ML20003A385

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1980
ML20003A385
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030590
Download: ML20003A385 (1)


Text

~

7

~

0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO. 50-346 DATE December 8, 1980 COMPLETED BY Bilal Sarsour TELEPHONE A14-754-5000, Ext.

OPERATING STATUS

1. Unit Name: Davis-Besse Unit 1 Notes
2. Reporting Period: November, 1980
3. Licensed Thermal Power (MWt): 2772
4. Nameplate Rating (Gross MWe): 925
5. Design Electrical Rating (Net MWe): 906
6. Maximum Dependable Capacity (Gross MWe): 934
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr to.Date Cumulative

11. Hours in Reporting Period 720 8,040 28,565
12. Number Of Hours Reactor Was Critical 684.7 2,762.7 13,726.7
13. Reactor Reserve Shutdown flours '6.3 6.3 2,882.1 1l 14. Hours Generator On Line 530.8 2,539.5 12,413.8
15. Unit Reserve Shutdown Hours 3.42 3.42 1,731.42
16. Gruss Thermal Energy Generated (MWH) 1.012.290 5.699.595 25,899,102 .
17. Gross Electrical Energy Generated (MWH) 339.042 _,

1,922,601 8,646,11T

18. Net Electrical Energy Generated (MWH) 309.064 1,792,851 7,963,429
19. Unit Service Factor 73.7 31.6 44.1
20. Unit Availability Factor 74.2 31.6- 50.6
21. Unii Capacity Factor iUsing MDC Net) 48.2 25.1 33.3
22. Unit Capacity Factor IUsing DER Net) 47.4 24.6 32.7
23. Unit Forced Outage Rate 10.7 13.6 25.0 y
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 810203o5'10

_