TOLEDO EDISDN A Centenor f acegy Compacy October 13, 1995
[
$$.Ecoo 1 KB95-0176 Docket No. 50-346 License No. NPF-3 U. S. Nuclear Regulatory. Commission Document Control Desk Vashington, D.C.
20555 Gentlemen:
Monthly Operating Report, September, 1995 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No I for the month of September, 1995.
If you have any questions, please contact G. M. Volf at 419-321-8114.
Vpry uly yours, b
N_
Jo K. Wood P ant Manager Davis-Desse Nuclear Power Station GMV/nig Enclosures cc:
L. L. Gundrum NRC Project Manager H. J. Miller Region III Administrator S. Stasek NRC Senior Resident Inspector, Stop 4030 20C037 9510230162 950930 Mh PDR ADOCK 05000346 lD R
~.
~
g
<J g, -
e TOLEDO h E!EllEl(31%I A Centerior Energy company E
O 1
October 13, 1995 Docket No. 50-346 License No. NPP-3 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Gentlemen:
Monthly Operating Report, September, 1995 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of September, 1995.
~ If you have any questions, please contact G. M. Volf at 419-321-8114.
V,e uly yours, f627/
Jo K. Vood P ant Manager Davis-Besse Nuclear Power Station GMV/nig Enclosures cc:
L. L. Gundrum NRC Project Manager H. J. Miller Region III Administrator S. Stasek NRC Senior Resident Inspector, Stop 4030
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-0346 UNIT Davis-Besse Unit 1 DATE Oct. 2,1995 COMPLETED BY Gerald M. Wolf TELEPHONE 419/321 8114 MONTH September,1995 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 876 16 876 2
877 17 879 3
873 18 882 4
875 19 881 5
873 20 879 6
872 21 880 7
875 22 883 8
878 23 884 9
880 24 883 10 881 25 882 11 881 26 882 12 874 27 879 13 870 28 879 14 876 29 877 15 880 30 876 f
1 OPERATING DATA REPORT DOCKET NO 50-0346
~Oci.~271T95 DATE COMPLETED BY Gerald M. Wolf
~
TELEPHONE 419/321-8114 OPERATING STATUS
- 1. Unit Name: Davis-Besse Unit 1 Notes
- 2. Reporting Period __
Sept.,1995 LLicensed Thermal Power (M_Wjt 2772
- 4. Nameplate Rating (Gross MWe) 925
- 5. D_e_ sign Electrical Rating.(Net MWe}
906
- 6. Maximum Dep_endable Capacity _(Gross M_We) 915
-7._ Maximum Dependabl.e Capacity _(Net MWe) 871
.8. If Changes Occurin Cap _acity Ratings (Items number 3 through 7) since last report, give reasons:
It_ ems 6 and 7 changed as a
_. result of the_ performance of an eight-hour maximum dependable capacity test.
- 9. Power Level To Which Restricted, if Any (Net MWe):
- 10. Reasons For Restrictions, if Any (Net MWe):
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.00 6,551.00 150,504.00
- 12. Number Of Hours Reactor Was Critical 720.00 6,551.00 96,496.77 3
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 5,532.00
- 14. Hours Generator On-Line 720.00 6,551.00 94,241.90
- 15. Unit Reserve Shutdown Hours 0.00 0.00 1,732.50
- 16. Gross Thermal Energy Generated (MWH) 1,994,509 18,047,871 244,143,944
- 17. Gross Electrical Energy Generated (MWH) 664,311 6,025,489 79,096,977
- 18. Net Electrical Energy Generated (MWH) 632,210 5,732,674 74,644,042
- 19. Unit Service Factor 100.00 100.00 62.62
- 20. Unit Availability Factor 100.00 100.00 63.77
- 21. Unit Capacity Factor (Using MDC Net) 100.81 100.47 56.94
- 22. Unit Capacity Factor (Using DER Net) 96.92 96.59 54.74
- 23. Unit Forced Outage Rate 0.00 0.00 18.72
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKETNO.:
50-346 e.
UNITNAME: Davis-Besse #1 '
DATE:
October 2.1995..
Completed by:
G. M. Wolf' Report Month September 1995 Telephone:.
(419) 321-8114--
m gy Licensee Cause & Corrective y
{
fl
}fj f
Event Action to No.
Date F-og c
^U Eo
- s ::
o Q :v 2
2 Report #
m 6
Prevent Recurrence No Significant Shutdowns or Power Reductions 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Data S: Scheduled A-Equipment Failure (Explain) 1-Manual.
Entry Sheets for Licensee Event Report (LER) ~
B-Maintenance or Test 2-Manual Scram File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from 5
E-Operator Training & License Examination Previous Month Exhibit I-Same Source F-Administrative 5-Load Reduction
- Report challanges to Power Operated Relief Valves G-Operational Error (Explain) 9-Other (Explain)
(PORVs and Pressurizer Code Safety Valves (PCSVs) _
H-Other(Explain)
4 OPERATIONAL
SUMMARY
4 September 1995 t
Reactor power was maintained at approximately 100 percent full power
]
until 0003 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on September 3,1995, when a manual power reduction was initiated to perform control valve testing. Reactor power was manually reduced to approximately 92 percent full power by 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />, and control valve testing was conducted. At the completion of testing at 0134 hours0.00155 days <br />0.0372 hours <br />2.215608e-4 weeks <br />5.0987e-5 months <br />, power was gradually increased to approximately 100 percent full power, which was achieved at 0224 hours0.00259 days <br />0.0622 hours <br />3.703704e-4 weeks <br />8.5232e-5 months <br />. Reactor power was maintained at approximately 100 percent full power for the rest of the month.