RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums

From kanterella
Jump to navigation Jump to search
10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
ML23089A069
Person / Time
Site: Oconee, Mcguire, Catawba, Harris, Brunswick, Robinson, McGuire  Duke Energy icon.png
Issue date: 03/30/2023
From: Ellis K
Duke Energy Carolinas, Duke Energy Progress
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RA-23-0039
Download: ML23089A069 (1)


Text

fa DUKE Kevin M. Ellis

~ ENERGY General Manager Nuclear Regulatory Affairs, Policy & Emergency Preparedness

Duke Energy 13225 Hagers Ferry Rd.,

MG011E 843-951-1329 Kevin.Ellis@duke-energy.com

Serial: RA-23-0039 March 30, 2023 10 CFR 140.21

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324 / Renewed License Nos. DPR-71 and DPR-62

Catawba Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-413 and 50-414 / Renewed License Nos. NPF-35 and NPF-52

McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-369 and 50-370 / Renewed License Nos. NPF-9 and NPF-17

Oconee Nuclear Station, Unit Nos. 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 / Renewed License Nos. DPR-38, DPR-47, and DPR-55

Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400 / Renewed License No. NPF-63

H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 / Renewed License No. DPR-23

Subject:

10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums

The requirements of 10 CFR 140.21 include annual submittal of evidence that each licensee maintains a guarantee of payment of deferred premium in the amount of $20.5 million for each reactor it is licensed to operate. Duke Energy Carolinas, LLC and Duke Energy Progress, LLC maintain nuc lear liability endors ements through Mars h USA for the Catawba Nuc lear Station (CNS), McGuire Nuc lear Station (MNS), Oc onee Nuc lear Station (ONS), Shearon Harris Nuc lear Power Plant (SHNPP), Bruns wic k Steam Elec tric Plant (BSEP), and the H.B. Robins on Steam Elec tric Plant (HBRSEP) under the Americ an Nuc lear Ins urers (ANI) Mas ter Policy -

Nuc lear Energy Liability Ins uranc e (Sec ondary Financ ial Protection). This cov erage inc ludes a Bond of Payment of Retrospective Premiums and provides the basis for Duke Energy compliance with the provisions of 10 CFR 140.21(a). A certificate of insurance verifying ANI Nuclear Energy Liability insurance was sent by Marsh USA to the United States Nuclear Regulatory Commission on January 18, 2023.

U.S. Nuclear Regulatory Commission Page 2

Please address any comments or questions regarding this matter to Ryan Treadway, Director -

Fleet Licensing at (980) 373-5873.

Kevin M. Ellis General Manager, Nuclear Regulatory Affairs, Policy & Emergency Preparedness U.S. Nuclear Regulatory Commission Page 3

xc:

L. Dudes, USNRC Region II - Regional Administrator N. J ordan, NRR Project Manager - Fleet G. Smith, USNRC Senior Res ident Ins pector - BSEP D. Retterer, USNRC Senior Resident Inspec tor - SHNPP J. Zeiler, USNRC Senior Res ident Ins pector - HBRSEP D. Riv ard, USNRC Senior Resident Ins pec tor - CNS G.A. Hutto, USNRC Senior Res ident Ins pector - MNS J. Nadel, USNRC Senior Res ident Ins pec tor - ONS