MONTHYEARML23254A0562023-09-13013 September 2023 Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel ML22277A8412022-10-18018 October 2022 Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel ML22243A0322022-09-0707 September 2022 Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis ML22236A0602022-08-29029 August 2022 Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral ML22215A2872022-08-0909 August 2022 Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request ML22082A1482022-03-23023 March 2022 Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) ML21076A3322021-03-18018 March 2021 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides ML20226A4112020-08-19019 August 2020 Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request ML20176A2762020-06-29029 June 2020 Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML20143A0772020-05-26026 May 2020 Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request ML20111A0352020-04-20020 April 2020 Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML19143A4722019-06-0303 June 2019 Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment Request ML19128A4072019-05-0909 May 2019 Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request ML19063D9452019-03-0707 March 2019 Presentation Material for 3/07/19 Pre-Submittal Meeting License Amendment Request to Revise Technical Specification 3.8.1.1 ML19022A2432019-01-22022 January 2019 Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18310A1812018-11-0808 November 2018 Presentation Material for 11/08/18 Pre-Submittal Meeting 10 CFR 50.69 Risk Informed Approach License Amendment Request ML18108A2072018-04-10010 April 2018 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump ML17230A1282017-08-31031 August 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017 ML17200C9572017-07-18018 July 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017 ML16272A3462016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) ML16272A3472016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) ML16125A0092016-05-0303 May 2016 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request ML15353A0022015-12-17017 December 2015 /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 ML15344A2942015-12-10010 December 2015 /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 ML15314A1022015-10-20020 October 2015 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision ML15198A3432015-06-22022 June 2015 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly ML15155B3692015-05-21021 May 2015 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13305A1442013-10-31031 October 2013 Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides ML1014101592010-05-21021 May 2010 April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council ML0910506232009-04-23023 April 2009 NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides ML0909800642009-04-0808 April 2009 Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process ML0808800832008-03-28028 March 2008 Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0730502942007-11-0101 November 2007 TSTF Status Spreadsheet for 11-01-2007 Meeting ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0608300792006-03-24024 March 2006 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station ML0532501622005-11-22022 November 2005 Att. 4 Millstone Power Station Appeal Faq 55.2 ML0524300932005-08-18018 August 2005 Att. 6, FAQ Log ML0527701902005-08-16016 August 2005 Mantg Conference, 8/16/05 - Plenary - Welcoming Speech on Predictability by J. Alan Price, Site Vice President Millstone Power Station, Dominion Nuclear ML0515304782005-05-18018 May 2005 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) Ref: Special Inspection Team Results of April 17, 2005 Event ML0507303932005-03-14014 March 2005 NRC Slides for Public Meeting with Dominion Nuclear Connecticut, Inc. (Millstone Station) Ref: Annual Assessment Performance ML0331604212003-11-21021 November 2003 Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs ML0309003222003-03-20020 March 2003 Notice of Meeting EOC Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 ML0309003542003-03-20020 March 2003 Notice of Meeting Neac Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-09-13
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24135A0812024-05-14014 May 2024 5/16/2024, Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML23254A0562023-09-13013 September 2023 Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel ML23073A0042023-03-14014 March 2023 Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML22277A8412022-10-18018 October 2022 Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel ML22243A0322022-09-0707 September 2022 Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis ML22236A0602022-08-29029 August 2022 Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral ML22215A2872022-08-0909 August 2022 Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request ML22082A1482022-03-23023 March 2022 Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) ML21076A3322021-03-18018 March 2021 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides ML20226A4112020-08-19019 August 2020 Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request ML20176A2762020-06-29029 June 2020 Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML20143A0772020-05-26026 May 2020 Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request ML19143A4722019-06-0303 June 