MONTHYEARML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20141A1081986-03-31031 March 1986 Part 21 Rept 134 Re Potential Defect in K-1 Relay in Generator Voltage Regulator.Initially Reported on 860219. Corrective Action Must Take Into Account Equipment Operating Range of 100-137.5-volt Dc ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153G1021986-02-19019 February 1986 Part 21 Rept Re Potential Defect in K-1 Relays of Dsr or Dsrv Standby Diesel Generators Mfg by Gould/Ite.Relays Have Incorrect Voltage Range.Dc Voltage Source or Voltage Regulator Circuitry Requires Mod ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20084G3531984-04-19019 April 1984 Final Deficiency Rept Re Pacific Scientific Co Shock Arrestor Capstan Spring Tang.Initially Reported on 831013. Bellefonte Snubbers Will Be Replaced & Hartsville Snubbers Returned to Vendor for Repair.Springs Subj to Insp ML20087J6661984-03-0808 March 1984 Followup Part 21 Rept Re Nuclear Valve/Actuator Stroking Time Possibly Lengthened Beyond 15 When Using hydrocarbon-based Lubricants.Ltrs to Affected Utils Encl ML20081C0171984-03-0101 March 1984 First Interim Deficiency Rept Re Loose Drive Hubs on Overspeed Governor Drive Shaft on Transamerica Delaval,Inc Diesels.Initially Reported on 840203.Svc Info Memo Being Reviewed for Approval.Also Reportable Per Part 21 ML20079N5121984-01-23023 January 1984 Final Deficiency Rept Re Delaval Problem W/Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Capscrews Replaced Per Approved Procedure & Drawings Revised to Reflect Shorter Length ML20083H1921984-01-0505 January 1984 First Interim Deficiency Rept Re Transamerica Delaval,Inc QA Program.Initially Reported on 831206.Final Configuration for Control Cabinet Indicates Drawing Revs K,L & M Not Incorporated.Also Reportable Per Part 21 ML20083E1981983-12-20020 December 1983 First Interim Deficiency Rept Re Fuel Oil Line Rupture in Transamerica Delaval,Inc Generator.Initially Reported on 831121.Const Activities Deferred for Hartsville Units 1 & 2. Next Rept Expected by 840413.Also Reported Per Part 21 ML20078B3811983-09-0606 September 1983 Part 21 Rept Re Matrix Actuator Model 33122-SR 80.Mounting Bolts Loosened & Spring Return Cylinder Began to Separate from Ctr Body of Actuator.Investigation Being Conducted by Xomox Corp ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20083L9751983-05-27027 May 1983 Part 21 Rept Re Failure of Circuit Breakers During Environ Testing.Test Results Indicate That Temp Sensitivity Problem May Be Generic to All Ite Imperial Corp thermal-magnetic Circuit Breakers Calibr for 40 C Svc ML20076H1601983-05-23023 May 1983 Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed ML20074A2041983-04-26026 April 1983 Interim Deficiency Rept Re Misapplication of Ite Gould Circuit Breakers in post-LOCA Hydrogen Recombiners Supplied by Rockwell Intl.Initially Reported on 830328.Matter Under Investigation.Final Rept by 830808.Reported Per Part 21 ML20069K6811983-04-18018 April 1983 First Interim Deficiency Rept Re Pipe Support Spacing Utilizing Alternate Criteria.Initially Reported on 830317. Investigation Postponed Until Design & Const Resumed ML20073J8051983-04-12012 April 1983 Third Interim Deficiency Rept Re Nonconservative Calculation Method for General Const Spec G-32 Violations.Initially Reported on 820528.Design Std Being Revised to Clarify Use of Factors of Safety in DS-C6.1 ML20073P1281983-04-0808 April 1983 Second Interim Deficiency Rept Re Problem W/Delaval Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Util Continuing to Attempt to Acquire Necessary Info from Transamerica Delaval,Inc.Also Reported Per Part 21 ML20072R3291983-03-28028 March 1983 Interim Deficiency Rept 1 Re CF Braun Documentation Control Program Failure to Monitor Closeout of Final Design Change Control Documents.Initially Reported on 830302.Final