Revised Monthly Operating Rept for June 1980
ML20003A361
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030558
Download: ML20003A361 (1)


Text

e Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.

50-346 DATE July 6, 1980 COMPLETED BY Bilal sarsour TELEPHONE 259-5000 ext. 251 OPERATING STATUS

1. Unit Name:

Davis-Besse Unit #1 Notes

2. Reporting Period:

June, 1980

3. Licensed Thermal Power IMW ):

925

4. Nameplate Rating (Gross MWe):
5. Design Electrical RatingiNet MWe):

906

6. Masimum Dependable Capacity (Gross MWe):

934

7. Maximum Dependable Capacity (Net MWe):

890

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Lese! To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr to-Date Cumulatise II. Hours In Reporting Period 720 4,367 24,892

12. Number Of Hours Reactor Was Critical 0

2,078 13,042 1l

13. Reactor Resene Shutdown Hours 0

0 2.875.8

14. Hours Generator On Line 0

2,008.7 11,883.0

15. Unit Reserve Shutdown Hours 0

0 1,728

16. Gross Thermal Energy Generated (MWH) 0 4.687.305 24,886,812
17. Gross Electrical Energy Generated (MWii)

O 1.583,559 8.307.070

18. Net Electrical Energy Generated (MWH) 0 1,483,787 7.654.365
19. Unit Senice Factor O

46.0 48.8

20. Unit Asailability Factor 0

46.0 56.4

21. Unit Capacity Factor (Using MDC Net) 0 38.2 37.1
22. Unit Capacity Factor iUsing DER Net) 0 37.5 36.4
23. Unit Forced Outage Rate 0

14.3 25.6

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

July 28, 1980

26. Units in Test Status iPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMM ERCI A L OPERATION I

(4/77) 810 2 0 3 0 %g

~

-