Operations Review Board will reviev these proposed changes-at a future meeting. NRC approval of this change is requested by December 15, 1990.

Pursuant to 10CFR50.91(b)(1), a copy of this proposed change has also been sent to Dr. C. E. Fox, the Alabama State Designee.

l 9006200486 90061!5 PDR ADOCK 05000348 /)0 ,

p PDC v I

([l

U. S. NuclO;r Regulatsry Cic;issign

. P ge 2 If there are any questions, please advise.

Respectfully submitted, ALABAMA POVER COMPANY i

Lh , h*s ,

V. G. Hairston, III VGH,III/ REM mgd 21.19 i

cct Mr. S. D. Ebneter SVORN TO AND SUBSCRIBED BEFORE ME  ;

Mr. S. T. Hoffman i Mr. G. F. Maxwell THIS 15 d DAY _0F d u,t r , 1990 L d if un N1.g,

~-

I'[ h 7 o gNotary Public My Commission Expires /d 15 9;A l