Rept Due Upon Commencement of Const.Also Reportable Per Part 21 ML20072Q9571983-03-28028 March 1983 First Interim Deficiency Rept Re Failure of Util Div of Engineering Design to Provide Bolt Tightening Requirements to Div of Const.Initially Reported on 830228.Const Deferred. Rept to Be Submitted When Const Decision Made ML20074A2221983-03-11011 March 1983 Part 21 Rept Re Failure of post-LOCA Hydrogen Recombiner Component During IEEE-323 Qualification Program.Circuit Breaker Not Properly Selected for Specific Application.Plant Operators Notified of Deviation ML20028G0821983-01-31031 January 1983 Final Deficiency Rept Re Itt Grinnell Failure to Use Proper Testing Methods.Initially Reported on 810304.Spool Pieces re-examined Per ASME Section III,1974 Edition,Winter Addenda 1975 Code.Condition No Longer Reportable Per 10CFR50.55(e) ML20083P6301983-01-28028 January 1983 Second Revised Final Deficiency Rept Re Welds on Component Cooling Water HX Mfg by Joseph Oat Corp.Initially Reported on 810306.Defects Removed by Grinding.Also Reported Per Part 21 ML20083M6711983-01-24024 January 1983 First Interim Deficiency Rept Re Potential Deterioration of Isoprene Gaskets on Standby Diesel Generator.Initially Reported on 821217.Transamerica Delaval,Inc Changed Matl for Drive Element to Neoprene.Also Reportable Per Part 21 ML20083M6651983-01-24024 January 1983 First Interim Deficiency Rept Re Residual Stress on Diesel Generator Engine Piston Skirt Castings.Initially Reported on 821215.Removal of Piston Skirt for Insp Deferred Until Restart of Design & Const.Also Reportable Per Part 21 ML20028C2481982-12-30030 December 1982 First Interim Deficiency Rept Re Insufficient Length of Starting Air Valve Assembly Capscrews.Initially Reported on 821201.Transamerica Delaval,Inc Changed Designed Length of Capscrew.Next Rept by 830415.Also Reportable Per Part 21 ML20070F0121982-12-13013 December 1982 Final Deficiency Rept Re Atlas QA Documentation on Auxiliary & Fuel Bldg Structural Steel.Initially Reported on 811113. QA Hold Placed on Suspect Items Until Further Testing Performed.Also Reportable Under Part 21 ML20028A4891982-11-0909 November 1982 Final Deficiency Rept Re Storage & Preventive Maint Program Deficiencies.Initially Reported on 821007.Pipe Caps Replaced,Piping Placed on Support,Tanks Moved to Inside Storage in Upright Position & Conditions & Program Reviewed ML20065R3701982-10-14014 October 1982 Interim Deficiency Rept Re Deferral of Const Activities. Initially Reported on 820623.Commitments Made in Rept,Audit Findings & Response to Violations Deferred Until Restart of Design & Const ML20065H8751982-09-27027 September 1982 First Interim Deficiency Rept Re Failure to Consider Seismic & Inertial Loadings on Ladders,Platforms & Walkways. Initially Reported on 820826.Const Activities Deferred Until Decision Re Const Completion Reached ML20027B8451982-09-20020 September 1982 First Interim Deficiency Rept Re QA Deficiencies on Allis- Chalmers Butterfly Valves.Initially Reported on 820823.Const Activities Deferred.Final Rept Will Be Submitted After Final Decision Re Completion or Cancellation of Project ML20063L3721982-09-0202 September 1982 First Interim Deficiency Rept Re Failure of Kerotest Valves to Meet Seismic Criteria.Initially Reported on 820804. Negotiations Underway W/Contractor for Return of Valves. Const Activities Deferred.Also Reportable Per Part 21 ML20063J9461982-08-27027 August 1982 Final Deficiency Rept Re Source Insp.Initially Reported 810120.Weld Inspectors Trained & Certified,Shop Surveillance Increased & Personnel Relocated to Provide More Intense Program of Source Insp.Full Compliance Achieved 820514 ML20055A0731982-07-0707 July 1982 First Interim Deficiency Rept Re Nonconformance in Intake Pumping Station Door & Hatch Design,Initially Reported 820604.Final Rept Will Not Be Issued Until Decision to