MONTHYEARML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML1219103342012-07-0202 July 2012 USNRC 10CFR Part 21 Notification Regarding Potential Failures of Kraus and Naimer (K&N) M470 Spring Return Switches ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1018900662010-07-0606 July 2010 Part 21 Report Concerning Failure of Oil-Filled Capacitor ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0520803682005-07-26026 July 2005 Tom Milton, Email, Interim Report-Cutler Hammer Components ML0327507562003-09-30030 September 2003 Part 21 Report Regarding the Failure of the Eaton Cutler-Hammer Freedom Series Heater Pack Due to a Possible Defect in the Weld Which Joins the Screw Terminal to the Heater Coil 2019-07-11
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARNL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML20366A0482020-12-0707 December 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 NL-20-0764, Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-06-24024 June 2020 Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material ML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML18225A1182018-07-27027 July 2018 Ametek Solidstate Controls - Notification of Potential Defect-10CFR Part 21 ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17032A0802016-12-30030 December 2016 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0114, Rev. 0 ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML16188A3772016-06-21021 June 2016 Part 21 - Insufficient Valve Cage Hardfacing ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14099A5062014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62 ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14090A4312014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62 ML14034A1892014-01-23023 January 2014 Part 21 - Loose Battery Vent Assemblies ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML11251A1982011-09-0606 September 2011 Notification Under 10 CFR Part 21 on Certain Rosemount Model 1153 Series B, 1164 and 1154 Series H Pressure Transmitters, May Not Perform Their Intended Safety Function ML1108400372011-03-23023 March 2011 Notification of Potential Part 21 Report Concerning Valve Plunger Guide Malfunction 2023-03-23
[Table view] |
Text
ENGINE SYSTEMS, INC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 November 28, 2017 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 Power Supply, P/N 2938604
Dear Sir:
The enclosed report addresses a reportable notification on a power supply, P/N 2938604.
A copy of the report has been mailed to our affected nuclear customers.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:---------
93 DATE:
Quality Performance With Pride
~
./
ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0119 Rev. 0: 11/21/17 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Power Supply Part Number 2938604 SYSTEM: Emergency Steam Turbine CONCLUSION: Reportable in Accordance With 10CFR21 Prepared By:--,.=--~---'-'~=--* _ _ _ _ _ _ _ __ Date: II /21 /17 0-Engineering Manager Reviewed B y : ~ ~ - - - Date: //-2/-/7 Quality Manager Quality Performance With Pride L__
'-. A,/
Report No. 10CFR21-0119 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 11/21/17 Initial issue.
- ' Revision: 0 1Date: 11/21/17 Page: 1 of 2 Component:
Power supply P/N 2938604.
Summary:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on October 17, 2017 upon notification of a potential issue with power supply P/N 2938604 supplied to Vogtle Nuclear Plant. The power supply is installed in a safety-related control panel for the Terry Turbine driven auxiliary feedwater pump.
Analysis determined the power supply failure was due to an internal rectifier diode failure which resulted in a short circuit on the power supply output.
The evaluation was concluded on November 20, 2017 and it was determined that this issue is a reportable defect as defined by 10CFR Part 21. The power supply failure will adversely affect speed control of the turbine driven auxiliary feedwater pump and therefore may prevent safe shutdown of the nuclear reactor.
Discussion:
The failed power supply, Phoenix Contact part number 2938604, is a QUINT series with 24 VDC, 1OA output. In a typical application, such as with the Vogtle control panel, the device is used to convert 125 VDC to 24 VDC. The serial number of the failed device is 366020 with a date code of 0705. The power supply was provided by ESI in June 2007 as a safety-related replacement component for the Terry Turbine control panel upgrade previously supplied in 2005. The power supply remained in Vogtle inventory *until 2017 when the previously installed power supply was replaced. After less than 4 weeks in service, the power supply failed on October 4, 2017. The method of failure was a short circuit on the output.
Vogtle contacted Phoenix Contact and was informed that there is a potential issue with power supplies manufactured between December 2006 and October 2007. Specifically, there is a possibility that the secondary rectifier diodes (designated D20 and D21) on the output of the supply may be prone to premature failure. The supplier of the diodes changed the diode technology from wire bond to copper clip and this process change contributed to an unusual silver migration effect. The power supply date code range affected by this issue is 0648 through 0723.
The failed power supply was sent to Exelon Powerlabs for analysis and it was confirmed that the power supply output was shorted. As part of the analysis, the D20 and D21 diodes were tested and found to be shorted. This confirmed the failure mode was the same as suspected by Phoenix Contact. Powerlabs issued their report on October 27, 2017.
On October 16, 2017, a second power supply failed at Vogtle (S/N 366019). This was the replacement for the first failed power supply and was installed on October 4, 2017. Investigation revealed that the second power supply exhibited the same failure mode, shorted diode, as the first failure. Both the first and second failed power supplies were provided by ESI in June 2007 and both were the same 0705 date code.
Report No. 10CFR21-0119 Revision: 0 Date: 11/21/17 Page: 2 of 2 Impact on Operability:
In the case of the Vogtle control panel, the power supply provides 24 VDC to the PGPL Driver. The Driver receives a proportional control signal from the 505 control and, in conjunction with the feedback signal from a remote servo, provides a position control signal to the PGPL actuator to position the steam control valve. Loss of the power supply; and thus the PGPL Driver, would adversely affect operation of the steam valve which would prevent control of the turbine driven auxiliary feedwater pump. Since the feedwater pump is a safety system within the nuclear plant, failure of the power supply could adversely affect safe shutdown of the nuclear reactor.
Root cause evaluation:
The root cause of the failure is a premature failure of the 020/021 rectifier diodes.
Evaluation of previous shipments:
This issue applies to all customers that have power supply P/N 2938604 within the date code range 0648 through 0723. ESI has supplied power supplies within the suspect date code range to the following sites:
Mfg ESI Sales C-of-C Mfg Serial End User End User P .0. Qty Date Order Date Numbers Code 366019 &
3003318 Southern Nuclear- Vogtle Plant 7077729 2 06/01/2007 0705 366020 1
Southern Nuclear - Farley Plant QP070019/003 392902 &
8000969 2 01/31/2008 0720 (supplied through Dresser-Rand) 131013 (D-R) 392904 Table 1: Listing of Sites with Suspect Power Supply P/N 2938604 Note (1 ): The units for Farley were installed in control panel assemblies P/N 8000969-01 (qty 1 per panel).
Corrective Action:
For Vogtle: Both power supplies provided by ESI have failed and been removed from service. No further action is required.
For Farley: If the power supplies are currently installed they should be removed from service and replaced with newer power supplies from a different date code. Phoenix Contact has indicated that determining when a power supply from the suspect date code range will fail is difficult. Therefore, it is recommended that replacement be performed as soon as possible.