ML20005E602

From kanterella
Revision as of 06:32, 29 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev to Physical Security Plan Re Fuel Storage in Spent Fuel Pool to Reflect Defueled Facility Ol.Rev Withheld (Ref 10CFR73.21(jj))
ML20005E602
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/05/1990
From: Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SNRC-1672, NUDOCS 9001090113
Download: ML20005E602 (2)


Text

i SAFSHARDS INFORMATION m

t LJONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION .

P.o. sox eso, wonrw couwiny noAo . waoewe novan, n.v. Site.

ENCLOSURE CONTAINS ,

SAFEGUARDS INFORMATION, s anuaan a. creioen, a UPON SEPARATION THis '

assnvawr vice ensaiosur-wuctuan o,enariou.

PAGE l$ DICONTROLLED SNRC-1672 FJAN 5 sm ,

i U. S. Nuclear Regulatory Commission ATTN: -Document Control Desk Washington, D.C. 20555 Request to Amend the Physical Security Plan for the Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 1

Gentlemen:

Pursuant to 10CFR50.54 (p) (1) and.50.90, Long Island Lighting Company (LILCO or the Company) hereby submits a request to amend the Shoreham Nuclear Power Station Physical Security Plan. This request is made in conjunction with LILCO's application, being filed concurrently with the NRC, to amend Shoreham's operating license NPF-82 to create a Defueled Facility Operating License.

L The regulatory and technical bases for LILCO's proposed plan revisions, as well as a copy of the plan as revised, are provided in the attached documents, described below.

4 I. Attachment 1 - Amendment Request Attachment I to this letter is an application to amend the Shoreham Physical Security Plan. As required by 10CFR50. 91 (a) (1) , the application includes a "no significant hazards consideration" analysis. This analysis concludes that the proposed plan changes do not involve a "significant hazards consideration," and that LILCO should be granted the proposed amendment to be effective upon issuance.

II. Attachment 2 - Revised Physical Security Plan Attachment 2 is the proposed revised plan, entitled "Shoreham \

Nuclear Power Station Security Plan for Fuel Storage in the Spent Fuel Pool." Since this proposed new security plan contains

" Safeguards Information" as defined in 10CFR7 3.2 (j j) , Attachment 2 is:proyided under restricted cover. Attact. ment 2 gcggg L i88'3855388858322 SAFalARDS WORMATION SggjuARggOg^,

,, , Tion-C l PAGE IS DECONTROLLEQ

t

~

,,,c_,,,, MM MM ,

g Page 2 -

! a summary of.the changes to the current Physical Security Plan that would result if LILCO is allowed to implement the proposed new plan. In general, LILCO seeks NRC permission to redefine Shoreham's " Vital Areas," pursuant to 10CFR73.2(h), to reflect the plant's non-operating, defueled condition. Even as amended the plan will continue to meet the standards established in 10CFR73.55, since the proposed changes consist primarily of the elimination of certain prior commitments by LILCO which exceed 7 NRC requirements.

If you have any questions regarding this submittal, please do not hesitate to contact my office for further information.

Very truly yours, l

4 W. E. Steicter Jr.

Assistant Vice President Nuclear Operations GJG/ap Enclosures cc: J. Dunkleberger S. Brown W. T. Russell F. Crescenzo 1'

1 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION, l- UPON SEPARATION THIS PAGE IS DECONTROLLED SAFBilARDS INf0RMAil0N L . - . . ._._ _ _ _ _