Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO. _50-3.46 _, 1980 mm DATE g
COMPLETED BY Bilal Sarsour TELEPHONE (61 0 59-5000, OPERATING STATUS
- 1. Unit Name:
Davis-Besse Unit 1 Notes
- 2. Reporting Period:
Septeciber, 1980
- 3. Licensed Thermal Power (31Wt):
2772
- 4. Nameplate Rating (Gross S!We):
925
- 5. Design Electrical Rating (Net StWe):
906
- 6. Maximum Dependable Capacity (Gross 31We):
934
- 7. Masimum Depenc. ble Capacity (Net 31We):
890
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
~
- 9. Power Level To Which Restricted,1.' Any (Net StWe):
- 10. Reasons For Restrictions. If Any:.
This Month Yr to.Date Cumulatise II. Hours In Reporting Period 720 6,575 27,100
- 12. Number Of Hours Reactor Was Critical 0
2,078 13,042 1l
- 13. Reactor Resene Shutdown Hours 0
0 2,875.8
- 14. Hours Generator On Line 0
2,008.7 11,883
- 15. Unit Resene Shutdown Hours 0
0 1,728
- 16. Cross Thermal Energy Generated (MWil) 0 4.687.305 24.886.812
- 17. Cross Electrical Energy Generated (>!WII) 0 1.583.559 8.307.070
- 18. Net Electrical Energy Generated (31Wil) 0 1.483.787 7.654.365
- 19. Unit Senice Factor 0
30.6 44.5
- 20. Unit Availability Factor 0
30.6 51.4
- 21. Unit Capacity Factor (Using 31DC Net) 0 25.4 33.8
- 22. Unit Capacity Factor (Using DER Net) 0 24.9 33.2
- 23. Unit Forced Outage Rate 0
14:3 25.6
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
ctober 12, 1980
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTRICITY CO\\li!ERCIA L OPER ATION (9/77) 810 2 0 a 0 6%.