Resume Facility Const Reached ML20055A0791982-07-0606 July 1982 First Interim Deficiency Rept Re Possible Installation of Bolt Anchors in Grant Areas,Initially Reported 820610. Investigation Postponed Until Const Resumed ML20054N0821982-07-0101 July 1982 Final Deficiency Rept Re Excessive Stress on Spray Pond Supply & Bypass Headers,Initially Reported on 820218. Piping Layout Revised & Drawings Revised/Reissued.Seismic Analysis Complete & Isometrics Issued ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20054J9111982-06-23023 June 1982 Part 21 Rept Re Potential Defect in Couplings Drive Element of Dsrv or Dsr Standby Diesel Generator.Affected Licensees Will Be Notified No Later than 820715 ML20054J9211982-06-22022 June 1982 Seventh Interim Deficiency Rept for Deficiencies 2,3,5 & 14 Re QA Audit M80-7,initially Reported 800923.Const Activities Deferred Until Sufficient Info Compiled ML20054H6821982-06-18018 June 1982 Part 21 Rept Re Pneumatic Actuator Yoke Failure.List of Other Projects W/Similar Equipment Encl ML20054G1121982-06-11011 June 1982 Fourth Interim Deficiency Rept Re Link Rod assembly-Delaval Diesels.Due to Const Deferment Final Deficiency Rept Will Not Be Issued Pending Final Decision on Future of Projects. Also Reportable Per Part 21 ML20054G4161982-06-10010 June 1982 Final Deficiency Rept Re QA Deficiencies at Morgan Engineering,Inc,Initially Reported on 820512.Contract W/Morgan Engineering Canceled Due to Deferred Status of Const ML20054E4081982-06-0101 June 1982 First Interim Deficiency Rept Re Split in Biological Shield Wall,Initially Reported on 820429.Investigation Postponed Until Const Activities for Project Resume.No Final Rept Will Be Submitted Until Decision Made Re Continuation of Const ML20054E4111982-06-0101 June 1982 Fourth Interim Deficiency Rept Re Bethlehem Steel Co Galvanized A325 Bolts,Initially Reported on 811029.Const Activities Deferred Until Sufficient Info Indicates Whether Project Should Be Completed or Canceled 1993-12-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20153E5011988-08-29029 August 1988 NRC Staff Evaluation of Site Stabilization Plan for Withdrawal of CPPR-172 & CPPR-173 ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20141A1081986-03-31031 March 1986 Part 21 Rept 134 Re Potential Defect in K-1 Relay in Generator Voltage Regulator.Initially Reported on 860219. Corrective Action Must Take Into Account Equipment Operating Range of 100-137.5-volt Dc ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153G1021986-02-19019 February 1986 Part 21 Rept Re Potential Defect in K-1 Relays of Dsr or Dsrv Standby Diesel Generators Mfg by Gould/Ite.Relays Have Incorrect Voltage Range.Dc Voltage Source or Voltage Regulator Circuitry Requires Mod ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20084G3531984-04-19019 April 1984 Final Deficiency Rept Re Pacific Scientific Co Shock Arrestor Capstan Spring Tang.Initially Reported on 831013. Bellefonte Snubbers Will Be Replaced & Hartsville Snubbers Returned to Vendor for Repair.Springs Subj to Insp ML20087J6661984-03-0808 March 1984 Followup Part 21 Rept Re Nuclear Valve/Actuator Stroking Time Possibly Lengthened Beyond 15 When Using hydrocarbon-based Lubricants.Ltrs to Affected Utils Encl ML20081C0171984-03-0101 March 1984 First Interim Deficiency Rept Re Loose Drive Hubs on Overspeed Governor Drive Shaft on Transamerica Delaval,Inc Diesels.Initially Reported on 840203.Svc Info Memo Being Reviewed for Approval.Also Reportable Per Part 21 ML20079N5121984-01-23023 January 1984 Final Deficiency Rept Re Delaval Problem W/Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Capscrews Replaced Per Approved Procedure & Drawings Revised to Reflect Shorter Length ML20083H1921984-01-0505 January 1984 First Interim Deficiency Rept Re Transamerica Delaval,Inc QA Program.Initially Reported on 831206.Final