ML21005A046

From kanterella
Jump to navigation Jump to search
ES-301-5
ML21005A046
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/01/2020
From: Gregory Roach
Operations Branch III
To:
Exelon Generation Co, NRC/RGN-III/DRS/OLB
Roach G
Shared Package
ML19127A359 List:
References
Download: ML21005A046 (4)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 1)

P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 3 1 1 1 0 NOR 1 1 1 3 1 1 1 SRO-I-1 I/C 2356 9

25 2346 89 13 4 4 2 SRO-U MAJ 78 7 7 4 2 2 1 TS 26 36 4 0 2 2 RO RX 4 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-2 I/C 569 2456 8

2349 12 4 4 2 SRO-U MAJ 78 7 7 4 2 2 1 TS 56 2 0 2 2 RO-1 RX 5 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 23 468 68 7 4 4 2 SRO-U MAJ 78 7 7 4 2 2 1 TS - 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 2)

P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 2 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-3 I/C 2356 9

469 2346 89 14 4 4 2 SRO-U MAJ 78 8 10 7 5 2 2 1 TS 26 36 4 0 2 2 RO RX 4 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-4 I/C 569 3467 9

2349 12 4 4 2 SRO-U MAJ 78 8 10 7 5 2 2 1 TS 35 2 0 2 2 RO-2 RX 5 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I I/C 23 379 68 7 4 4 2 SRO-U MAJ 78 8 10 7 5 2 2 1 TS - 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 3)

P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 3 1 1 1 0 NOR 1 1 1 3 1 1 1 SRO-I-5 I/C 2356 9

25 3467 9

12 4 4 2 SRO-U MAJ 78 7 8 10 5 2 2 1 TS 26 35 4 0 2 2 RO RX 4 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-6 I/C 569 2456 8

379 11 4 4 2 SRO-U MAJ 78 7 8 10 5 2 2 1 TS 56 2 0 2 2 RO-3 RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 23 468 469 8 4 4 2 SRO-U MAJ 78 7 8 10 5 2 2 1 TS - 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: LaSalle Date of Exam: 11/2020 Operating Test No.: 2020301 A E Scenarios (Crew 4)

P V 1 2 3 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 5 1 1 1 0 NOR 1 1 2 1 1 1 SRO-I-7 I/C 2456 8

379 68 10 4 4 2 SRO-U MAJ 7 8 10 7 4 2 2 1 TS 56 2 0 2 2 RO RX 3 1 1 1 0 NOR 1 1 1 3 1 1 1 SRO-I-8 I/C 25 3467 9

2349 11 4 4 2 SRO-U MAJ 7 8 10 7 4 2 2 1 TS 35 2 0 2 2 RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I-9 I/C 468 469 2346 89 12 4 4 2 SRO-U MAJ 7 8 10 7 4 2 2 1 TS 36 2 0 2 2 RO RX NOR SRO-I I/C SRO-U MAJ TS Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.