Text

-

Rev. 1 - 1/22/81 -

, OPERATING DATA REPORT DOCKET NO.mm _50-3.46 _ , 1980 g DATE COMPLETED BY Bilal Sarsour TELEPHONE (61 0 59-5000, OPERATING STATUS """ "

1. Unit Name: Davis-Besse Unit 1 Notes
2. Reporting Period: Septeciber, 1980
3. Licensed Thermal Power (31Wt): 2772 ,
4. Nameplate Rating (Gross S!We): 925
5. Design Electrical Rating (Net StWe): 906
6. Maximum Dependable Capacity (Gross 31We): 934
7. Masimum Depenc. ble Capacity (Net 31We): 890
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

~

9. Power Level To Which Restricted,1.' Any (Net StWe):
10. Reasons For Restrictions. If Any: .

This Month Yr to.Date Cumulatise II. Hours In Reporting Period 720 6,575 27,100

12. Number Of Hours Reactor Was Critical 0 2,078 13,042 1l 13. Reactor Resene Shutdown Hours 0 0 2,875.8
14. Hours Generator On Line 0 2,008.7 11,883
15. Unit Resene Shutdown Hours 0 0 1,728
16. Cross Thermal Energy Generated (MWil) 0 4.687.305 24.886.812 .
17. Cross Electrical Energy Generated (>!WII) 0 .. 1.583.559 8.307.070
18. Net Electrical Energy Generated (31Wil) 0 1.483.787 7.654.365
19. Unit Senice Factor 0 30.6 44.5
20. Unit Availability Factor 0 30.6 51.4
21. Unit Capacity Factor (Using 31DC Net) 0 25.4 33.8
22. Unit Capacity Factor (Using DER Net) 0 24.9 33.2
23. Unit Forced Outage Rate 0 14:3 25.6
24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: ctober 12, 1980
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTRICITY CO\li!ERCIA L OPER ATION (9/77) 810 2 0 a 0 6%.

_