Proposed Consolidated Emergency Operations Facility Response to Request for Clarification
ML18267A067
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 09/18/2018
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18267A101 List:
References
18-312
Download: ML18267A067 (3)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 18, 2018 10 CFR 50.90 United States Nuclear Regulatory Commission Serial No.18-312 Attention: Document Control Desk NRA/GDM R1 Washington, D.C. 20555 Docket Nos.: 50-338 50-339 50-280 50-281 License Nos.: NPF-4 NPF-7 DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION (NAPS) UNITS 1 AND 2 SURRY POWER STATION CSPS) UNITS 1 AND 2 PROPOSED CONSOLIDATED EMERGENCY OPERATIONS FACILITY RESPONSE TO REQUEST FOR CLARIFICATION By letter dated January 16, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18025B468), Virginia Electric Power Company (Dominion Energy Virginia), requested the U.S. Nuclear Regulatory Commission (NRC) to approve license amendment requests (LAR) revising the emergency plans for North Anna and Surry Power Stations (NAPS and SPS, respectively) Units 1 and 2. The proposed amendments would consolidate the NAPS and SPS local emergency operations facilities (EOFs), their common back-up central EOF, and their headquarters support organization. By email dated May 1, 2018, the NRC transmitted a request for additional information (RAI) related to the LAR. Dominion Energy Virginia responded to the NRC staff's RAI by letter dated June 13, 2018 (ADAMS Accession No. ML18169A224). The NRC staff reviewed that response and identified one item requiring additional clarification. By email dated July 25, 2018, the NRC stated that it appears Dominion Energy Virginia is still requesting a change to allow an extension of the currently approved augmentation timing from 60 to 75 minutes for staffing the NAPS emergency response positions and requested that we clarify and supplement our response to RAl-4 by submitting additional justification for this change. The requested clarification and justification is provided in the attachment.

If you have any questions or require additional information, please contact Ms. Diane E.

Aitken at (804) 273-2694.

Serial No.18-312 Docket Nos. 50-280/281 /338/339 Page 2 of 3 Respectfully, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments contained in this correspondence: None

Attachment:

Response to Request for Clarification, Proposed Consolidated Emergency Operations Facility, License Amendment Request COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by M. D. Sartain who is Vice President - Nuclear Engineering and Fleet Support of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this Ig day of S-e..p+Embe.r. 2018.

My Commission Expires: }rt 0..t'"C.V\.- 3 I, lo*z:i DIANE E. AITKEN Notary Public NOTARY PUBLIC REG. #n63114 COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES MARCH 31, 2022

Serial No.18-312 Docket Nos. 50-280/281/338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1.200 Atlanta, GA 30303-1257 Mr. Marcus Harris Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 Mr. James R. Hall NRC Senior Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B 1A 11555 Rockville Pike Rockville, Maryland 20852-2738 Ms. K. R. Cotton-Gross NRC Project Manager- Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station State Health Commissioner Virginia Department of Health James Madison Building - ih floor 109 Governor Street Suite 730 Richmond, VA 23219 State Coordinator of Emergency Management Virginia Department of Emergency Management 10501 Trade Court North Chesterfield, VA 23236