Revised Monthly Operating Rept for Aug 1980
ML20003A374
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030573
Download: ML20003A374 (1)


Text

?. . . .

a .

Rev. 1 - 1/22/81

~

OPERATING DATA REPORT l

)

DOCKET NO. 50-346 i DATE September 9, 198:

COMPLETED BY Bilal Sarsour

. TELEPHONE 419-259-5000, Extension 251 OPERATING STATUS Notes

1. Unit Name:

Davis-Besse Unit 1 August. 1980 l

2. Reporting Period: '

2772

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 925 906
5. Design Electrical Rating (Net MWe):

934

6. Maximum Dependable Capacity (Gross MWe):

890

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power LevelTo Which Restricted,if Any(Net MWe):
10. Reasons For Restrictions.If Any:

This Montti Yr to-Date Cumulative 744 5,855 26,380

11. Hours in Reporting Period 0 2.078 13.042
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 0 2.8752 1l 0 2.008.7 11.883.0
14. Hours Generator On-Line 0 1,728 0
15. Unit Reserve Shutdown Hours 24,886.812 '.

0 4,687,305

16. Gross Thermal Energy Generated (MWH) 0 1,583,559 8.307.070
17. Gross Electrical Energy Generated (MWH) , _ ,
18. Net Electrical Energy Generated (MWH) 0 1.483.787 7.654.16s 0 34.3 45.8
19. Unit Service Factor 0 34.3 52.9
20. Unit Availability Factor 0 28.5 14_R
21. Unit Capacity Factor (Using MDC Net) 0 28.0 34.2
22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

None September 15, 1980 e

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed

~

j INITIAL CRITICALITY a INITI AL ELECTRICITY

  • COMMERCIAL OPERATION ,

i 610 203 0 *stS ,,p,,

. . - - - - - - . - . . . . . . -. - . . - - . . - . - .- .