Forwards Rev 3 to Unit 2 Cycle 10 & Rev 1 to Unit 3 Cycle 9, Colr.Colrs for Each Unit Were Revised to Include OLs Consistent with Single Recirculation Loop Operation
ML18039A691
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/19/1999
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18039A692 List:
References
NUDOCS 9903020315
Download: ML18039A691 (8)


Text

CATEGORY j.

'ogEGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION @BR:9903020315 DOC.DATE: 99/02719 .NOTARIZED: NO DOCKET ¹ FACIL:50-260 Bzowns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50=296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH. NAME -AUTHOR AFFILIATION ABNEY,T.E. Ten'nessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 3 to Unit' Cycle 10 5 rev 1 to Unit 3 Cycle 9, C "COLR".COLRs for each unit were revised to include OLs consistent with single recirculation loop operation.

DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR t ENCL SIZE:

TITLE: TVA Facilities - Routine Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME, LTTR ENCL PD2-3 1 1 PD2-3-PD 1 1 DEAGAZIO,A 1 1 INTERNAL: ACRS 1 1 F E 1 1 OGC/HDS3 1 0 RES/DE/SSEB/SES 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 0

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE, WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 8

0 Qi C' JE

Tennessee Valley Authority, Post Office Box 2000, Decatur, Afabama 35609-2000 February 19, 1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of Docket Nos. 50-260 Tennessee Valley Authority 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 2 AND 3 CORE OPERATING LIMITS 'REPORT r RIVIS IONS FOR UNIT 2 CYCLE 1 0 AND UNIT 3 CYCLE 9 TO SUPPORT SINGLE RECIRCULATION LOOP OPERATION In accordance with the requirements of Technical Specification 5.6.5.d, enclosed is Revision 3 to the Unit 2 Cycle 10 and Revision 1 to the Unit 3 Cycle 9, Core Operating Limits Reports (COLR). The COLRs for each unit were revised to include operating limits consistent with single recirculation loop operation. BFN implemented a Technical Specification change for single recirculation loop operation on February 10, 1999.

There are no new commitments contained in this letter. If you have any questions, please contact me at (256)729-2636.

cerel T. E. Ab Manager of L'censin and Indu ry Affa rs Enclosures cc: See page 99030203i5 9902i9'.

- .1

'~.

4 ob PDR ADOCK 05000260, P 'POR

0 U.S. Nuclear Regulatory Commission Page 2 February 19, 1999 Enclosures cc (Enclosures):

Mr. Paul E. Fredrickson, Branch Chief U. S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. L. Raghavan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

J'$

0

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT '(BFN)

UNIT 2 CORE OPERATING LIMITS REPORT (COLR), REVISION 3 FOR CYCLE 10 OPERATION (SEE ATTACHED)