ML18197A296

From kanterella
Revision as of 22:19, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 88-8046 for Question 03.05.02-4 (Rev.1)
ML18197A296
Person / Time
Site: 05200046
Issue date: 07/13/2018
From: Yeon Kim
Korea Hydro & Nuclear Power Co, Ltd
To: William Ward
Document Control Desk, Office of New Reactors
Shared Package
ML18197A295 List:
References
MKD/NW-18-0103L
Download: ML18197A296 (2)


Text

70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr July 13, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0103L

Subject:

Revised Response to RAI 88-8046 for Question 03.05.02-4 (Rev.1)

References:

1) NRC Request for Additional Information 88-8046, dated July 20, 2015
2) KHNP Letter MKD/NW-15-0108L, Response to RAI 88-8046, dated August 28, 2015 KHNP is hereby submitting the response to RAI 88-8046, dated July 20, 2015. The revised response addresses Question 03.05.02-4 in response to clarify that there is no seismic Category I buried piping in the APR1400 design.

The enclosure provides the revised response to RAI 88-8046 for Question 03.05.02-4 (Rev.1)

(Non-Proprietary).

If additional information or clarification is required, please contact Daegeun Ahn, General Manager of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.

Sincerely, Yun-ho Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.

Enclosures:

Revised Response to RAI 88-8046 for Question 03.05.02-4 (Rev.1) (Non-Proprietary)

Enclosure Revised Response to RAI 88-8046 for Question 03.05.02-4 (Rev.1)

(Non-Proprietary)

July 13, 2018