Configuration for Control Cabinet Indicates Drawing Revs K,L & M Not Incorporated.Also Reportable Per Part 21 ML20083E1981983-12-20020 December 1983 First Interim Deficiency Rept Re Fuel Oil Line Rupture in Transamerica Delaval,Inc Generator.Initially Reported on 831121.Const Activities Deferred for Hartsville Units 1 & 2. Next Rept Expected by 840413.Also Reported Per Part 21 ML20078B3811983-09-0606 September 1983 Part 21 Rept Re Matrix Actuator Model 33122-SR 80.Mounting Bolts Loosened & Spring Return Cylinder Began to Separate from Ctr Body of Actuator.Investigation Being Conducted by Xomox Corp ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20024C1401983-06-30030 June 1983 Engineering Evaluation Rept:Investigation & Grouting of Leaks Associated W/Tendon Sheaths H32-009 & H32-011,Unit 2 Containment Bldg. ML20073S8641983-05-31031 May 1983 Details of Deferral Plans for Hartsville Nuclear Plant a ML20083L9751983-05-27027 May 1983 Part 21 Rept Re Failure of Circuit Breakers During Environ Testing.Test Results Indicate That Temp Sensitivity Problem May Be Generic to All Ite Imperial Corp thermal-magnetic Circuit Breakers Calibr for 40 C Svc ML20076H1601983-05-23023 May 1983 Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed ML20074A2041983-04-26026 April 1983 Interim Deficiency Rept Re Misapplication of Ite Gould Circuit Breakers in post-LOCA Hydrogen Recombiners Supplied by Rockwell Intl.Initially Reported on 830328.Matter Under Investigation.Final Rept by 830808.Reported Per Part 21 ML20069K6811983-04-18018 April 1983 First Interim Deficiency Rept Re Pipe Support Spacing Utilizing Alternate Criteria.Initially Reported on 830317. Investigation Postponed Until Design & Const Resumed ML20073J8051983-04-12012 April 1983 Third Interim Deficiency Rept Re Nonconservative Calculation Method for General Const Spec G-32 Violations.Initially Reported on 820528.Design Std Being Revised to Clarify Use of Factors of Safety in DS-C6.1 ML20073P1281983-04-0808 April 1983 Second Interim Deficiency Rept Re Problem W/Delaval Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Util Continuing to Attempt to Acquire Necessary Info from Transamerica Delaval,Inc.Also Reported Per Part 21 ML20079E9911983-03-31031 March 1983 Caseload Forecast ML20072R3291983-03-28028 March 1983 Interim Deficiency Rept 1 Re CF Braun Documentation Control Program Failure to Monitor Closeout of Final Design Change Control Documents.Initially Reported on 830302.Final Rept Due Upon Commencement of Const.Also Reportable Per Part 21 ML20072Q9571983-03-28028 March 1983 First Interim Deficiency Rept Re Failure of Util Div of Engineering Design to Provide Bolt Tightening Requirements to Div of Const.Initially Reported on 830228.Const Deferred. Rept to Be Submitted When Const Decision Made ML20074A2221983-03-11011 March 1983 Part 21 Rept Re Failure of post-LOCA Hydrogen Recombiner Component During IEEE-323 Qualification Program.Circuit Breaker Not Properly Selected for Specific Application.Plant Operators Notified of Deviation ML20028G0821983-01-31031 January 1983 Final Deficiency Rept Re Itt Grinnell Failure to Use Proper Testing Methods.Initially Reported on 810304.Spool Pieces re-examined Per ASME Section III,1974 Edition,Winter Addenda 1975 Code.Condition No Longer Reportable Per 10CFR50.55(e) ML20083P6301983-01-28028 January 1983 Second Revised Final Deficiency Rept Re Welds on Component Cooling Water HX Mfg by Joseph Oat Corp.Initially Reported on 810306.Defects Removed by Grinding.Also Reported Per Part 21 ML20083M6711983-01-24024 January 1983 First Interim Deficiency Rept Re Potential Deterioration of Isoprene Gaskets on Standby Diesel Generator.Initially Reported on 821217.Transamerica Delaval,Inc Changed Matl for Drive Element to Neoprene.Also Reportable Per Part 21 ML20083M6651983-01-24024 January 1983 First Interim Deficiency Rept Re Residual Stress on Diesel Generator Engine Piston Skirt Castings.Initially Reported on 821215.Removal of Piston Skirt for Insp Deferred Until Restart of Design & Const.Also Reportable Per Part 21 ML20028C2481982-12-30030 December 1982 First Interim Deficiency Rept Re Insufficient Length of Starting Air Valve Assembly Capscrews.Initially Reported on 821201.Transamerica Delaval,Inc Changed Designed Length of Capscrew.Next Rept by 830415.Also Reportable Per Part 21 ML20070F0121982-12-13013 December 1982 Final Deficiency Rept Re Atlas QA Documentation on Auxiliary & Fuel Bldg Structural Steel.Initially Reported on 811113. QA Hold Placed on Suspect Items Until Further Testing Performed.Also Reportable Under Part 21 ML20028A4891982-11-0909 November 1982 Final Deficiency Rept Re Storage & Preventive Maint Program Deficiencies.Initially Reported on 821007.Pipe Caps Replaced,Piping Placed on Support,Tanks Moved to Inside Storage in Upright Position & Conditions & Program Reviewed ML20069Q3701982-10-31031 October 1982 Socioeconomic Monitoring & Mitigation Rept ML20069Q3771982-10-31031 October 1982 Const Employee Monitoring Errata Rept ML20065R3701982-10-14014 October 1982 Interim Deficiency Rept Re Deferral of Const Activities. Initially Reported on 820623.Commitments Made in Rept,Audit Findings & Response to Violations Deferred Until Restart of Design & Const ML20065H8751982-09-27027 September 1982 First Interim Deficiency Rept Re Failure to Consider Seismic & Inertial Loadings on Ladders,Platforms & Walkways. Initially Reported on 820826.Const Activities Deferred Until Decision Re Const Completion Reached ML20027B8451982-09-20020 September 1982 First Interim Deficiency Rept Re QA Deficiencies on Allis- Chalmers Butterfly Valves.Initially Reported on 820823.Const Activities Deferred.Final Rept Will Be Submitted After Final Decision Re Completion or Cancellation of Project ML20069D5241982-09-10010 September 1982 Socioeconomic Monitoring & Mitigating Rept,Sept 1981 ML20063L3721982-09-0202 September 1982 First Interim Deficiency Rept Re Failure of Kerotest Valves to Meet Seismic Criteria.Initially Reported on 820804. Negotiations Underway W/Contractor for Return of Valves. Const Activities Deferred.Also Reportable Per Part 21 ML20063J9461982-08-27027 August 1982 Final Deficiency Rept Re Source Insp.Initially Reported 810120.Weld Inspectors Trained & Certified,Shop Surveillance Increased & Personnel Relocated to Provide More Intense Program of Source Insp.Full Compliance Achieved 820514 ML20055A0731982-07-0707 July 1982 First Interim Deficiency Rept Re Nonconformance in Intake Pumping Station Door & Hatch Design,Initially Reported 820604.Final Rept Will Not Be Issued Until Decision to Resume Facility Const Reached ML20055A0791982-07-0606 July 1982 First Interim Deficiency Rept Re Possible Installation of Bolt Anchors in Grant Areas,Initially Reported 820610. Investigation Postponed Until Const Resumed ML20054N0821982-07-0101 July 1982 Final Deficiency Rept Re Excessive Stress on Spray Pond Supply & Bypass Headers,Initially Reported on 820218. Piping Layout Revised & Drawings Revised/Reissued.Seismic Analysis Complete & Isometrics Issued ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects 1993-12-09
[Table view] |
Text
~ . . _ . . . . . .
- ' O 0 0lD HARTSVILLE NUCLEAR PIANTS A AND B PHIPPS BEND NUCLEAR PLANT .
YELLOW CREEK NUCLEAR PLANT PIPE ELBOWS MADE OF UNSPECIFIEIT MATERIAL REPORT NO. 1 (FINAL)
' NCR's HNP-A-O'47, PBNP-015, AND TCNP-007 On April 25 and May 1, 1979, TVA notified NRC-0IE Region II Inspector, M. C. Hunt, that the subject NCR's for Phipps Bend and Yellow Creek Nuclear Plants, respectively, were potentially reportable. On May 24, 1979, TVA notified Inspector T. E. Burdette that the NCR for Hartsville Nuclear Plants A and B was reportable. This is the final report on the subject NCR's.
