Category:Letter
MONTHYEARIR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212A9012023-08-0303 August 2023 Regulatory Audit Report to Support the Review of the Amendments to Relocation of the Pressure Temperature Limit Curves to the Pressure and Temperature Limits Report IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis ML23192A5272023-07-12012 July 2023 NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23186A2062023-07-0606 July 2023 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010 ML23181A1502023-06-30030 June 2023 Combined Response to Request for Additional Information and Supplemental Information in Support of LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167A0352023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel ML23171A9562023-06-12012 June 2023 Post Exam Ltr RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 ML23123A2202023-05-0303 May 2023 Relief Request I4R-14 for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23121A1612023-05-0101 May 2023 Information Meeting (Open House) with a Question-and-Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ML23024A1372023-02-0303 February 2023 Request for Withholding Information from Public Disclosure for LaSalle County Station, Unit Nos. 1 and 2 ML23031A1972023-01-31031 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information, Inspection Report Nos. 05000373/2023011 and 05000374/2023011 IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 2024-01-05
[Table view] Category:License-Operator
MONTHYEARML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A3692020-12-0101 December 2020 ES-401-4 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A0922020-12-0101 December 2020 Sim JPM ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2322020-12-0101 December 2020 County, ES-301-4 2024-01-24
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A1012020-12-0101 December 2020 in Plant JPM ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A0222020-12-0101 December 2020 ES-301-1 SRO 2024-01-24
[Table view] |
Text
ril 8, 2005
SUBJECT:
LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000373/2005301(DRS);
05000374/2005301(DRS)
Dear Mr. Crane:
On March 11, 2005, U.S. Nuclear Regulatory Commission (NRC) examiners completed initial operator licensing examinations at LaSalle County Station. The enclosed report documents the results of the examination which were discussed on March 10, 2005, with Ms. S. Landahl and other members of your staff.
The NRC examiners administered an initial license examination operating test during the week of March 7 through March 10, 2005. A written examination was administered by LaSalle County Station training personnel on March 11, 2005. Four senior reactor operator (SRO)
applicants were administered license examinations. The results of the examinations were finalized on March 24, 2005. Each of the applicants passed all sections of their respective examinations and were issued senior operator licenses.
In accordance with 10 CFR Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
Enclosures:
1. Operator Licensing Examination Report 05000373/2005301(DRS);
0500374/2005301(DRS)
2. Simulation Facility Report 3. Written Examinations and Answer Key (SRO)
REGION III==
Docket No: 50-373; 50-374 License No: NPF-11; NPF-18 Report No: 05000373/2005301(DRS); 05000374/2005301(DRS)
Licensee: Exelon Generation Company, LLC Facility: LaSalle County Station, Units 1 and 2 Location: 2601 N. 21st Road Marseilles, IL 61341 Dates: March 7 through March 11, 2005 Examiners: B. Palagi, Chief Examiner N. Valos, Examiner Approved by: R. Lanksbury, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
ER 05000373/2005301(DRS); ER 05000374/2005301(DRS); 03/07/2005 - 03/11/2005; LaSalle
County Station; Units 1 and 2; Initial License Examination Report.
The announced operator licensing initial examination was conducted by NRC examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
A. Examination Summary
- Four senior reactor operator (SRO) applicants were each administered an initial license operating test and written examination.
- All four applicants passed all sections of their respective examinations and were issued senior reactor operator licenses. (Section 4OA5.1)
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The NRC examiners conducted an announced operator licensing initial examination during March 7, 2005, through March 11, 2005. The plant's training staff used the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, to prepare the examination outline and to develop the written examination and operating test. The NRC examiners administered the operating test from March 7, 2005, through March 10, 2005. LaSalle County Station training staff members administered the written examination on March 11, 2005. Four senior reactor operator (SRO) applicants were examined.
b. Findings
Written Examination The licensee developed the written examination. During their initial review, the NRC examiners determined that the examination, as submitted by the licensee, was within the range of acceptability expected for a proposed examination. During examination validation the week of February 21, 2005, examination changes agreed upon between the NRC and the licensee were incorporated according to the guidance contained in NUREG-1021.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
Examination changes, agreed upon between the NRC and the licensee, were made according to NUREG-1021.
Examination Results Four senior reactor operator applicants were administered written examinations and operating tests for initial operator licensing. Each of the applicants passed all sections of their respective examinations and were issued senior operator licenses.
.2 Examination Security
a. Examination Scope
The NRC examiners observed the licensees implementation of examination security and integrity measures (e.g., physical barriers, sequestering, security agreements, sampling criteria, and test item repetition) throughout the examination process.
b. Findings
The licensees implementation of examination security requirements during examination preparation and administration were acceptable and met the guidelines provided in NUREG-1021, Revision 9. However, during the facility licensees operating examination development one examination security incident occurred which had the potential to affect the integrity of the examination.
The incident occurred when an individual who had not signed the examination security agreement overheard two persons who were on the security agreement discussing the examination. The compromised material was deleted and replaced with new material prior to the examination validation.
The licensee documented this incident in the corrective action program (CAP) as AR 00303787. The NRC Chief Examiner was appropriately notified of the incident. The examiner reviewed the licensees assessment of this incident for a possible violation of 10 CFR 55.49, Integrity of Examinations and Tests. The examiner determined that no actual examination compromise had occurred. The apparent violation of the licensees examination security procedure was considered minor in nature and was not subject to enforcement action in accordance with NRC enforcement policy.
4OA6 Meetings
.1 Exit Meeting
The chief examiner presented the examination team's preliminary observations and findings on March 10, 2005, to Ms. Landahl and other members of the Operations and Training Department staff. No proprietary items were identified during the administration of the examination nor during the exit meetings with the licensee. The licensee acknowledged the observations and findings presented.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
Enclosure
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
S Landahl, Site Vice President
- D. Enright, Plant Manager
- C. Dieckmann, Training Director
- S. Marik, Shift Operations Superintendent
- E. Ross, Training Staff / Exam Developer
- J. Bauer, Training Staff
- S. Russell, Exelon Corporate Training
Nuclear Regulatory Commission
- D. Kimble, Senior Resident Inspector
ITEMS OPENED, CLOSED AND DISCUSSED
Opened and Closed
None
Discussed
None
LIST OF ACRONYMS USED
ADAMS Agency-Wide Document Access and Management System
CAP Corrective Action Program
DRS Division of Reactor Safety
NRC Nuclear Regulatory Commission
PARS Publicly Available Records
SRO Senior Reactor Operator
Attachment
SIMULATION FACILITY REPORT
Facility Licensee: LaSalle County Station
Facility Docket No.: 50-373; 50-374
Operating Tests Administered: March 7, 2005, through March 10, 2005
The following documents observations made by the NRC examination team during the initial
operator license examination. These observations do not constitute audit or inspection findings
and are not, without further verification and review, indicative of non-compliance with 10 CFR
55.45(b). These observations do not affect NRC certification or approval of the simulation
facility other than to provide information which may be used in future evaluations. No licensee
action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
During the operating test a reverse power trip occurred when
1B Emergence attempting to synchronize the 1B Emergency Diesel Generator. This is
Diesel reverse a known problem that was introduced when the simulator software was
power trip modified to make the simulator match the plant on the shutdown of the
Emergency Generator.
During the operating test, on one occasion, an annunciator did not give
Annunciator Horn an audible alarm. This was an isolated case, the simulator silence
push-bottons were cleaned as minor maintenance (MMI # 3929).
WRITTEN EXAMINATIONS AND ANSWER KEY (SRO)
SRO Initial Examination ADAMS Accession # ML050900107