Responds to NRC 800213 Ltr Re Violations Noted in IE Insp Repts 50-498/80-01 & 50-499/80-01.Corrective Actions:Rept Will Be Prepared & Reporting Procedures Changed
ML19309H781
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/19/1980
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19309H770 List:
References
ST-HL-AE-429, NUDOCS 8005190709
Download: ML19309H781 (2)


Text

-

g ,

8005190 @ 9 U

The Light NE f Houston Lighting & Power P.O. Box 1700 Houston. Texas 77001 (713)228-9211 March 19, 1980 ST-HL-AE-429 SFN: C-0570 Mr. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Pla::a Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION RESPONSE TO NRC INSPECTION FINDING DOCKET NOS. 50-498/80-01 AND 50-499/80-01

Dear Mr. Seidle:

1 In your letter of February 13, 1980, you stated that Houston Lighting 6 Power Company (HLSP) had failed to provide timely notification of a re-portable deficiency. Specifically, you found that HLSP did not inform the i

Region IV office within the prescribed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of damage to the steel l

liner plate in the Unit 1 Reactor Containment Building. l The following information is provided in response to your letter.

A. Failure to Provide Timely Notification The damage to the liner plate was documented on Nonconformance Report (NCR) S-M3759-A which was initiated on January 16, 1980.

The NCR was subsequently submitted tc the Project Quality Assurance Supervisor to be reviewed ao a potentially reportable item pursuant to 10CFR50.55(e). Based upon his review and upon a evaluation of the safety significance ky the Project Licens-in Engineer, it was concluded that the liner plate damage was  !

not reportable in accordance with the criteria stated in 10CFR50.55(e). Therefore, the NRC was not notified of the incident.

B. Corrective Action Based upon the concern noted by the NRC in the referenced Inspection Report, HLSP is preparing a written report on the liner plate bulge which will address the criteria outlined in 10CFR50. 55 (e) (3) .

Houston Ughting & Power Company Mr. Seidle March 19, 1980 Page Two C. Recurrence Control Subsequent to the Inspection Report, the NRC IE Region IV Office provided HL6P revised criteria for meeting the 24-hour deadline imposed by 10CFR50.55(e)(2). According to these new criteria, HL6P is to report any significant occurrence to t:ie NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after they are made aware of the problem. Should the occurrence be determined not reportable at a later date, then HL6P will submit a written response to the NRC stating that the occurrence is not reportable. Should the Incident Review Committee de-cide that the incident or occurrence is reportable, then a written report will be submitted as specified by 10CFR50. 55 (e) (3) .

The engineering procedure for handling reportable deficien-cies will be revised to provide for the Site QA Supervisor to notify the Resident Reactor Inspector within the pre-scribed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of incidents considered "possibly" or "potentially" reportable. The draft procedure is attached.

D. Date When Full Compliance Will Be Achieved Until the revised procedure for reporting 10CFR50.55(e) items is approved, HL6P will follow the attached draft procedure. The engineering procedure for handling report-able deficiencies will be issued by April 11, 1980. A first interim report on the liner bulge will be issued by March 28, 1980.

Ve y yo 9 ,

ja . /me, E. A. Turner, Vice President Power Plant Construction 4 Technical Services EAT: mag Attachments cc: Messrs. G. W. Oprea, Jr. R. A. Fra:ar M. L. Borchelt (CPL) W. N. Phillips R. L. Range (CPL) L. D. Wilson J. B. Poston (CPS) G. B. Painter R. C. Mecke (CPS) M. D. Schwarz (B6B) l R. L. - Hancock (COA) C. G. Thrash (BGB) {

M. C. Nitcholas (COA) H. S. Phillips.(NRC) l H. R. Dean J. R.- Geurts (B6R)

R. L. Waldrop C. W. Vincent (B6R) l C. L. McNeese STP RMS l D. G. Barker {

- , _