|
---|
Category:License-Operator
MONTHYEARML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A3692020-12-0101 December 2020 ES-401-4 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A0922020-12-0101 December 2020 Sim JPM ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2322020-12-0101 December 2020 County, ES-301-4 2024-01-24
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A1012020-12-0101 December 2020 in Plant JPM ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A0222020-12-0101 December 2020 ES-301-1 SRO 2024-01-24
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 11/2020 Exam Level: RO SRO-I SRO-U Operating Test Number: 2020301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* Safety Function
- a. Start HPCS with failure of manual pushbutton (S-HP-05) A, D, EN, L, S 2
[209002 A4.05 3.8/3.8]
- b. Start Off-Gas with Main Steam High Radiation (S-OG-02) A, D, L, S 9
[271000 A2.03 3.5/3.8]
- c. N/A
- d. Bypass a Failed Local Power Range Monitor (S-NR-01) D, S 7
[215005 A4.04 3.2/3.2]
- e. Monthly Notch Withdrawal Surveillance (S-RD-01) D, S 1
[201002 A4.01 3.5/3.4]
- f. Establish Normal Nitrogen Makeup to the Drywell (S-VQ-14) M, S 5
[223001 A4.10 3.2/3.2]
- g. Respond to Loss of Bus 142X (S-AP-07) A, D, S 6
[295003 AA2.01 3.4/3.7]
- h. Respond to a Loss of Shutdown Cooling due to Pump Trip A, L, N, S 4
[205000 A2.06 3.4/3.5]
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Remove Fuses for a Stuck Open SRV (P-NB-01) P, E, R 3
[239002 A2.03 4.1/4.2] LaSalle 2016 NRC ILT Exam
- j. Defeat RCIC Isolations IAW LGA-RI-101 (P-RI-02) D, E, R, L 2
[295031 EA1.05 4.3/4.3]
- k. Respond to low Service Water Pressure due to Failed Open TCV A, N, E, R 8 IAW LOA-WS-101 [400000 K6.01 2.7/2.8]
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)
(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator