MONTHYEARML23254A0562023-09-13013 September 2023 Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel ML22277A8412022-10-18018 October 2022 Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel ML22243A0322022-09-0707 September 2022 Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis ML22236A0602022-08-29029 August 2022 Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral ML22215A2872022-08-0909 August 2022 Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request ML22082A1482022-03-23023 March 2022 Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) ML21076A3322021-03-18018 March 2021 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides ML20226A4112020-08-19019 August 2020 Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request ML20176A2762020-06-29029 June 2020 Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML20143A0772020-05-26026 May 2020 Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request ML20111A0352020-04-20020 April 2020 Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML19143A4722019-06-0303 June 2019 Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment Request ML19128A4072019-05-0909 May 2019 Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request ML19063D9452019-03-0707 March 2019 Presentation Material for 3/07/19 Pre-Submittal Meeting License Amendment Request to Revise Technical Specification 3.8.1.1 ML19022A2432019-01-22022 January 2019 Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18310A1812018-11-0808 November 2018 Presentation Material for 11/08/18 Pre-Submittal Meeting 10 CFR 50.69 Risk Informed Approach License Amendment Request ML18108A2072018-04-10010 April 2018 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump ML17230A1282017-08-31031 August 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017 ML17200C9572017-07-18018 July 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017 ML16272A3462016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) ML16272A3472016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) ML16125A0092016-05-0303 May 2016 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request ML15353A0022015-12-17017 December 2015 /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 ML15344A2942015-12-10010 December 2015 /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 ML15314A1022015-10-20020 October 2015 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision ML15198A3432015-06-22022 June 2015 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly ML15155B3692015-05-21021 May 2015 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13305A1442013-10-31031 October 2013 Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides ML1014101592010-05-21021 May 2010 April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council ML0910506232009-04-23023 April 2009 NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides ML0909800642009-04-0808 April 2009 Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process ML0808800832008-03-28028 March 2008 Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0730502942007-11-0101 November 2007 TSTF Status Spreadsheet for 11-01-2007 Meeting ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0608300792006-03-24024 March 2006 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station ML0532501622005-11-22022 November 2005 Att. 4 Millstone Power Station Appeal Faq 55.2 ML0524300932005-08-18018 August 2005 Att. 6, FAQ Log ML0527701902005-08-16016 August 2005 Mantg Conference, 8/16/05 - Plenary - Welcoming Speech on Predictability by J. Alan Price, Site Vice President Millstone Power Station, Dominion Nuclear ML0515304782005-05-18018 May 2005 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) Ref: Special Inspection Team Results of April 17, 2005 Event ML0507303932005-03-14014 March 2005 NRC Slides for Public Meeting with Dominion Nuclear Connecticut, Inc. (Millstone Station) Ref: Annual Assessment Performance ML0331604212003-11-21021 November 2003 Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs ML0309003222003-03-20020 March 2003 Notice of Meeting EOC Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 ML0309003542003-03-20020 March 2003 Notice of Meeting Neac Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-09-13