Description of Deficiency Piping fittings made by Tube Turns Division of Cheatron Corporation (Tube Turns) and supplied to TVA by Guyon Alloys Inc. (Guyon) were fabricated from a heat of U.S. Steel SA-234 pipe in which oil drill pipe became mixed. The oil drill pipe (API-SAC) is a high strength, brittle material containing molybendium and approximately twice the carbon content of SA-234. '!be nonconforming pipe fitting. are 4-inch schedule 40 elbows designated as SMLS ASME SA-234 Grade VPB material iros heat lot V6719.
A total of 82 questionable fittings were shipped to Phipps Bend Nuclear Plant from Nov. 13, 1978, through Dec. 27, 1978. Seven of these fittings were shipped to Yellow Creek Nuclear Plant on March 1, 1979, from the stock of 52 received at the Hartsville Nuclear Plant on November 15, 1978.
Cause of Deficiency U.S. Steel, Lorain Works in Lorain, Ohio, fabricated a heat of API-5AC pipe on which the heat identity number was incorrect by one digit giving it the same heat identity number of SA-234 material. U.S. Steel set the incorrectly marked material aside for remarking. However, some or all of the incorrectly marked material became mixed with the properly marked SA-234 material. All of this material was shipped to Tube Turns marked as heat lot W6719 and was fabricated into pipe fittings.
2309 131 7 9 0 619 M O-
' '~ ~ ~~'~
h j r
This situation indicates that U.S. Steel had a breakdown in the identifi-cation and control of material portion of their QA program.
Safety Implications ,
One or more of the nonconforming elbows could have been used in any safety system requiring 4-inch piping had this situation remained uncorrected. The nonconforming elbows would have a higher probability of failure due to their brittleness. This failure in combination with a single active component failure could prevent a safety system from performing its intended safety function.
Corrective Actions A memorandum was sent on May 11, 1979, from the Director of Engineering Design to all TVA nuclear plant construction sites requesting that they examine their records for receipt of material with heat code W6719, and if they find any to initiate a nonconformance report. To date, the following actions have been taken:
Hartsville Nuclear Plant The 45 elbows of heat W6719 shipped to Hartsville excluding those shipped to Yellow Creek were identified in the receiving warehouse after noti-fication by an April 3, 1979, telecon with Guyon. These elbows were listed on an OS or D (over, short, or defective) report, segregated, and shipped back to Tube Turns on April 12, 1979.
- Phipps Bend Nuclear Plant A total of 82 fittings of heat W6719 were shipped to Phipps Bend. Since three of these fittings were installed in piping assemblies in the pipe shop, U.S. Steel sent a representative to the site to check each of the fittings. On April 11, 1979, the U.S. Steel representative spark tested each of the 82 fittings onsite and found one which was made of the non-conforming material. (Note: In this spark test the spark indicates the presence of molybdenum and high carbon content, approximately 0.40 percent, in the nonconforming material and the presence of silicon and low carbon, 0.20 percent, in the SA-234 material.) The one nonconforming elbow was taken back to U.S. Steel by the representative. The other 81 elbows will be used in future piping assemblies.
Yellow Creek Nuclear Plant The seven elbove of heat W6719 were identified, placed in nonconforming status, regregated, and are awaiting shipping instructions from Hartsville.
- These elbows will be shipped back to Tube Turns. The elbows will not be used in piping at Yellow Creek Nuclear Plant. .
2309 132
e- ,
/
Means Taken to Prevent a Recurrence Discussions have been held between representatives of TVA and representatives of Guyon, Tube Turns, and U.S. Steel since identification of the deficiency.
U.S. Steel indicated they have discussed the problem in internal QA meetings emphasizing the importance of 100 percent accuracy in material identification and control. Also, U.S. Steel representativep are investigating the situation and will prepare an internal report which will contain recournendations of any possible corrective actions which could be taken in the area of material identification and control.
2309 133 O
e O
9