MONTHYEARML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML23058A1442022-12-0909 December 2022 Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22277A7252022-10-0303 October 2022 Additions to Turbine Bldg Wind Load Audit ML22256A3032022-09-13013 September 2022 Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR ML22256A2312022-09-13013 September 2022 Acceptance Email TS Change for New Fuel Framatome Agora and SFP Criticality Review ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR ML22223A1182022-08-0404 August 2022 2022004 - Plant Surry RP Inspection - Document Request Letter E-mail ML22200A1032022-07-19019 July 2022 Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22193A0052022-07-11011 July 2022 Acceptance of Requested Licensing Action: Admin Changes to Technical Specifications ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22161B0052022-06-0909 June 2022 Acceptance Email TSTF 547 LAR ML22137A1622022-05-17017 May 2022 Acceptance of Requested Licensing Action Amendment Turb Bldg. Loading Basis Change License Amendment Request ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b ML21144A2592021-05-0606 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21098A2612021-04-0808 April 2021 Subsequent License Renewal Application, Response to Request for Additional Information Re Environmental Review ML21096A0952021-04-0101 April 2021 Federal Consistency Certification for the VEPCO Surry Power Station Units 1 and 2 Subsequent License Renewal, Us Nuclear Regulatory Commission, Surry County, (DEQ 17-121F) ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D ML21055A5952021-02-24024 February 2021 NMFS to NRC Response to Nrc'S Jan 19, 2021 Letter Regarding an Atlantic Sturgeon Entanglement at Surry 2023-09-12
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21049A2662021-02-16016 February 2021 NRR E-mail Capture - Surry, Units 1 and 2 - Final RAI Concerning the Leak-Before-Break (LBB) LAR ML21049A2672021-02-11011 February 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Draft RAI for the LBB LAR ML21020A1322021-01-19019 January 2021 NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML21020A1332021-01-13013 January 2021 NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML20315A3972020-11-10010 November 2020 Notification of NRC Supplemental Inspection (95001) and Request for Information - RA ML20156A0652020-06-0404 June 2020 NRR E-mail Capture - Final RAIs for Surry U1 Fall 2019 Sgtir Application ML20136A0102020-05-14014 May 2020 NRR E-mail Capture - Final RAIs Regarding Surry Units 1 & 2 LAR to Adopt 10 CFR 50.69 ML20134J1382020-05-0606 May 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20106E9552020-04-15015 April 2020 Program Inspection RFI ML20029D8382020-02-0505 February 2020 Email from T. Tran, Nmss/Drefs/Elrb; Re., Request for Additional Information - Surry SLRA Environmental Review ML20013C7282020-01-0909 January 2020 NRR E-mail Capture - Final RAI Regarding Surry'S TS One-Time 14-Day AOT RSST Cable Replacement LAR ML20007F7952020-01-0606 January 2020 NRR E-mail Capture - Surry RAI Regarding Its Rx Coolant P-T Limits LAR ML19323E2212019-11-13013 November 2019 NRR E-mail Capture - RAI on the SPS Rtb CT Extension LAR ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19296D8982019-10-23023 October 2019 NRR E-mail Capture - RAI for Surry ISTF-411 LAR to Extend Rx Trip Breakers TS CT to 24 Hours ML19283B6252019-10-0202 October 2019 Questions Related to Interval Visual Inspections in Lieu of External Visual Inspections ML19283B6232019-09-20020 September 2019 NRC Surry Draft RAI-Open Cycle Cooling Water (NRC TRP-20 James Gavula) ML19283B6282019-09-19019 September 2019 SLRA - Draft 3rd Round RAI - Selective Leaching (Trp 33) ML19283B6272019-09-18018 September 2019 SLRA - Clarification Call for 3rd Round RAI - Trp 14 (Buried Piping) ML19253C7532019-08-20020 August 2019 SLRA Transmittal Email Attachment 4D Confirmation Letter - August 20, 2019 ML19231A1532019-08-14014 August 2019 Final Requests for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 4 August 14, 2019. L-2018-RNW-0023/000951 ML19217A3582019-08-0202 August 2019 SLRA RAI Transmittal Email Set 3 with Attachments- 2-August 5, 2019 ML19192A2472019-07-10010 July 2019 Final Disposition List of Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application (L-2018-RNW-0023/000951) ML19184A1392019-07-0101 July 2019 SLRA Email Transmittal of Draft RAIs with Attachments - 29JUN2019 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19164A3332019-06-11011 June 2019 Final Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 2 June 11, 2019 ML19176A5262019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments June 11, 2019 ML19163A0182019-06-11011 June 2019 Transmittal Email Surry SLRA Draft RAI- 22 May 2019 ML19163A3962019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments - June 11, 2019 2023-07-06
[Table view] |
Text
From: Thomas, Vaughn Sent: Monday, April 12, 2021 2:30 PM To: gary.d.miller@dominionenergy.com
Subject:
Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR Attachments: Final RAI for the Surry AST LAR Application.docx
- Gary, The attached file constitutes the staffs issuance of the final RAI concerning the Surry LOCA AST LAR. The staff expects the licensees response to the RAI within 30 days from todays date, April 12, 2021 (due date May 10, 2021).
