05000271/LER-1983-002-02, /02T-0:on 830108,discovered Leak in 2-inch Stainless Steel Schedule 160 Isolable Section of Reactor Drain Line.Cause Unknown.Leaking Elbow Replaced w/304L Type Stainless Steel Matl Per NUREG-0313 Requirements

From kanterella
(Redirected from ML20028F374)
Jump to navigation Jump to search
/02T-0:on 830108,discovered Leak in 2-inch Stainless Steel Schedule 160 Isolable Section of Reactor Drain Line.Cause Unknown.Leaking Elbow Replaced w/304L Type Stainless Steel Matl Per NUREG-0313 Requirements
ML20028F374
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/21/1983
From: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20028F371 List:
References
LER-83-002-02T, LER-83-2-2T, NUDOCS 8302010297
Download: ML20028F374 (2)


LER-1983-002, /02T-0:on 830108,discovered Leak in 2-inch Stainless Steel Schedule 160 Isolable Section of Reactor Drain Line.Cause Unknown.Leaking Elbow Replaced w/304L Type Stainless Steel Matl Per NUREG-0313 Requirements
Event date:
Report date:
2711983002R02 - NRC Website

text

r NjCrowan u.s. NuctEAxE:utATonY Commission I

LidENSEE EVENT REPORT LER 83-02/1T CONTROL f LOCK: l l

l l

l l

(PLEAss PRINT OR TYPE ALL REQUIRED.NPORMATIONI l

i FoTil I v ! Tl v i Yi SI ll@l 0101 -1 0I 01 01 01 01 -1010 ;@l 4 l 1l 1l 1l 1lgl_ l lg 7

8 W LICENSEE CODE 14 15 LICENSE NUMBER 21 26 LICENSE TYPE J0 61 CAT SS CCN'T I,0 I I sour $ l Ll@l015 l0 l0 l0 l 217 l1 l@l 0 l 1 l 0 l 8 l 8 l 3 l@l 0l 1l 2l 1l 8l 3l@

8 63 61 DOCKET NUM8 ER 68 69 EVENT O ATE 74 76 REPORT DATE 80 EVENT OESCRIPTION AND PROBABLE CONSEQUENCES h Iol2l l While performing routine surveillance of the drywell during shutdown, indication i

[Oi3l l of a leak in a 2" SS schedule 160 isolable section of the reactor drain line was I

j lo l4 l l discovered. lais leak is contrary to Tech. Spec. 3.6.E.

There were no adverse l

I l o I s l I consequences to the public health an_d safety.

lo is i i 1

10171i l

L9.J!O I I

1 7

8 9 80

  • $'E

"#'dE stsEE C0 COMPONENT CODE SUS ODE 5

10191 lclGlh (2Jh W h lPlIlPlElXlXl@ W @ W @

7 8

9 to 11 12 12 14 19 10 UEQUE NTI AL OCCURRENCE REPORT REVISION EVENTvEAR REPORT NO.

CODE TYPE NO.

C").. LE R RO,lJ1 al al l-l l 010 l 2 I l/l 1012l lT I l-j [0_j

,at;g i

u 22 23 24 J6 27 24 29 30 31 JJ AK N AC ON CNPLANT HOUR $ 22 38 IT PO b u.

UPPLI MANUPACTURER i

W@lX l@

l Z l@

l Z l@

l0l0l0lUl W@

l Y l@

l A lg l E l 0 l 6 l 5 l@

JJ J4 J3 36 3J 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 11 I o l IThe exact cause of the pipe crack is unknown at present. The leaking elbow was l

LL.L.' ] l replaced with a 304L type stainless steel material which meets the intent of NUREG I

iii:.i 10313. Additional examinations of the vessel drain line were performed to verify the l lil3; l integrity of the pressure boundary.

l L.'_L4 ] I I

7 8 9 80 sTA 5

% POWE R OTHER STATUS bis O RY DISCOVERY DESCRIPTION 11 isI W @ l0l0l0l@l NA l

l B l@l Routine Surveillance l

AdTIVITY CC TENT aELEAsEo OP RELEASE AMOUNT OP ACTiviTV LOCATION OF RELEASE l1 l6I W h,lzl@l NA l

l NA l

l PERsosNEt ExPOsuSEs OEsCArPTiON@

suveE R TvPE l 1 l il l 01 O l 0 l@l Zl@l NA l

PERsOsse'L iN;u'd'Es oEsCRiPTiONh i

NuveER 11 Isll0l0l0l@l NA l

I 7

8 9 11 12 80

'M*E * "oEs'C$^IT ON'''**h l 1 l 9 l l Z l@l NA l

7 d 3 1 'J SO

,ssuE @loEsCRiPTiON O NRC USE ONLY NA l-lllllllllllll{

[ 2 [o,LJ 7

8 3 to 68 69 80 3 8302010297 830121, James P. Pelletier (802) 257-7711 2

t PHONE:

PDR ABCCK 05000274 s

PDR

~.

-=

1

=

,.. o VTVYS1 05000271 LER 83-2/1T CAUSE DESCRIPTION AND CORRECTIVE ACTION The exact cause of the pipe crack is unknown at present. The leaking elbow was replaced with a 304L type stainless steel material which meets the intent of NUREG 0313. Additional examinations of the vessel drain line were performed to verify the integrity of the pressure boundary. This included 4 welds PT'd and 6 welds VT'd and no-further leaks were discovered. An additional walk down of the nonisolable portion of the piping was. conducted and inspection was performed for evidence of leakage. No additional evidence of leakage was found.

i The failed elbow was sent to the Battelle Laboratories for analysis 'and failure mode determination. Upon receiving the Battelle Report, a cause description and summary of the corrective actions taken will be provided in a follow up report.

i