2019 Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment Request ML19128A4072019-05-0909 May 2019 Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request ML19022A2432019-01-22022 January 2019 Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request ML18108A2072018-04-10010 April 2018 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17230A1282017-08-31031 August 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017 ML17200C9572017-07-18018 July 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017 ML16272A3472016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) ML16272A3462016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) ML16125A0092016-05-0303 May 2016 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request ML15353A0022015-12-17017 December 2015 /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 ML15344A2942015-12-10010 December 2015 /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 ML15314A1022015-10-20020 October 2015 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision ML15198A3432015-06-22022 June 2015 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly ML15155B3692015-05-21021 May 2015 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13305A1442013-10-31031 October 2013 Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides IR 05000336/20110102011-08-0808 August 2011 EA-11-047, Millstone - Final Significance Determination for White Finding, W/Assessment Follow-up;Notice of Violation and Results of Regulatory Conference (NRC Special Inspection Report No. 05000336/2011010) ML1120005362011-07-19019 July 2011 EA-11-047, Millstone Regulatory Conference-July 19, 2011-Dominion Slides ML1120005282011-07-19019 July 2011 EA-11-047, Millstone Regulatory Conference-July 19, 2011 NRC Slides ML1118800642011-07-0707 July 2011 NRC Slides - Millstone/Neac Public Meeting on May 25, 2011 ML1118800332011-07-0707 July 2011 NRC Slides - Millstone 2011 Annual Assesssment Meeting ML1019505052010-07-13013 July 2010 MPS3 RAI 6 ML1014101592010-05-21021 May 2010 April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council ML1005009822010-02-17017 February 2010 Spent Fuel Pool Criticality Presentation for Feb 17 Public Meeting ML0910506232009-04-23023 April 2009 NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides ML0909800642009-04-0808 April 2009 Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process ML0911200622009-03-31031 March 2009 Post Exam Comment Miscellaneous References (Folder 1) ML0808801002008-04-0202 April 2008 Slides - NRC Annual Performance Assessment of Millstone, 2007 Reactor Oversight Process ML0808800832008-03-28028 March 2008 Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0707907302007-03-20020 March 2007 2006 NRC and Neac Public Meeting Slides to Discuss Millstone Station Annual Assessment Performance EOC 2006-07 ML0707907132007-03-20020 March 2007 2006 Millstone Annual Assessment Meeting Slides 2006-07 EOC ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0608300792006-03-24024 March 2006 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station ML0608202022006-03-23023 March 2006 NRC Slides for Public Meeting with Dominion Nuclear (Millstone) to Discuss CY2005 Performance 2024-05-14
[Table view] |
Text
Millstone Station Annual Assessment Meeting Reactor Oversight Program Assessment 2004 Nuclear Regulatory Commission - Region 1 King of Prussia, PA March 29, 2005
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available for public questions and comments
Purpose of Todays Meeting z A public forum for discussion of the Millstone Stations performance z NRC will address Millstone Stations performance as discussed in the annual assessment letter z Millstone Station will respond to the information provided and inform the NRC of new or existing programs to maintain or improve their performance
NRC Representatives z Randy Blough, Director Division of Reactor Projects (DRP) z (610) 337-5229 z Paul Krohn, Branch Chief, DRP z (610) 337-5120 z Max Schneider, Senior Resident Inspector, DRP z (860) 447-3170 z Silas Kennedy, Resident Inspector, DRP z (860) 447-3170 z Kevin Mangan, Resident Inspector, DRP z (860) 447-3170
NRC Performance Goals z Safety: Ensure protection of public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRCs strategic objective
Reactor Oversight Process Strategic Performance Areas (3 - Total)
Safety Cornerstones (7 - Total)
Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
REGULATORY FRAMEWORK PUBLIC HEALTH AND SAFETY NRCs Overall AS A RESULT OF CIVILIAN Safety Mission NUCLEAR REACTOR OPERATION Strategic Performance REACTOR RADIATION Areas SAFEGUARDS SAFETY SAFETY Cornerstones PUBLIC OCCUPATIONAL INITIATING MITIGATING BARRIER EMERGENCY PHYSICAL RADIATION RADIATION EVENTS SYSTEMS INTEGRITY PREPAREDNESS SAFETY PROTECTION SAFETY SAFETY PROBLEM HUMAN CONSCIOUS IDENTIFICATION PERFORMANCE WORK ENVIRONMENT AND RESOLUTION Cross-Cutting Areas
Examples of Baseline Inspections z Equipment Alignment ~92 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~100 hrs every 2 yrs z Worker Radiation Protection ~100 hrs/yr z Corrective Action Program ~200 hrs every 2 yrs z Corrective Action Reviews ~60 hrs/yr z Safety System Design ~420 hrs every 2 yrs
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Effort Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstones 3 Unacceptable 0 Total 102*
- One plant, Davis-Besse, not included in totals, is in a separate assessment process.
