ML20023B812

From kanterella
Revision as of 14:27, 16 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 83-028/03L-0:on 830331,after Completion of Surveillance Test on Solid State Protection Sys Train a & Review by Maint Supervisor,Sys Declared Inoperable to Troubleshoot Possible Problem W/Safety Injection Reset Time Delay
ML20023B812
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/29/1983
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20023B804 List:
References
LER-83-028-03L-01, LER-83-28-3L-1, NUDOCS 8305060406
Download: ML20023B812 (2)


Text