LER 79-023/03L-0:on 790919,LPCI Loop cross-tie Line Hanger Found Inadequate to Support Design Load.Caused by Improper Installation.Review of All Seismic Class I Sys Underway. Hanger Repaired W/New Anchor Bolts
ML19250A532
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/17/1979
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19250A526 List:
References
LER-79-023-03L, LER-79-23-3L, NUDOCS 7910230600
Download: ML19250A532 (2)


Text

NHC F U. S. NUCLE Ah HLGUL AIUHY COMMlbbtV4

' (7 7 7 ) g M 36G LICENSEE EVENT REPORT LER 79-23/3L CONTROL BLOCK: l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) i 6 lo I i 8l 9I v I TLICENSEE l v i YCODE l S l 1 l@l150le 0 l- 0l0l0l0l0l-l0l0l@l4 LICENSE NUVBEH 25 26 l1 L[1 l1l1l@l$ 7 L Al T $8l@

.NSE T YPE JV 7

CON'T o i 3{j Lj@610l5 0 l0 0 l 2 l 7 l168@l 630 9EVENT l 1 OATE l9 l 7 19/4l@l1 l0 REPORT 75 1 7 l7 l980l@

DATE I 8 60 DOCKET NUVBEH EVENT DESCRl* TION AND PROBABLE CONSEQUENCES h l

O 2 l O 3 l see attached sheet I o 4 l I

o 5 I O 6 _

O 7 l 1

o a I 80 SYSTEV CAUSE CAUSE COY P . VALVE CODE CODE SU8 CODE COYPONENT CODE SU8 CODE SUSCODE lOloj 7 8 lS Fl@ W @ C l@ l Sl U Pl 0l Rl Tl@ W@ W @

9 10 11 12 13 18 13 20 SEQUE N TI AL OCCURRENCE REFOHT REVISION EVENT YE AR REPORT NO. CODE TYPE N O.

LE R AO

@,7g, Oar l 7l 9 -l 24 0 2l 3j l/l 21 28 0l3l 29 JJ Ll l-l 31 l0l 32

_ 21 JJ 2J 16 AKE ACTO O PLANT ET HOURS SLR IT FOR 1 LB SL PPLI E F MAN FA TbRER lDl@ W@ W@ W@ 0] Ol 0l Ol l Yl@ l42Y l@ l43 Al@ Il 2 0 l 747l@

JJ 34 35 36 3 40 41 44 CAUSE DESCRIPTION AND CCRRECTIVE ACTIONS I

i o l I1 Iii I see attached sheet 1 i l 0 I

tilall I

i 4 I 80 7 8 9 STA NPOWER OTHER STATUS ISCO F DISCOVERY DESCHiPTION 32 1 5 lE @ 0l 8 8]@l NA l l Cl@l Investigation relating to NRC Bull. 79-2l ACTIVITY CO TENT HELEASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE l1 l G l [_Zj @u OC RELE ASE]@l NA l NA l 10 44 45 80 1 8 9 11 TERSONNE L E XPOSUnES NUYBE R TYPE DESCRIPTION NA l lilij l 0l 0 0 l@l Z l@[

PEHSONNEL INJUf IES NUYMER D E SC RIP TION NA l 7

i a 8 9 l 0l 0 01@l 11 12 80 LOSS OF OH DAM AGE TO F ACILITY j f g- -

TYPE D E SC RIP TION }

i 9 NA l Z l@l 80 7 8 9 10

""c usE ONov gg CRIPTION 7 p 1 p '3 0 8 N 2 o gfW@ICiTYl NA l lllll lll[l}

68 69 80 ;

7 8 9 10

. . OnWay PHONE:

NAME OF PREPARER

y VTVYS1 05000271 LER 79-23/3L EVENT DESCRIPTION AND PROBABLE CONSEQUENCES During the continuing investigation to determine the adequacy of all Seismic Class I hangers, as described in NRC Bulletin 79-02, RHR-II-16 was determined to be inadequate to support its design load. This hanger is located in the LPCI loop cross-tie line. Tech. Spec. S 2ct ion 3.6. I.1 re-quires all safety-related snubbers to be operable during power operation.

This Tech. Spec. Section was determined to be appropriate, via RO 79-15/3L, since a seismic hanger performs a similar service as a snubber. As allowed by Tech. Spec. Section 3.6.I.2, the hanger was repaired within the 72-hour time period. A similar occurrence was reported to the Com-mission as RO 79-15/3L.

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS The cause of this occurrence is improper installation during con-struction. In accordance with NRC Bulletins 79-2 and 79-14, a complete review of all Seismic Class I systems is underway. This review includes a verification of design loads and support adequacy. Appropriate modifi-cations, if any, will be performed after the reanalysis is completed. In the interim, the hanger was repaired including the installation and veri-fication of new anchor bolts. The original hanger was designed and built by ITT Grinnel Corp.

8 158

.