National Summary z Performance Indicator Results (at end of 2004)
Green 1834 White 6 Yellow 0 Red 0 z Total Inspection Findings (2004)
Green 778 White 11 Yellow 0 Red 0
Millstone Performance Indicators www.nrc.gov/NRR/OVERSIGHT/ASSESS Then click on Millstone 2 or Millstone 3
Millstone Inspection Activities (Jan 1 - Dec 31, 2004) z Hours of inspection related activities:
- 4685 hours0.0542 days <br />1.301 hours <br />0.00775 weeks <br />0.00178 months <br /> at Millstone Unit 2
- 4205 hours0.0487 days <br />1.168 hours <br />0.00695 weeks <br />0.0016 months <br /> at Millstone Unit 3 z 3 resident inspectors assigned to the site z Inspections Regional Team Units 2 and 3 4 3 Unit 2 only 2 2 Unit 3 only 1 4 z Inspection findings
- 7 findings of very low safety significance (Green) at Unit 2
- 4 findings of very low safety significance (Green) at Unit 3
Millstone Station Assessment Results (Jan 1 - Dec 31, 2004) z Operated safely. Preserved public health & safety.
Fully met all cornerstone objectives.
z Licensee response column of the Action Matrix for the fourth quarter of 2004 (cornerstone objectives fully met).
z Millstone Unit 2 in Regulatory Response column for 2nd and 3rd quarter of 2004.
z NRC will conduct baseline inspections during the next cycle (Jan 1 - Dec 31, 2005)
Planned Millstone Inspection Activities (Jan 1 - Dec 31, 2005) z ROP inspections Regional Team Units 2 and 3 1 1 Unit 2 only 3 3 Unit 3 only 2 3
NRC Security Program Update z NRC has issued Orders (February 2002) that require:
z Increased Patrols z Augmented Security Capabilities z Added Barriers and Posts z Enhanced Personnel Screening for Access z Enhanced Security Awareness z NRC, Office of Nuclear Security and Incident Response Formed (April 2002) z NRC established Threat Advisory and Protective Measure System (August 2002)
NRC Security Program Update (continued) z Access Authorization Order (January 2003) z Training Order (April 2003) z Fatigue Order (April 2003) z Design Basis Threat Order (April 2003) z Changes to Site Security plans to incorporate the requirements of the orders (April 2004)
NRC Security Program Update (continued) z Expanded Force-on-Force Exercises z New NRC Baseline Inspection Program initiated (February 2004) z All Security Upgrades were required to be completed by October 29, 2004 and are currently being inspected through the baseline inspection program
Ways for the Public To Become Informed &
Involved in the Regulatory Process Examples
- Participate in NRC Public Meetings
- Sign up to be on the NRC mailing list
- Visit the NRC website on a regular basis
- Publicly comment on proposed licensing actions or file a Petition for Rulemaking
- Contact the NRC via E-mail, mail or phone to address questions or areas of concern
- Participate in open NRC/industry symposiums
- Request information through the Freedom of Information Act (FOIA)
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free) z Public Comment & Involvement in Rulemaking http://ruleforum.llnl.gov
Contacting the NRC z Report an emergency z (301) 816-5100 (call collect) z Report a safety concern:
z (800) 695-7403 z Allegation@nrc.gov z General information or questions z www.nrc.gov z Select What We Do for Public Affairs z Main Contact z Paul Krohn, Branch Chief, Division of Reactor Projects z (610) 337-5120 z Email at: PGK1@nrc.gov
Licensee Response and Remarks Millstone Nuclear Power Station Unit 2 and Unit 3 Dominion Nuclear Connecticut, Inc.