NRC Annual Performance Assessment of Millstone 2007 Reactor Oversight Process

Purpose of Todays Meeting

  • Discuss Millstones Plant Performance for CY 2007
  • Provide Dominion the opportunity to respond to the NRCs Annual Performance Assessment and to identify new or existing programs to continue to improve performance
  • Provide stakeholders the opportunity to engage the NRC staff on plant performance issues and our role in ensuring safe plant operations 2

Agenda

  • Introduction
  • NRC Organization and Performance Goals
  • Reactor Oversight Process (ROP)
  • National Summary of Plant Performance
  • Millstones Plant Performance Assessment
  • Dominion Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions 3

Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator David C. Lew Marsha K. Gamberoni Director Division of Reactor Projects Director Division of Reactor Safety James W. Clifford Darrell J. Roberts Deputy Director Deputy Director Raymond J. Powell Regional Specialists Branch Chief Millstone Resident Inspectors Project Engineers Steve W. Shaffer - Senior RI Barry S. Norris - Senior PE Jamie C. Benjamin - RI Nicole S. Sieller - PE James A. Krafty - RI 4

NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials 5

Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Radiation Safeguards Safety Safety Public Occupational Initiating Mitigating Barrier Emergency Physical Radiation Radiation Events Systems Integrity Preparedness Protection Safety Safety 6

Reactor Oversight Process S tra te g ic P e rfo r m a n c e A re a s S a fety C o rn e r s to n e s B a s e lin e In s p e c tio n P e r fo r m a n c e In d ic a to r R e s u lts R e s u lts S ig n ific a n c e S ig n ific a n c e T h r e s h o ld T h r e s h o ld A c tio n M a tr ix R e g u la to ry R e s p o n s e 7

Typical Baseline Inspection Areas

  • Equipment Alignment
  • Maintenance
  • Fire Protection
  • Operator Response
  • Radiological Environmental Monitoring
  • Worker Radiation Protection
  • Corrective Action Program
  • Corrective Action Case Reviews 8

NRC Performance Indicators Initiating Events PIs

  • Unplanned Scrams with Complications
  • Emergency AC Power System
  • High Pressure Injection System
  • Cooling Water Support Systems
  • Drill / Exercise Performance
  • Emergency Response Organization Participation
  • Alert and Notification System Radiation Protection PIs
  • Occupational Exposure Control Effectiveness
  • RETS / ODCM Radiological Effluent Security PIs are not Publicly Available 9

Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White Requires increased NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue 10

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone

  • Increasing Safety Significance
  • Increasing NRC Inspection Efforts
  • Increasing NRC/Licensee Management Involvement
  • Increasing Regulatory Actions 11

National Summary of Plant Performance (at end of 2007)

Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104 12

National Summary of Plant Performance (at end of 2007)

Performance Indicator Results 3/4 Green 1954 3/4 White 8 3/4 Yellow 2 3/4 Red 0 Total Inspection Findings 3/4 Green 918 3/4 White 9 3/4 Yellow 2 3/4 Red 0 13

NRC Inspection Activities at Millstone (for CY 2007)

  • 6680 hours0.0773 days <br />1.856 hours <br />0.011 weeks <br />0.00254 months <br /> of inspection and related activities
  • 3 resident inspectors on-site
  • 17 regional inspections
  • 4 major team inspections:

Licensed Operator Requalification Physical Security Fire Protection Modifications / 50.59 14

Millstone PIs / Findings (CY 2007)

  • All Green Performance Indicators
  • 14 Green inspection findings 15

Example NRC Inspection Findings

  • Green - Failure to properly implement a safety-related surveillance procedure resulted in a Safety Injection Accumulator being inoperable
  • Green - Inadequate work procedure for a Unit 2 Charging pump resulted in pump failure 16

NRC Annual Assessment Summary Millstone

  • Dominion operated the plant safely and in a manner that preserved public health and safety and protected the environment
  • Millstone remained in the Licensee Response column of the NRCs Action Matrix for all four quarters of 2007
  • All cornerstone objectives were fully met
  • NRC plans baseline inspections at Millstone for the remainder of CY 2008 17

Licensee Response and Remarks Mr. J. Alan Price Site Vice President Dominion Resources 18

Contacting the NRC

  • Report an emergency:

3/4 (301) 816-5100 (call collect)

  • Report a safety concern:

3/4 (800) 695-7403 3/4 Allegation@nrc.gov

  • General information or questions:

3/4 www.nrc.gov 3/4 Select News and Information for a link to email Public Affairs 19

NRC Representatives

  • James W. Clifford, Deputy Division Director, DRP 3/4 610-337-5080
  • Raymond J. Powell, Branch Chief 3/4 610-337-6967
  • Steve W. Shaffer, Senior Resident Inspector 3/4 860-447-3170
  • Jamie C. Benjamin, Resident Inspector 3/4 860-447-3170
  • James A. Krafty, Resident Inspector 3/4 860-447-3170
  • Barry S. Norris, Senior Project Engineer 3/4 610-337-5111 20

Reference Sources 3/4 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html 3/4 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html 3/4 Public Document Room 1-800-397-4209 (Toll Free) 21

End of the Presentation Nuclear Regulatory Commission Region I King of Prussia, Pennsylvania April 17, 2008