MONTHYEARRA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2022-12-16016 December 2022 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-20-0373, Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication2021-01-19019 January 2021 Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication RA-20-0247, Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1)2020-07-30030 July 2020 Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) RA-19-0447, Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1)2020-06-23023 June 2020 Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) RA-19-0256, Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 242019-06-20020 June 2019 Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 RA-18-0067, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 222018-06-28028 June 2018 Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 22 BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0044, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 222017-05-25025 May 2017 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 22 BSEP 16-0037, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 212016-05-18018 May 2016 Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 21 BSEP 15-0051, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 212015-06-29029 June 2015 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 21 BSEP 13-0089, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 202013-08-0606 August 2013 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 20 BSEP 12-0086, Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 182012-07-25025 July 2012 Inservice Inspection Program Owner'S Activity Report for Unit I Refueling Outage 18 BSEP 11-0060, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 192011-06-17017 June 2011 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 19 BSEP 11-0027, Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program2011-02-28028 February 2011 Response to Request for Additional Information Regarding Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 11-0011, Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program2011-01-28028 January 2011 Response to Request for Additional Information - Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 10-0043, Proposed Alternatives for the Third 10-Year Inservice Inspection Program2010-07-23023 July 2010 Proposed Alternatives for the Third 10-Year Inservice Inspection Program BSEP 10-0091, Inservice Inspection Program Owner'S Activity Report, Refueling Outage 172010-07-23023 July 2010 Inservice Inspection Program Owner'S Activity Report, Refueling Outage 17 BSEP 09-0125, Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-462009-12-0202 December 2009 Response to Request for Additional Information Regarding Third 10-Year Inservice Inspection Interval Request for Relief RR-46 BSEP 09-0078, Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 182009-07-28028 July 2009 Submittal of Inservice Inspection Program Owner'S Activity Report, Refueling Outage 18 BSEP 09-0043, Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program2009-05-0808 May 2009 Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program BSEP 09-0024, Proposed Alternative for the Third 10-Year Inservice Inspection Program2009-04-27027 April 2009 Proposed Alternative for the Third 10-Year Inservice Inspection Program BSEP 08-0140, Proposed Alternative for Reactor Vessel Skirt Support Examinations2008-10-10010 October 2008 Proposed Alternative for Reactor Vessel Skirt Support Examinations BSEP 08-0109, Owner'S Activity Report for Third 10-Year Inservice Inspection Program2008-08-26026 August 2008 Owner'S Activity Report for Third 10-Year Inservice Inspection Program BSEP 08-0062, Inservice Inspection Plan for the Fourth 10-Year Inspection Interval2008-05-21021 May 2008 Inservice Inspection Plan for the Fourth 10-Year Inspection Interval BSEP 07-0110, BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval.2007-10-25025 October 2007 BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval. BSEP-07-0063, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report2007-07-16016 July 2007 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 17 Owner'S Activity Report BSEP-06-0066, Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report2006-06-26026 June 2006 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 15 Owner'S Activity Report BSEP 03-0137, Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report2003-10-20020 October 2003 Inservice Inspection Program for the Third 10-Year Interval-Refueling Outage 15 (B216R1) Owner'S Activity Report BSEP 02-0102, Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections2002-05-20020 May 2002 Inservice Inspection Program for Third 10-Year Interval - Evaluation of Leakage at Bolted Connections 2023-06-28
[Table view] Category:Letter type:RA
MONTHYEARRA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0096, Post Accident Monitoring (PAM) Instrumentation Report2023-04-12012 April 2023 Post Accident Monitoring (PAM) Instrumentation Report RA-23-0063, Notification of Deviation from BWRVIP Guidelines2023-04-11011 April 2023 Notification of Deviation from BWRVIP Guidelines RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR)2023-02-22022 February 2023 Unit 2 Cycle 26 Core Operating Limits Report (COLR) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-23-0010, 2022 Sea Turtle Annual Report2023-01-0909 January 2023 2022 Sea Turtle Annual Report RA-22-0616, Revision to Brunswick Snubber Program Plan2023-01-0505 January 2023 Revision to Brunswick Snubber Program Plan RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2022-12-16016 December 2022 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-22-0342, Revision to Emergency Plan On-Shift Staffing Analysis2022-12-0808 December 2022 Revision to Emergency Plan On-Shift Staffing Analysis RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0344, Notification of Deviation from BWRVIP Guidelines2022-11-30030 November 2022 Notification of Deviation from BWRVIP Guidelines RA-22-0261, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2022-09-15015 September 2022 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RA-22-0271, Accident Monitoring Instrumentation Special Report2022-09-13013 September 2022 Accident Monitoring Instrumentation Special Report RA-22-0252, Registration for Use of General License Spent Fuel Casks2022-08-25025 August 2022 Registration for Use of General License Spent Fuel Casks RA-22-0190, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR .2022-08-11011 August 2022 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR . RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 242022-06-0909 June 2022 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 RA-22-0175, Post Accident Monitoring (PAM) Instrumentation Report2022-06-0101 June 2022 Post Accident Monitoring (PAM) Instrumentation Report RA-22-0155, Revision to Emergency Plan Annex and Implementing Procedure2022-05-26026 May 2022 Revision to Emergency Plan Annex and Implementing Procedure RA-22-0134, Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data2022-05-25025 May 2022 Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes2022-05-24024 May 2022 Duke Energy Common Emergency Plan, Revision 2, Summary of Changes RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory2022-05-16016 May 2022 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 20212022-04-27027 April 2022 Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.462022-04-27027 April 2022 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-22-0114, Duke Energy Carolinas, LLC and Duke Energy Progress, LLC Submittal of 10CFR26.719(c)(1) Report of Unsatisfactory Performance of Health and Human Services Certified Laboratory2022-04-0101 April 2022 Duke Energy Carolinas, LLC and Duke Energy Progress, LLC Submittal of 10CFR26.719(c)(1) Report of Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-22-0095, Unit 1 Cycle 24 Core Operating Limits Report (COLR)2022-03-29029 March 2022 Unit 1 Cycle 24 Core Operating Limits Report (COLR) RA-22-0110, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-03-25025 March 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. RA-22-0014, Duke Energy Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-21021 March 2022 Duke Energy Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-22-0046, Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d2022-01-31031 January 2022 Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position 2024-01-10
[Table view] |
Text
(_~ DUKE Brunswick Nuclear Plant P.O. Box 10429 ENERGY Southport, NC 28461 JUN 2 8 2018 Serial: RA-18-0067 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit No. 1 Renewed Facility Operating License No. DPR-71 Docket No. 50-325 lnservice Inspection Program Owner's Activity Report for Unit 1 Refueling Outage 22 Ladies and Gentlemen:
Duke Energy Progress, LLC, is enclosing an American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Form OAR-1 Owner's Activity Report, for the Brunswick Steam Electric Plant (BSEP), Unit No. 1. The report covers inspection activities performed during Brunswick Unit 1 Refueling Outage 22 (i.e., designated as B1 R22) for the third inspection period of the fourth inservice inspection interval.
No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager- Regulatory Affairs, at (910) 832-2487.
Sincerely, Bryan B. Wooten Director - Organizational Effectiveness Brunswick Steam Electric Plant BBW/mkb
U.S. Nuclear Regulatory Commission Page 2 of 2
Enclosure:
Form OAR-1 Owners Activity Report cc (with enclosure):
U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Gale Smith, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U.S. Nuclear Regulatory Commission ATTN: Mr. Dennis J. Galvin (Mail Stop OWFN 8B1A) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. Cliff Dautrich, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
Enclosure RA-18-0067 Form OAR-1 Owners Activity Report for B1R22
Form OAR-1 OWNER'S ACTIVITY REPORT ReportNumber: ___ B_1_R_,2_,2_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Plant: _______B___r___ u___
n___
sw=ic=k....S=t=e=a=m'-E=l=e=c=tn=*c....P""'l=a=n.._t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Unit No.:_ _ _1.___ _ Commerclal Service Date: _.......,M...a"""r~ch:.:....:.1:.97'""7.___ Refuellng Outage No.:_-=B-1"""R:.:2:.:2_____
Current Inspection lnterval:_....:..F..;::o:.::u:.:.rta.:.h"------------------------------
Current Inspection Period: ___T__h__i__ rd___
P_.e_ri....
o_d....o=f....t"""he----'-F""'o'""u"'-rt"'"h'-I"'-n'""le=rv a__ l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Edition and Addenda of Section XI applicable to the Inspection plans: 2001 Edition with 2003 Addenda Date and Revision of Inspection Plans: Fourth Interval Revision 4 12/18/2014 Edition and Addenda of Section XI appllcable to Repair/Replacement activities, If different than the Inspection Plans: None Code Cases used: N-460, N-513-3, N-532-4, N-613-1, N-648-1, N-663, N-695, And N-740-2 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In lhls report are correct; (b) the examinations and lasts meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the Repair/Replacement activities and evaluations supporting the completion ol _=B""-1.... R=2=2_ _ _ __
conform to the requirements of Section XI.
&N~,,.,1z"'fl(L,"'" t,t * .,.~.s ~ 1 t . _,,,.___.1 Owner or Owner's 0eslgoee, Tille
___s-/4 _______________ /e _
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province ol North Carolina and employed by The Hartford Steam Boller Inspection and Insurance Company have inspected the items described in this Owner's Activity Report, and state that, to the best ol my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection .
,/l;, ~.:z,_d
..__ _'A.,""""....,.."-=-T'""1n--.:.i""ss:Slgn'!"-.;atu""reo:;:;;;.a=----
Comm*s1on,t141":j1,r0 A,U ;,, n/5 C ,},_If IZ14 Natl~rd.sl'ate, P7ov1nce, and EndOfsamants Date: S - :l'I 2o I 8 I/ 4
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number Evaluation 408223 - through wall leak in 30" 1-SW-100-30-157 Service Water line per Service Water System Piping requirements of Code Case Category D-B / Item D2.10 Spool 1-SW-100-30-157 N-513-3.
NCR 2114432 was originated on 4/5/2017. The piping was replaced during 81 R22 outage under W/O 20158095 Task 02.
Evaluation 409514 - through wall leak in 30" 1-SW-142-30-157 Service Water line per requirements of Code Case Service Water System Piping Category D-B / Item 02.10 N-513-3.
Spool 1-SW-142-30-157 NCR 2141499 was originated on 8/4/2017. The piping was replaced during 81 R22 outage under W/O 20191808 Task 01.
During Scheduled 81 R22 Ultrasonic Inspection a Circumferential ID connected flaw was detected. It was documented on BNP report VEN-18-028 and Framatome report BNPl-0M-2018-2. NCR-2190611 was generated and a full 1B21N4A-2-SW1-2 Augmented/ BWRVIP-75 Cat. D structural weld overlay was NOZZLE N4A EXTENSION TO R-A / Rl.11-2 performed per EC-411737 using SAFE END (DM)
Code Case N-740-2 under work order 20240085 Task 07.
The Component BWRVIP status has been changed from Category "D" to Category "E" and is scheduled to be re-examined during the next refueling outage
{81R23).
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 (Cont.)
ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination category and Item Item Description Evaluation Description Number During Scheduled B1 R22 Inspection a Ultrasonic Circumferential ID connected flaw was detected. It was documented on BNP report VEN 036 and Framatome report BNPl-DM-2018-8. NCR-2191576 was generated and a full structural weld overlay was Augmented/ BWRVIP-75 Cat. D 1B21N4D-5-SW1-2 performed per EC-411749 using Code R-A / Rl.14-2 NOZZLE N4D EXTENSION TO Case N-740-2 under work order SAFE END (DM) 20240112 task 07.
The Component BWRVIP status has been changed from Category "D" to Category "E" and is scheduled to be re-examined during the next refueling outage (81 A23).
During Scheduled B1 R22 Inspection a Ultrasonic inside surface planar flaw was detected in the base metal adjacent to the weld. It was documented on BNP report VEN 034 and Framatome report BNPl-DM-Augmented / BWRVIP-75 Cat. D 1B21N4D-5-SW2-3 2018-9. NCR-2190996 was generated R-A / Rl.20-4 NOZZLE N40 SAFE END TO PIPE and an evaluation was performed by EXTENSION (OM)
Structural Integrity on report #
1800389.301 and documented under EC-411734 for continued service. The Component BWRVIP status has been changed from Category "D" to Category "F." The ASME required successive examinations are scheduled to be performed during the next three inspection periods.
3/~
TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Date Repair/Replacement Code Class Item Description Description of Work Completed Plan Number N4A Safe-End to safe-End 1 N4A Nozzle 3/31/2018 20240085-07 Extension Weld Overlay N40 Safe-End to safe-End 1 N4D Nozzle 3/31/2018 20240112-07 Extension Weld Overlay 3 1-SW-2-20-157 Weld Repair of Pipe Elbow 3/18/2018 20239866-02 Replace 20" Flange Due to a 3 1-SW-142-20-157 3/15/2018 20191808-01 Through wall Leak Replace 6" section of piping 3 1-SW-147-1-l/2-17A Between Welds # 1-SW-1886 3/29/2018 20241892-01 and 1-SW-5591 Weld Repair Crack at Toe of 3 l*SW-147-1-1/2-17A 3/29/2018 20241892-01 Weld # l*SW-BMWR-95 Perform base Metal Weld 3 1-VA-lA-FCU-RB 3/24/2018 20176610-17 Repairs Weld Repair of Through wall 3 1-SW-100-30-157 3/14/2018 201S8095-02 Leak of Service Water Header Check Valve Replace Check valve due to 3 3/7/2018 20040132-01 1-SW-V685 Degraded Condition Replace Dlscharge Valve due to 3 1-SW-V17 3/17/2018 20101871-01 Degraded Condition