LER 83-015/01T-0:on 830608,error Discovered in Spacing Table Developed for Support of Copper Piping in Svc Water Sys.Addl Supports Required to Fully Comply W/Ansi B31.1.W/830622 Ltr
ML20024A868
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 06/22/1983
From: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-83-015-01T, LER-83-15-1T, VYV-83-117, NUDOCS 8307010085
Download: ML20024A868 (3)


Text

tRC FORM 366 U. S. NUCLEAR REGULATORY CovMISSION (A LER 83-15/1T

" . LICENSEE EVENT REPORT CONTROL 8 LOCK: l i

l l l l l e

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

(OTil i v i T l v i Y l S i i lgl O i 01 -l LICENSE 14 0 l OiNUMSER 01010l -l 01 0lgl4 25 26 11 l1 l111 lgl l ig LICENSE TYPE JO S F C A T b8 7 8 9 LICENSEE CODE S CON'T E " "

5$RC[60 l L l@l 0l 5 DOCK l 0]ET0NUMBER

] 0l 2l 7l 1 @l0 l6EVENT l0 l8 l 813 l@l0 l 6 REPORT 74 75 l 2 l DATE 2 l 8 l 380 l@

7 8 61 68 69 DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h IO [2l l Yankee Atomic Electric Co. (YAEC) informed Vermont Yankee that an error was I ggg discovered in the development and use of a spacing table developed for support l

,o,,,; of copper piping in the Service Water System. The majority of this piping was l gg installed during the 1981 Refuel Outage. YAEC also informed VY that additional l o 3 l torus attached pipe supports must be installed to complete the requirements of l

[O l7I I n order for Modification of License as amended on 1-14-82. l 101811 I 7 8 , 80 DE CODE SU8C E COMPONENT CODE SU8 CODE SU E 7

O 9 8

lWl^lh W h W @ lSlUlPl0lRlTl@ W @ W @

9 10 11 12 13 18 19 20

_ SEQUE NTI AL OCCURRENCE REPORT R EVISION L EVENTYEAR R EPOR ? NO. CODE TYPE NO.

@ nu'E a $"Is Rl8 25 RO l3 l l_l 23 l0l1l5l 24 26 y l0l1l 29 y

30 b J 22 27 28 31 32 AK N AC O PL NT M T HOURS 22 8 ITT FOR 8. SUPPLi MANUFACTURER =

lX J3

[gl34 Flg Wg 35 l36Zl@ 3/

l0l0l0l0l 40 W@

41 l42N l@ y@

43 lY 44 l0 l0 l447l@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li101l I i i l See Attached. I i 2 I I mI I U_L4 j i I 7 8 9 80 ST S  % POWER OTHER STATUS 015 O RY DISCOVERY DESCRIPTION i s W @ l0l0l0l@l NA l l D l@l Review of Piping Calculations l ACTIVITY CO TENT REMASED OF REM ASE LOCATION OF REMASE @

LLisj l.z_J @ tz_J@l 8 9 10 AMOUNT NA OF ACTIVITY 44 l

45 NA l l 7 tt 80 PERSONNEL EXPOSURES NUV8ER TYPE DESCRIPTION y l0 l 0 l 0 l@l Z l@l NA l eERSONNE t iN;UR'iES 8307010085 830622 NuuSE R oESCRiPfiON@ PDR ADOCK 05000271 l 7 i a 8 e l0l0l0l@l it 12 NA S PDR sa l

LOSS OF OR DAMAGE TO FACILITY h TYPE DESCRIPTION  %./

7 1 9 8 9 W @l 10 NA

/

1!

8 i SO l

{

  1. Y 7

2 0 8 9 ISSUE @oESCRiFTiON @

l 30 Press Release l 68 69 llllllllll lllf 80 is James P. Pelletier 802/257-7711 o NAME OF PREPARER PHONE: ",

t

VTVYS1

....  ; . - 05000271 LER 83-15/IT ~

EVENT DESCRIPTION AND CORRECTIVE ACTIONS The copper service water pipe support spacing table was determined to be inadequate for three reasons: 1) ANSI B31.1 not properly considered, i - 2) main service water header induced loads not considered, and 3) concen-trated loads not properly recognized. Based on 1.5 years experience with i the existing supports and a full baseline inspection conducted during the current refuel outage, we have concluded that the system is functional, t

but will require additional supports to fully comply with all aspects of B31.1. Until full compliance is achieved, interim measures will be

. performed as stated in Confirmatory Action Letter 83-04 dated 6/17/83.

A Request for Extension to the Order for Modification of License for completion of the Torus Long Term Program has been submitted by letter, 3 VYNPC to USNRC, FVY-83-55 dated June 13, 1983. Remaining pipe supports '

will be designed and installed as required to meet the Order for Modification.

)

e r

l 1

}-

4 8

4^

.f x; ~

e , ---w f r - w e v-s - -~~ A d

O

  • VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 VYV 83-117 June 22, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 ATTENTION: Dr. Thomas E. Murley, Regional Administrator

REFERENCE:

Operating License DPR-28 Docket No. 50-271 Reportable Occurrence No. LER 83-15/1T

Dear Sir:

As defined by Technical Specifications for the Vermont Yankee Nuclear Power Station, Section 6.7.B.:1, we are reporting the attached Reportable Occurrence as LER 83-15/1T.

Very truly yours, ames P. Pelletier Plant Manager IDDt/dre Y'

t_.

h t\

t l