Proposed Change to Tech Spec Section 4.6.1.3,revising Containment Air Lock Surveillance Requirements to Standardize Requirements for Both Units
ML18092A715
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/06/1985
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A713 List:
References
NUDOCS 8508160372
Download: ML18092A715 (4)


Text

,, .

ENCLOSURE CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITON FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

a. Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shiill be closed, and
b. An overall air lock leakage rate of~ 0.05*La at design pressure (47.0 psig).

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQJIREMENTS

=============-=-=============:================
4. 6.1. 3 Each containment air lock shall be de1TDnstrated OPERABLE:
a. *By pressurizing the vo 1ume between the airlock door gaskets to

> 10.D psig and checking for an extrapolated** seal leakage rate equal to or less than 0.01 La.

1. After each opening, except when used for rrultiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
2. After performing maintenance which could affect the airlock door gaskets sealing capability.
3. Prior to establishing containment integrity,
b. By conducting an overall air lock leakage test at design pressure (47.0 psig) and verifying the overall air leakage rate is within its limit:
1. At least once per six nonths #.

SALEM - UNIT 1 3/4 6-5 8508160372 g~~72 PDR p

ADOCK PDR L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~

i':

CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS SURVEILLANCE REQJIREMENTS (Continued)

2. Prior to establishing containment integrity when maintenance that could affect the airlock sealing capability was performed and the maintenance affects components other than the ooor gaskets 1
  • and
c. At least once i)er 6 rronths by verifying that only one door in each air lock can be opened at a time.
    • The measured leakage at the test pressure {10 psig) shall be multiplied by an extrapolation factor of 9.1 to determine what the seal leakage flow rate would be if tested at design pressure (47.0 psig). This extrapolated seal leakage rate shall be less than or equal to 0.01 La.
  • # The provisions of Specification 4.0.2 are oot applicable.

SALEM - UN IT 1 3/4 6-5a

.ENCLOSURE 2 SALP PLANT SYSTEMS BRANCH, PWR-A SALEM UNITS 1 and 2 <

EVALUATION CRITERI/\

PERF 0Rt*1ANC E CATEGORY BASIS -

~

"', 1. Management

" Involvement N/A

2. Approach .to Resolution of 2 Understanding of Lsue generally apparent e

Technical Issues I

3. Responsiveness 2 Generally timely responses
4. Enforcement Hi stor.v
5. Reportable Events
    • --*~-* . *-** . . . e
6. Staffing ,._ - . .

7*"'Training

. I

1.

ENCLOSURE 2 SALP PLANT SYSTEMS BRANCH, PWR-A SALEM UNITS 1 and 2 EVALUATION PERF0Rt*1P.NCE BASIS

' CRITERIJ\ CATEGORY i

~
1. Mana'Jement I N/A Involvement
2. Approach -to 2 Resolution of Understandin~ of i~sue generally apparent Technical Issues I 3. Responsiveness I

! 2 Generally timely responses

4. Enforcement Hi stor.v
5. Reportable Events

_ _ _ _.....;...._-1r---.-*--*-----_;__---------1

6. Staffing

~__.;~------t---~-,-- --*-**--*---------------1 7 .' Training