ML21005A046
ML21005A046 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 12/01/2020 |
From: | Gregory Roach Operations Branch III |
To: | Exelon Generation Co, NRC/RGN-III/DRS/OLB |
Roach G | |
Shared Package | |
ML19127A359 | List: |
References | |
Download: ML21005A046 (4) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 1)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 3 1 1 1 0 NOR 1 1 1 3 1 1 1 SRO-I-1 I/C 2356 9
25 2346 89 13 4 4 2 SRO-U MAJ 78 7 7 4 2 2 1 TS 26 36 4 0 2 2 RO RX 4 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-2 I/C 569 2456 8
2349 12 4 4 2 SRO-U MAJ 78 7 7 4 2 2 1 TS 56 2 0 2 2 RO-1 RX 5 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 23 468 68 7 4 4 2 SRO-U MAJ 78 7 7 4 2 2 1 TS - 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 2)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-3 I/C 2356 9
469 2346 89 14 4 4 2 SRO-U MAJ 78 8 10 7 5 2 2 1 TS 26 36 4 0 2 2 RO RX 4 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-4 I/C 569 3467 9
2349 12 4 4 2 SRO-U MAJ 78 8 10 7 5 2 2 1 TS 35 2 0 2 2 RO-2 RX 5 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I I/C 23 379 68 7 4 4 2 SRO-U MAJ 78 8 10 7 5 2 2 1 TS - 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 3)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 3 1 1 1 0 NOR 1 1 1 3 1 1 1 SRO-I-5 I/C 2356 9
25 3467 9
12 4 4 2 SRO-U MAJ 78 7 8 10 5 2 2 1 TS 26 35 4 0 2 2 RO RX 4 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-6 I/C 569 2456 8
379 11 4 4 2 SRO-U MAJ 78 7 8 10 5 2 2 1 TS 56 2 0 2 2 RO-3 RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 23 468 469 8 4 4 2 SRO-U MAJ 78 7 8 10 5 2 2 1 TS - 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 4)
P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 5 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-7 I/C 2456 8
379 68 10 4 4 2 SRO-U MAJ 7 8 10 7 4 2 2 1 TS 56 2 0 2 2 RO RX 3 1 1 1 0 NOR 1 1 1 3 1 1 1 SRO-I-8 I/C 25 3467 9
2349 11 4 4 2 SRO-U MAJ 7 8 10 7 4 2 2 1 TS 35 2 0 2 2 RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I-9 I/C 468 469 2346 89 12 4 4 2 SRO-U MAJ 7 8 10 7 4 2 2 1 TS 36 2 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.