Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO. _50-3.46 _, 1980 mm DATE g

COMPLETED BY Bilal Sarsour TELEPHONE (61 0 59-5000, OPERATING STATUS

1. Unit Name:

Davis-Besse Unit 1 Notes

2. Reporting Period:

Septeciber, 1980

3. Licensed Thermal Power (31Wt):

2772

4. Nameplate Rating (Gross S!We):

925

5. Design Electrical Rating (Net StWe):

906

6. Maximum Dependable Capacity (Gross 31We):

934

7. Masimum Depenc. ble Capacity (Net 31We):

890

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

~

9. Power Level To Which Restricted,1.' Any (Net StWe):
10. Reasons For Restrictions. If Any:.

This Month Yr to.Date Cumulatise II. Hours In Reporting Period 720 6,575 27,100

12. Number Of Hours Reactor Was Critical 0

2,078 13,042 1l

13. Reactor Resene Shutdown Hours 0

0 2,875.8

14. Hours Generator On Line 0

2,008.7 11,883

15. Unit Resene Shutdown Hours 0

0 1,728

16. Cross Thermal Energy Generated (MWil) 0 4.687.305 24.886.812
17. Cross Electrical Energy Generated (>!WII) 0 1.583.559 8.307.070
18. Net Electrical Energy Generated (31Wil) 0 1.483.787 7.654.365
19. Unit Senice Factor 0

30.6 44.5

20. Unit Availability Factor 0

30.6 51.4

21. Unit Capacity Factor (Using 31DC Net) 0 25.4 33.8
22. Unit Capacity Factor (Using DER Net) 0 24.9 33.2
23. Unit Forced Outage Rate 0

14:3 25.6

24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

ctober 12, 1980

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTRICITY CO\\li!ERCIA L OPER ATION (9/77) 810 2 0 a 0 6%.

_