ML20095H376
| ML20095H376 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/30/1995 |
| From: | Wolf G, Jeffery Wood TOLEDO EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| KB-95-0203, KB-95-203, NUDOCS 9512220312 | |
| Download: ML20095H376 (5) | |
Text
_ _.. -
e a
TOLEDO
%me EDISON EDISON PLAZA j
300 MADISON AVENUE i
TOLEDO OHIO 43652-0001 l
December 20, 1995 KB-95-0203 Docket No. 50-346 License No. NPF-3 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Gentlemen:
Monthly Operating Report, November, 1995 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of November, 1995.
If you have any questions, please contact G. M. Wolf at (419) 321-8114.
Very truly yours, J n K. Wood Plant Manager Davis-Besse Nuclear Power Station GMW/dmc Enclosures cc:
L. L. Gundrum NRC Project Manager H.
J. Miller Region III Administrator S. Stasek NRC Senior Resident Inspector, Stop 4030 m
o 9512220312 951130
(
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-0346 UNIT Davis-Besse Unit 1 DATE Dec.1,1995 COMPLETED BY Gerald M. Wolf TELEPHONE 419/321-8114 MONTH November,1995 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) i 1
879 16 884 2
877 17 884 3
884 18 883 1
4 884 19 883 5
884 20 882 6
884 21 883 7
883 22 884 8
883 23 884 9
882 24 884 10 881 25 883 11 882 26 878 12 885 27 880 13 884 28 884 14 884 29 883 15 884 30 883
OPERATING DATA REPORT f
DOCKET NO 50-0346 DATE Dec.1,1995 COMPLETED BY Gerald M. Wolf TELEPHONE _419/321-8114 OPERATING STATUS
- 1. Unit Name: Davis-Besse Unit 1 Notes
- 2. Reporting Period.
Nov.,1995
_3. Licensed Thermal Power (MWt) 2772
- 4. Namepla.te Rating.(Gross MWe) 925
- 5. Delsign Electrical Rating.(Net M_We) 906
- 6. Maximum Dependable _ Capacity _(Gross _M_We) 915
- 7. Maximum Dependable _ Capacity _(Net MWe)_
871
- 8. If Changes Occurin Capacity Ratings (Items number 3 through 7) since last report, give reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any (Net MWe):
l This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.00 8,016.00 151,969.00
- 12. Number Of Hours Reactor Was Critical 720.00 8,016.00 97,961.77
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 5,532.00
- 14. Hours Generator On-Line 720.00 8,016.00 95,706.90
- 15. Unit Reserve Shutdown Hours 0.00 0.00 1,732.50
- 16. Gross Thermal Energy Generated (MWH) 1,994,509 22,106,079 248,202,152
- 17. Gross Electrical Energy Generated (MWH) 667,908 7,381,276 80,452,764
- 18. Net Electrical Energy Generated (MWH) 635,575 7,022,898 75,934,267
- 19. Unit Service Factor 100.00 100.00 62.98
- 20. Unit Availability Factor 100.00 100.00 64.12
- 21. Unit Capacity Factor (Using MDC Net) 101.35 100.59 57.37
- 22. Unit Capacity Factor (Using DER Net) 97.43 96.70 55.15
- 23. Unit Forced Outage Rate 0.00 0.00 18.48
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Scheduled maintenance and refueling outage - April 8,1996. Planned duration - 39 days.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
OPERATIONAL
SUMMARY
November 1995 Reactor power was maintained at approximately 100 percent full power until 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> on November 26,1995, when a manual power reduction was initiated to perform turbine control valve testing. Reactor power was manually reduced to approximately 94 percent full power by 0050 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />, and control valve testing was conducted. At the completion of testing at 0207 hours0.0024 days <br />0.0575 hours <br />3.422619e-4 weeks <br />7.87635e-5 months <br />, power gradually increased to approximately 100 percent full power, which was achieved at 0308 hours0.00356 days <br />0.0856 hours <br />5.092593e-4 weeks <br />1.17194e-4 months <br />. Reactor power was maintained at approximately 100 percent full power for the rest of the month.
i l
\\
l I
r l
)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-346
- UNIT NAME: Davis-Besse #1 DATE:
December 1.1995
- Completed by:
G. M. Wolf Report Month November 1995 Telephone:
(419)321-8114
<g y Licensee Cause & Corrective gf h
} g[c Event Action to AU E U No.
Date E-=
!5 O o
o 2
Report #
m Q
Prevent Recurrence Q
No Significant Shutdowns or Power Reductions I
2 F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Data S: Scheduled A-Equipment Failure (Explain) 1-Manual Entry Sheets for Licensee Event Report (LER)
B-Maintenance or Test 2-Manual Scram File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from 5
E-Operator Training & License Examination Previous Month Exhibit I - Same Source F-Administrative 5-Load Reduction
- Report challanges to Power Operated Relief Valves G-Operational Error (Explain) 9-Other (Explain)
(PORVs) and Pressurizer Code Safety Valves (PCSVs)
II-Other (Explain)
_