[Table view] |
Text
TSTF Traveler Milestone Schedule Created On Schd. Mgr. TSTF.rev 425.1 431.2 446.2 475.0 478.2 493.2 498.0 501.0 11/1/2007 M. Hamm Plant Type ALL B&WOG WOG BWROG BWROG ALL PWROG ALL 301-415-1472 Status Active Active Active Active Active Active Active Active Med Age Avg Age TAC MD5711 MD3763 MD6031 MD3759 MD6057 MD5249 MD4000 MD6138 based on based on Appl Dt. 4/25/2007 11/3/2006 6/12/2007 11/16/2006 7/10/2007 4/15/2007 12/20/2006 7/20/2007 Issue Dt Issue Dt Issue Dt 6/6/2007 12/12/2006 7/12/2007 12/11/2006 7/11/2007 4/17/2007 1/16/2007 7/26/2007 5.7 6.6 Age Now 4.9 10.7 3.7 10.7 3.7 6.5 9.5 3.2 11.9 11.2 @ NOA 12.8 14.4 9.6 11.1 4.9 12.0 13.4 11.8 TACs<18m TACs<24m ITSB Lead R. Grover R. Grover T. Kolb R. Grover A. Lewin C. Schulten T. Kolb A. Lewin 100 % 100 % <= NOW 301-415-2166 301-415-2166 301-415-1428 301-415-2166 301-415-2259 301-415-1192 301-415-1428 301-415-2259 Inventory Age Goals: No Contributing APLA,EEEB, EICB, EEEB, CSGB, CPTB, more than 80% > 18 months; Tech EICB, SCVB, APLA, SCVB SBWB APLA, SCVB EICB APLA, SCVB SRXB EEEB None > 24 months Branches SBPB, SPNB 100 % 100 % <= @ NOA Risk Informed Relocate BWR Technical Risk-Informed Eval. of Control Rod Relocate Surviellance Change in Specification Clarify Containment Default Extensions to Notch Testing Stored Fuel Oil Frequencies to Technical Changes that Application of Isolation Valve (recom- TSTF Containment Frequency and and Lube Oil Sched Mile- Licensee Specifications Implement the Setpoint Completion mended) Traveler Isolation Valve SRM Insert Volume Values stones Control - End States Revised Rule Methodology Times (BAW-Schedule Title Completion Control Rod to Licensee RITSTF (BAW-2441) for Combustible for LSSS 2461) RITSTF Template Times (WCAP- Action Control Initiative 5 Gas Control Functions Initiative 4A 15791)
Application 11/1/2007 App Rev Dt 4/25/2007 11/3/2006 6/12/2007 11/16/2006 7/10/2007 4/16/2007 12/20/2006 7/20/2007 (a) ADAMS ML ML071150341 ML063100074 ML071630408 ML063250258 ML071920140 ML071070421 ML063560402 ML072040102 12/31/2007 Projected 6/15/2007 n/a 8/24/2007 3/8/2007 6/15/2007 3/8/2007 9/20/2007 Acc/Rej/Sch
- Actual 6/7/2007 5/3/2007 9/14/2007 3/1/2007 5/24/2007 3/1/2007 9/24/2007 Ltr (b)
(a)+60 days ADAMS ML ML071560054 ML070880638 ML072470693 ML070510680 ML071440183 ML070510680 ML072610502 2/14/2008 Projected 10/31/2007 5/15/2007 10/12/2007 3/1/2007 8/1/2007 5/15/2007 11/20/2007 RAI Issued
- Actual 10/2/2007 5/3/2007 TBD 2/28/2007 7/25/2007 6/13/2007 (c)
(b)+45 days ADAMS ML ML072120630 ML070880638 ML070580270 ML072050146 ML071630063 Expected 10/30/2007 na TR Approval Actual 8/29/2007 ADAMS ML ML072330227 5/14/2008 Projected 1/25/2008 8/15/2007 11/30/2007 6/1/2007 11/1/2007 10/19/2007 2/20/2008 RAI Resp.
- Actual 7/10/2007 5/22/2007 10/10/2007 (d)
(c)+90 days ADAMS ML ML071910061 ML071420428 ML072840444 7/13/2008 Projected 3/28/2008 11/23/2007 1/31/2008 8/17/2007 10/12/2007 1/7/2008 11/30/2007 5/11/2008
- Actual (FR) 8/16/2007 10/4/2007 Fed Reg NFC (e)
- ADAMS ML ML072040123 ML072000346 (d)+60 days Vol 72 FR, Vol 72 FR, Fed Reg 46103-46109 57970-57975 10/11/2008 Projected 6/28/2008 2/22/2008 4/30/2008 11/15/2007 12/7/2007 4/15/2008 2/29/2008 7/18/2008
Fed Reg NOA (f)
- ADAMS ML (e)+90 days Fed Reg 10/11/2008 Projected 6/28/2008 2/22/2008 4/30/2008 11/15/2007 12/7/2007 4/15/2008 2/29/2008 7/20/2008 Close TAC
- Actual Legend: Red Date => Projected Date has arrived or past w/ no Actual Date => As of Printed on: date, TSTF age Now or @ NOA > 18 months, or Projected Milestone date is Orange Cell
- FR NFC & NOA are n/a for Hypertext => ADAMS ML public hyperlink within 3 weeks non-CLIIP'd TSTFs; In these instances, projected NOA signifies expected date of letter Blue-Green => TSTF Traveler rescheduling information => As of Printed on: date, TSTF age Now or @ Projected NOA > 24 months; also flags TSTF Lead Red Cell and SE to TSTF Purple => Projected Date is blank; no Actual Date or text present if a Projected Milestone has arrived or passed w/ no Actual Date