Proposed Tech Specs Re Auxiliary Feedwater Sys
ML18101A238
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/20/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML18101A237 List:
References
NUDOCS 9409270338
Download: ML18101A238 (4)


Text

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary ste~Sl:lfl~l,*pressure is greater than psig. The provisions of Specification 4.0.4 are not applicableX ;TNS6~~ A 1
c. At least once per 18 months during shutdown by:
1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.

-----~------------"

9409270338 940920 ,'

PDR ADDCK 05000272 P PDR SALEM - UNIT 1 3/4 7-6 Amendment No. 153

INSERT A

... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifyin~ that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J? 1 Y pressure is greater than ?S.9-psig. The provisions Specification
4. O. 4 are not applicable)< ::I't-J s- ~ t<. -r A
c. At least once per 18 months during shutdown by:
1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.

SALEM - UNIT 2 3/4 7-6 Amendment No. 134

INSERT A

... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.