Thanks Vaughn Thomas, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Vaughn.Thomas@nrc.gov 301-415-5897
Hearing Identifier: NRR_DRMA Email Number: 1115 Mail Envelope Properties (BLAPR09MB7409760DAC2295A483E1B198F4709)
Subject:
Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR Sent Date: 4/12/2021 2:29:50 PM Received Date: 4/12/2021 2:29:50 PM From: Thomas, Vaughn Created By: Vaughn.Thomas@nrc.gov Recipients:
"gary.d.miller@dominionenergy.com" <gary.d.miller@dominionenergy.com>
Tracking Status: None Post Office: BLAPR09MB7409.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 472 4/12/2021 2:29:50 PM Final RAI for the Surry AST LAR Application.docx 35321 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO UPDATE THE LOSS OF COOLANT ACCIDENT ALTENATIVE SOURCE TERM DOSE ANALYSIS VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 DOCKET NOS. 50-280 AND 50-281 EPID: L-2020-LLA-0258 Regulatory Basis For Surry Units 1 and 2, the Nuclear Regulatory Commission (NRC) issued the construction permits before May 21, 1971; consequently, Surry Units 1 and 2 were not subject to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," Appendix A, "General Design Criteria [GDC]
for Nuclear Power Plants" (see SECY-92-223, "Resolution of Deviations Identified during the Systematic Evaluation Program," dated September 18, 1992 (Reference 13). Surry Units 1 and 2 meet the intent of the GDC published in 1967 (draft GDC).
The NRC staff considered the following regulatory requirements and guidance during its review of the proposed changes the Surry application: 10 CFR 50.49, "Environmental qualification of electric equipment important to safety for nuclear power plants," and the regulatory guidance provided in NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition."
10 CFR 50.49 requires, in part, licensees to establish a program for qualifying the electric equipment important to safety. The equipment should remain functional during and following design basis events to ensure the integrity of the reactor coolant pressure boundary, The capability to shut down the reactor and maintain it in a safe shutdown condition, or the capability to prevent or mitigate the consequences of accidents that could result in potential offsite exposures. 10 CFR 50.49(e)(1), "Temperature and pressure" requires that, "The time-dependent temperature and pressure at the location of the electric equipment important to safety must be established for the most severe design basis accident during or following which this equipment is required to remain functional."
Request In Section 2, "Proposed Licensing Basis Changes," of the license amendment request (LAR),
the licensee stated:
The proposed changes for a LOCA radiological event are: 1) an increase of the containment depressurization profile, and 2) a reduction of the RWST back leakage limit.
Furthermore, in Section 2.1, "Increased Containment Depressurization Profile," of the LAR, the licensee stated:
The current licensing basis states that the containment will depressurize to 1.0 psig within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and less than 0.0 psig within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The proposed change would require the containment to depressurize to 2.0 psig within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and less than 0.0 psig within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. This change will be reflected in the LOCA dose consequence analysis through an increased containment leak rate as presented in Table 2-1 and Section 3.5.1.
The proposed amendment would increase the containment depressurization profile as described in section 2.1. However, the proposed LAR does not discuss the impact to the environmental qualification of electrical equipment subject to the requirements of 10 CFR 50.49.
Therefore, the NRC staff requests the licensee to discuss the impact of the proposed change on the environmental qualification of electrical equipment.