ML20003A382

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1980
ML20003A382
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030585
Download: ML20003A382 (1)


Text

~

l OPERATING DATA REPORT DOCKET NO. 50-346 DATE November 7, 1980 COMPLETED BY Bilal Sarsour 1

TELEPHONE (419) 259-5000, Ext. 251 OPERATING STATUS

1. Unit Name:

Davis-Besse Unit 1 Notes

2. Reporting Period:

Oc tober, 1980

3. Licensed Thermal Power (51Wt):

2772

4. Nameplate Rating (Gross SlWe):

925

5. Design Electrical Rating (Net SlWe):

906

6. Maximum Dependable Capacity (Gross SlWe):

934

7. Maximum Dependable Capacity (Net MWe):

890

8. If Changes Occur in Capacity Ratings (!! cms Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net SlWe):
10. Reasons For Restrictions. If Any:

)

This Month Yr to-Date Cumulative

!!. Hours in Reporting Period 745 7,320 27,845

12. Number Of Hours Reactor Was Critical 0

2.078 13.042 gl

13. Reactor Resene Shutdown liours 0

0 2,875.8

14. liours Gencrator On-Line 0

2.008.7 11.883

15. Unit Reserve Shutdown Hours 0

0 1,728

16. Gross Thermal Energy Generated (MWil) 0 4,687,305 24,886,812 l
17. Gross Electrical Energy Generated (MWil) 0 1,583,559 8,307,070
18. Net Electrical Energy Generated 15thil) 0 1.483.787 7.654.365
19. Unit Senice Factor 0

27.4 43.2

20. Unit Availability Factor 0

27.4 49.9

21. Unit Capacity Factor tUsing MDC Net) 0 22.8 32.9
22. Unit Capacity Factor (Using DER Net) 0 22.4 32.3
23. Unit Forced Outage Rate 0

14.3 25.6

24. Shutdowns Scheduled Oser Next 6 Months IT pe. Date.and Duration of Each):

3

25. If Shut Down At End Cf Report Period. Estimated Date of Startup:

November 6.1980

26. Units In Test Status iPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITITL ELECTRICITY CO\\tMERCI \\ L OPER ATiON 810 2 0 3 0 G.86 -

i

.